TenderDekho Logo
GEM

BSNL Portal DOT 3 TR Ductable Inverter AC Supply, Installation & Commissioning Tender 2025

Bid Publish Date

04-Nov-2025, 3:45 pm

Bid End Date

14-Nov-2025, 4:00 pm

Value

₹2,72,545

Progress

Issue04-Nov-2025, 3:45 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

82

Category

Supply of 3 TR Ductable type Inverter type Aircooled split AC unit

Bid Type

Two Packet Bid

Categories 99

Tender Overview

The procurement is issued by Bharat Sanchar Nigam Limited Portal (BSNL) under the Department of Telecommunications for the supply and installation of a 3 TR ductable type inverter air-cooled split AC unit along with installation, testing and commissioning, refrigerant piping, and ancillary fittings such as MS/GI trays, 25 mm UPVC piping, and suspension rods. The project value is ₹272,545.00 and the scope includes supply, installation, testing, and commissioning at an unspecified location. The tender terms include an option clause allowing up to 25% quantity variation during contract execution, with delivery timelines adjusting accordingly. The absence of explicit location details necessitates readiness for site-specific requirements and coordination with BSNL DOT. This procurement targets reputable HVAC vendors familiar with turnkey AC projects and integration with telecom infrastructure.

Technical Specifications & Requirements

  • Product/Service: Supply and installation of 3 TR ductable inverter-type AC units; testing & commissioning; refrigerant piping; MS/GI tray fabrication and mounting; 25 mm UPVC pipe installation; suspension rods.
  • Quantities/Value: Estimated project value ₹272,545.00; exact itemized quantities not disclosed in BOQ.
  • Standards/Compliance: Specific standards not listed in available data; vendors should anticipate standard HVAC practices and telecom site integration protocols.
  • Scope Details: Includes provisioning and fixing of metal trays, piping, and mounting hardware; emphasis on turnkey execution with testing and commissioning.
  • Delivery/Installation: Terms imply site-based delivery with post-installation testing; option clause governs quantity adjustments up to 25% and extension rules.
  • Vendor Experience: Experience in turnkey AC installation for telecom or institutional sites is advantageous; OEM authorizations may be beneficial.

Terms, Conditions & Eligibility

  • EMD: Not disclosed in available data; bidders should verify exact amount in ATC documents.
  • Delivery Terms: Delivery to commence post order; option clause allows quantity variation up to 25% of bid quantity; extended delivery timing tied to extended quantity and original delivery period with minimum 30 days.
  • Payment Terms: Not specified in provided data; verify in ATC/TC documents.
  • Documents: Submit GST certificate, PAN, experience certificates, financial statements, EMD documentation, technical bid, and OEM authorizations as applicable.
  • Warranty/Support: Not specified in extracted data; bidders should seek ATC for warranty/AMC requirements.
  • Compliance: Bidder must comply with option clause and delivery extension rules; site-specific installation constraints to be coordinated with BSNL.

Key Specifications

  • Product/service names: 3 TR ductable inverter type air-cooled split AC unit; installation, testing & commissioning

  • Quantities/values: estimated ₹272,545.00; exact itemized quantities not provided

  • Standards/certifications: not specified in tender data; prepare to meet standard HVAC installation norms and site integration

  • Delivery/installation scope: refrigerant piping, MS/GI tray fabrication & mounting, 25 mm UPVC piping, suspension rods

  • Warranty/AMC: not specified in data; confirm in ATC

Terms & Conditions

  • Option clause allows up to 25% quantity variation during contract term

  • Delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days

  • Extended delivery time may be granted within original delivery framework

  • EMD amount and payment terms to be confirmed in ATC/TC; GST/PAN and experience documents required

Important Clauses

Payment Terms

Payment terms to be clarified in ATC; bidders should expect standard government vendor payment processes after delivery and acceptance

Delivery Schedule

Delivery begins after order; option-quantity adjustment triggers recalculated delivery period with minimum 30 days

Penalties/Liquidated Damages

Penalties or LD clauses not specified in provided data; verify in ATC

Bidder Eligibility

  • Experience in supply and turnkey installation of HVAC systems for telecom or government sites

  • GST registration and PAN; financial stability demonstrated by available statements

  • OEM authorization or compliance with standard procurement tender requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of 3 TR Ductable type Inverter type Aircooled split AC unit , Installation Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit , Providing and laying of refrigerant pipes and other works , Proving and fixing of MS or GI Tray , Supplying and fixing of 25 mm dia of UPVC Pipe , Providing and fixing of suspension round rods

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8547965.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Supply of 3 TR Ductable type Inverter type Aircooled split AC unit,Installation Testing and Commiss

Bharat Sanchar Nigam Limited Portal(bsnl)

CHITTOOR, ANDHRA PRADESH

Posted: 21 June 2025
Closed: 3 July 2025
GEM

Supply of 3 TR Ductable Inverter type Aircooled split AC unit,Installation Testing and Commissionin

Bharat Sanchar Nigam Limited Portal(bsnl)

CHITTOOR, ANDHRA PRADESH

Posted: 21 June 2025
Closed: 3 July 2025
GEM

Supply of 3 TR Ductable type 3 phase Inverter type Aircooled split AC unit,Installation Testing and

Bharat Sanchar Nigam Limited Portal(bsnl)

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 23 January 2025
Closed: 3 February 2025
GEM

Supply of 3 TR Ductable type 3 phase Inverter type Aircooled split AC unit,Installation Testing and

Bharat Sanchar Nigam Limited Portal(bsnl)

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 22 January 2025
Closed: 3 February 2025
GEM

Supply of 3 TR Ductable type 3 phase Inverter type Aircooled split AC unit,Installation Testing and

Bharat Sanchar Nigam Limited Portal(bsnl)

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 23 January 2025
Closed: 3 February 2025
GEM

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Supply of 3 TR Ductable type Inverter type Aircooled split AC unit

Supply of 3 TR Ductable type Inverter type Aircooled split AC unit with scroll or twin rotary compressor single circuit refrigerant type with not less than 36000 BTU per hr, having EER of Min 10 BTU per Watthour and Static pressure of min 45 pascals with copper coils evaporator and condenser, complete gas charge as per specification as required Note Rate shall be quoted inclusive of GST

2 nos Delivery: 30 days
#2

Installation Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit

Installation, Testing and Commissioning of 3 TR Ductable type Air cooled split AC unit with scroll or twin rotary compressor as per specification including lifting and positioning of indoor and outdoor units including pre-testing including pressure testing with nitrogen, vacuumisation charging of refrigerant gas, supplying and laying of power supply cable on surface or recess from outdoor unit to the nearby existing supply terminal box as required. Note Rate shall be quoted inclusive of GST

2 nos Delivery: 30 days
#3

Providing and laying of refrigerant pipes and other works

Providing and laying on existing tray/ wall / partition of refrigerant connection with copper tubes of suitable gauge and sizes as per manufacturer recommendation for both suction and liquid lines including Supplying and Fixing of all required accessories such as bends elbows couplings including brazing, pressure testing, Providing and fixing suitable clamps supports and insulating the refrigerant lines with insulation hoses or with nitrile rubber sleeve wrapped with thermal tape etc including Interconnection cabling between Indoor to Outdoor units complete as required. Note Rate shall be quoted inclusive of GST

30 mtrs Delivery: 30 days
#4

Proving and fixing of MS or GI Tray

Proving and fixing of MS or GI Tray of suitable size for the above copper tubes including cutting, welding etc., as required.Note Rate shall be quoted inclusive of GST

20 mtrs Delivery: 30 days
#5

Supplying and fixing of 25 mm dia of UPVC Pipe

Supplying and fixing of 25 mm dia of UPVC Pipe along with accessories in surface or recess including cutting the wall/partition and making good the same as required for condensate water drain . Note Rate shall be quoted inclusive of GST

20 mtrs Delivery: 30 days
#6

Providing and fixing of suspension round rods

Providing and fixing of suitable size suspension round rods with anchor bolts in ceiling capable of bearing Indoor Unit including providing double nuts on each suspension rod and making good damages Note Rate shall be quoted inclusive of GST

8 nos Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar HVAC supply/installation

4

Financial statements or turnover proof

5

EMD documentation (amount to be confirmed in ATC)

6

Technical bid documents

7

OEM authorization/authorization letters (if required)

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for the BSNL DOT HVAC tender 3TR installation

Bidders should submit GST, PAN, experience certificates, financial statements, and EMD documents as per ATC. Provide OEM authorizations if required and technical bid demonstrating turnkey installation capability, refrigeration piping, and suspension hardware. Ensure compliance with the 25% option clause and deliver as per delivery schedule.

What documents are required for BSNL HVAC procurement bid 2025

Submit GST certificate, PAN, experience certificates for similar installations, financial statements, EMD proof, technical bid, and OEM authorization letters. ATC may mandate site-specific safety approvals and manufacturer certifications; ensure all documents reflect current company details and authorization dates.

What are the technical requirements for 3 TR ductable AC tender

Expect supply and installation of a 3 TR ductable inverter-type AC, including refrigerant piping, MS/GI trays, 25 mm UPVC pipes, and suspension rods. While explicit standards are not listed, bidders should align with standard HVAC practices and telecom site integration norms.

When is the delivery deadline for BSNL HVAC tender 2025

Delivery timing is governed by the option clause: quantity increases trigger extended delivery using (increased/original quantity) × original delivery period with a minimum of 30 days; verify the exact order date and delivery start in the final contract.

What is the EMD amount for the BSNL HVAC procurement

The EMD amount is not disclosed in the available data; bidders must check the ATC document for the exact EMD value and acceptable modes of payment (DD/online) to ensure timely bid submission.

How to confirm OEM authorization for BSNL 3TR AC project

Obtain OEM authorization letters or dealership confirmations valid for the tender period. Include manufacturer name, model compatibility, warranty terms, and service support commitments; ensure authorization covers turnkey installation and maintenance for telecom sites.

What are the site installation requirements for BSNL AC project

Prepare for telecom-site AC installation including refrigerant piping, MS/GI tray mounting, 25 mm UPVC plumbing, and suspension rods. Coordinate with BSNL for on-site power, space, mounting, and safety clearances; ensure cable routing and ventilation comply with standard telecom infrastructure practices.

Similar Tenders

5 found
Urgent

Supply of 1.5 TR Inverter type 5 Star rated split Air-Conditioner unit,Installation, Testing and Co

Bharat Sanchar Nigam Limited Portal(bsnl)

📍 KOLKATA, WEST BENGAL

Est: ₹2.4 L
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Supply of ductible Split AC,ITC of SAC,Pdg. and installing copper pipe,Pdg. and installing copper p

Bharat Sanchar Nigam Limited Portal(bsnl)

📍 KAMRUP, ASSAM

EMD: ₹83,335
Est: ₹41.7 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

Supply of 5 star rated single phase 2 TR Split invertor air conditioner along with standard accesso

Mormugao Port Trust

📍 SOUTH GOA, GOA

EMD: ₹22,500
Est: ₹15.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Government Tender Published for Supply, Installation, Testing, Commissioning and Handing over of 4 nos. Air Cooled Ductable Air Conditioners (cooling and heating) and Split Type ACs in various rooms at Newly Constructed Research Centre in Post Graduate Government College, Sector-11 in CHANDIGARH, CHANDIGARH

Chandigarh Administration

📍 CHANDIGARH, CHANDIGARH

EMD: ₹95,206
Est: ₹47.6 L
⏰ Deadline: 2 days left
🛒 Type: Works
View EPROCURE
Urgent

Tender Notice for Supply, Installation,Testing and Commissioning of Inverter 1.5 ton split Air Conditioner. in GANJAM, ODISHA

Indian Rare Earths Limited

📍 GANJAM, ODISHA

Est: ₹2.2 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View EPROCURE
Chat with us