Bid Publish Date
01-Sep-2026, 5:20 pm
Bid End Date
11-Sep-2026, 6:00 pm
EMD
₹1,02,000
Value
₹34,62,200
Location
Progress
Indian Army has released a public tender for Preparation of CPR DPR for Services, Sewage disposal, Storm Water Drainage System, Road Path Culve, All drawings and calculations in MUMBAI, MAHARASHTRA. Quantity: 256. Submission Deadline: 11-09-2026 18: 00: 00. Download documents and apply online.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | B.J. MEHTA ARCHITECTURAL & STRUCTURAL CONSULTANTS PRIVATE LIMITED Under PMA | - | 08-09-2026 16:01:33 | |
| 2 | GEO DESIGNS AND RESEARCH PRIVATE LIMITED Under PMA | - | 09-09-2026 15:20:25 | |
| 3 | INERTIA ENGINEERING SOLUTIONS Under PMA | - | 11-09-2026 11:06:12 | |
| 4 | SAI GEOTECHNICAL LAB Under PMA | - | 11-09-2026 15:43:06 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | GEO DESIGNS AND RESEARCH PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Preparation of CPR DPR for Services,Sewage disposal,Storm Water Drainage System,Road Path Culve,All | |
| L2 | SAI GEOTECHNICAL LAB (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Preparation of CPR DPR for Services,Sewage disposal,Storm Water Drainage System,Road Path Culve,All | |
| L3 | INERTIA ENGINEERING SOLUTIONS (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Preparation of CPR DPR for Services,Sewage disposal,Storm Water Drainage System,Road Path Culve,All | |
| L4 | B.J. MEHTA ARCHITECTURAL & STRUCTURAL CONSULTANTS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Preparation of CPR DPR for Services,Sewage disposal,Storm Water Drainage System,Road Path Culve,All |
Quantity
256
Category
Preparation of CPR DPR for Services
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Past Performance
30 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Preparation of CPR DPR for Services , Sewage disposal , Storm Water Drainage System , Road Path Culve , All drawings and calculations
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
3
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
MUMBAI
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | MUMBAI | MUMBAI | - | - | 252 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Preparation of CPR DPR for Services
Preparation of CPR DPR for Services Preparation and submission of Concept Project Report CPR and Detailed Project Report DPR
Sewage disposal
Sewage disposal Preparation and submission of detailed design calculations and drawings for the sewage
Storm Water Drainage System
Storm Water Drainage System Preparation and submission of detailed design and drawings for Storm Wate
Road Path Culve
Road PathCulvert Preparation and submission of detailed design, BOQ and drawings for Road Path and Culvert including geometric design
All drawings and calculations
All drawings and calculations shall be submitted to the GE Office for review and approval The work shall also include vetting of all design documents
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Preparation of CPR DPR for Services | Preparation of CPR DPR for Services Preparation and submission of Concept Project Report CPR and Detailed Project Report DPR | 252 | acre | agebhandup | 45 | |
| 2 | Sewage disposal | Sewage disposal Preparation and submission of detailed design calculations and drawings for the sewage | 1 | lump sump | agebhandup | 45 | |
| 3 | Storm Water Drainage System | Storm Water Drainage System Preparation and submission of detailed design and drawings for Storm Wate | 1 | lump sump | agebhandup | 45 | |
| 4 | Road Path Culve | Road PathCulvert Preparation and submission of detailed design, BOQ and drawings for Road Path and Culvert including geometric design | 1 | lump sump | agebhandup | 45 | |
| 5 | All drawings and calculations | All drawings and calculations shall be submitted to the GE Office for review and approval The work shall also include vetting of all design documents | 1 | lump sump | agebhandup | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer