Bid Publish Date
27-Feb-2026, 9:43 pm
Bid End Date
10-Mar-2026, 9:00 am
Location
Progress
Quantity
5
Category
Goggles 3
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of goggles and related accessories in Leh (Jammu & Kashmir 194101). The BOQ lists 5 items under the goggles category, including Goggles 3, Goggles battery, Goggles headband, Goggles power cable, and OTG cable goggles, with no explicit quantities or values disclosed. An option clause allows ±25% quantity variation at contract, with extended delivery calculated from the original delivery period. A 5-day window for Detailed Design Drawings prior to fabrication is mandated, with approvals guiding the delivery timeline. The tender emphasizes non-obsolescence, requiring products to have at least 3 years residual market life. GST implications are bidder-borne, with reimbursement as actuals up to quoted rates. A vendor-code process compels submission of PAN, GSTIN, cancelled cheque, and EFT mandate. Experience must cover regular supply to Central/State Govt Organizations/PSUs for 3 years, through the OEM or through resellers.
Product: Goggles 3, Goggles battery, Goggles headband, Goggles power cable, OTG cable goggles
Experience: 3 years of regular Govt/PSU supply of similar category products
Delivery: Drawing approval within 5 days of award; delivery period adjusted if approvals are delayed
Market life: Offered items must have at least 3 years remaining market life
GST: Reimbursement as actuals or at quoted rate, whichever is lower
Option Clause allows ±25% quantity change at contract start and during currency
Drawing approval mandatory; delays shift delivery period without LD
3 years residual market life required for offered products
GST borne by bidder; reimbursements limited to actuals or lower quoted rate
Vendor-code documents: PAN, GSTIN, cancelled cheque, EFT mandate
GST reimbursement as actuals or lower quoted rate; payment terms not explicitly fixed in data
Delivery period linked to approval of Detailed Design Drawings; no LD if Buyer delays approvals
No explicit LD figures provided; delivery delays may shift timelines per clause
3+ years in government/PSU supply of goggles or similar accessories
OEM or authorized reseller with evidence of contracts
GST registration and PAN provided; EFT mandate operational
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Goggles 3 , Goggles battery , Goggles headband , Goggles power cable , OTG cable goggles
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Goggles 3
Goggles 3
Goggles battery
Goggles battery
Goggles headband
Goggles headband
Goggles power cable
Goggles power cable
OTG cable goggles
OTG cable goggles
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Goggles 3 | Goggles 3 | 1 | pieces | 27mech | 30 | |
| 2 | Goggles battery | Goggles battery | 1 | pieces | 27mech | 30 | |
| 3 | Goggles headband | Goggles headband | 1 | pieces | 27mech | 30 | |
| 4 | Goggles power cable | Goggles power cable | 1 | pieces | 27mech | 30 | |
| 5 | OTG cable goggles | OTG cable goggles | 1 | pieces | 27mech | 30 |
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by bank
Past contract/supply evidence to Central/State Govt/PSU for 3 years
Detailed Design Drawings (within 5 days of award) and modifications list if any
OEM authorization or reseller proof for supply of goggles & accessories
GST and tax-related documentation as applicable
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ANA ENTERPRISES Under PMA | - | 04-03-2026 11:14:45 | |
| 2 | S R TRADERS Under PMA | - | 05-03-2026 09:37:55 | |
| 3 | S S ENTERPRISES Under PMA | - | 01-03-2026 19:08:52 | |
| 4 | SHREE SHYAM TRADERS Under PMA | - | 01-03-2026 14:49:17 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SHREE SHYAM TRADERS Under PMA | Item Categories : Goggles 3,Goggles battery,Goggles headband,Goggles power cable,OTG cable goggles | |
| L2 | ANA ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Goggles 3,Goggles battery,Goggles headband,Goggles power cable,OTG cable goggles | |
| L3 | S R TRADERS (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Goggles 3,Goggles battery,Goggles headband,Goggles power cable,OTG cable goggles | |
| L4 | S S ENTERPRISES Under PMA | Item Categories : Goggles 3,Goggles battery,Goggles headband,Goggles power cable,OTG cable goggles |
Key insights about JAMMU AND KASHMIR tender market
Register as a vendor, submit PAN, GSTIN, cancelled cheque, and EFT mandate. Provide evidence of at least 3 years Govt/PSU supply of goggles or related items and OEM/reseller authorization. Include Detailed Design Drawings within 5 days of award and comply with the 25% quantity option clause.
Mandatory documents include PAN, GSTIN, cancelled cheque, EFT mandate, and evidence of 3-year Govt/PSU supply history. Also include OEM authorization, and contract copies showing annual deliveries to Government entities; ensure GST is arranged by bidder.
No explicit specs; must not be end-of-life before 3-year residual life. Items include Goggles 3, battery, headband, power cable, and OTG cable. Ensure compliance with required market life and provide Detailed Design Drawings within 5 days of award.
Delivery is linked to approval of Detailed Design Drawings; if Buyer delays approvals, the delivery period is refixed accordingly with no LD for the delay period. Ensure timely drawing submission within 5 days.
Specific EMD amount is not disclosed in the tender data. Bidder must prepare to meet standard EMD requirements per agency policy, and ensure payment readiness through appropriate bank means as part of bid submission.
GST is bidder-borne; reimbursement will be as actuals or at the lower of actual rates or quoted GST percentage. Include GST calculations in pricing and ensure GST compliance for bid submission.
Bidders or OEMs must have regularly manufactured and supplied similar goggles to Central/State Govt/PSU for 3 consecutive years prior to bid opening; provide contract copies showing quantity delivery each year.
Delivery period is adjusted to reflect the delay; no Liquidated Damages apply for Buyer-side approval delays. Timely submission of drawings within 5 days is essential to minimize schedule impact.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS