Supply of Spare load cell for Weighbridges
Bharat Petroleum Corporation Ltd
SAGAR, MADHYA PRADESH
Progress
Quantity
1
Bid Type
Two Packet Bid
The Indian Oil Corporation Limited – Marketing Division invites bids for the procurement of a load cell along with mounting kit for Minebea weighbridge. Estimated value is ₹6,83,267.20 plus GST 18%, with no EMD payable. This is a single-tender opportunity awarded to Minebea Intec India Pvt Ltd; a Bid Security Declaration must be submitted. Work completion is within 2 months from the 15th day of LOA, and the purchaser reserves a 25% quantity variation during contract execution. Regular portal updates are required for addenda and corrigenda.
BSD submission required; EMD not applicable
Delivery within 2 months from LOA, extended via option clause
Single vendor eligibility; Minebea Intec India Pvt Ltd sole bidder
EMD is nil; BSD must be submitted as per format; GST applied to tender value at 18%
Work completion within 2 months from the 15th day of LOA; delivery period can extend with option quantity adjustments
Not specified in provided data; penalties may apply per standard GeM terms for delays
Eligible bidder must submit Bid Security Declaration
Only Minebea Intec India Pvt Ltd is accepted as primary tenderer; other bidders may be considered for future tenders
Must comply with 2-month delivery from LOA and 25% quantity variance clause
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Petroleum Corporation Ltd
SAGAR, MADHYA PRADESH
Cement Corporation Of India Limited (cci)
Damodar Valley Corporation
BOKARO, JHARKHAND
Rourkela Steel Plant
SUNDERGARH, ODISHA
Indian Army
SRINAGAR, JAMMU & KASHMIR
Tender Results
Loading results...
Bid Security Declaration (BSD) as per format
GST registration certificate
PAN card
Experience certificates (relevant to load cell/weighbridge components) if available
Technical bid documents (OEM authorization or proof of product) if required
Any existing BSD acknowledgments or compliance statements
Extended Deadline
20-Nov-2025, 9:00 am
Opening Date
20-Nov-2025, 9:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | MINEBEA INTEC INDIA PRIVATE LIMITED Under PMA | Make : intec india Model : PR6221 Title : Procurement of load cell along with mounting kit for Minebea make weighbridge | 19-11-2025 18:26:55 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MINEBEA INTEC INDIA PRIVATE LIMITED( MSE Social Category:General ) Under PMA | ₹6,83,267 | Item Categories : Procurement of load cell along with mounting kit for Minebea make weighbridge |
Please sign in or create an account to view contract details and download result documents.
Key insights about GUJARAT tender market
Bidders must submit a Bid Security Declaration and complete BSD as per format; EMD is not required. The tender targets Minebea Intec India Pvt Ltd with a 2-month delivery from LOA; ensure GST is applied at 18% to ₹6,83,267.20 and monitor the GeM portal for addenda.
Required documents include GST registration, PAN, BSD, and any OEM authorizations or technical bid documents. Since EMD is nil, the BSD becomes critical; ensure all documents are compiled before submission and verify SOR quantities on GeM portal.
Delivery must be completed within 2 months from the 15th day of LOA. The option clause allows up to 25% quantity variation with corresponding delivery adjustments, potentially extending the total duration if triggered.
Eligibility centers on submitting the Bid Security Declaration, adhering to the 2-month delivery requirement, and compliance with the 25% quantity variation clause. The tender is a single-vendor opportunity for Minebea Intec India Pvt Ltd; profile sharing for future tenders is allowed.
The tender value is ₹6,83,267.20 plus GST 18%; EMD is not required. BSD is mandatory to participate. Payment terms will follow IOC GeM terms post-delivery, with GST applied to the base tender value.
Any Addendum or Corrigendum will be published exclusively on the GeM portal. Bidders should regularly check GeM for updates to quantities, delivery terms, or deadlines to ensure compliant submission.
The procurement is conducted by the Marketing Division, Indian Oil Corporation Limited. The scope covers a Minebea weighbridge load cell with mounting kit, with BSD compliance and a two-month delivery timeline from LOA.
Detailed quantities are specified in the SOR within the tender documents; since only high-level data is provided here, bidders should refer to the GeM portal’s SOR section for exact measurements and unit counts before submission.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS