TenderDekho Logo
Closed GEM

Ex-servicemen Contributory Health Scheme AC Installation Tender Lucknow Uttar Pradesh 2026

Bid Publish Date

25-Sep-2026, 3:25 pm

Bid End Date

05-Oct-2026, 5:00 pm

Progress

Issue25-Sep-2026, 3:25 pm
Technical10-Apr-2026, 2:57 pm
Financial
AwardCompleted

Tender Overview

The Ex-servicemen Contributory Health Scheme (ECHS), Department of Ex-servicemen Welfare, invites bidding for comprehensive AC installation and allied works in Lucknow, Uttar Pradesh. The scope includes 34 itemized tasks ranging from AC installation and wiring to carpentry, aluminum fittings, glass, door seals, and related labour. The tender emphasizes sample submission prior to technical bid opening, and reserves quantity variation up to 25% during and after contract, at contracted rates. The procurement targets organized service delivery for HVAC-related refurbishments or new installations, with emphasis on coordination across multiple trades.

Technical Specifications & Requirements

  • Product/service scope includes: AC installation, disassembly, wiring with MCB, surge boards, electrician charges, aluminum window/fixing, ACP sheet works, wooden ply with mica, TV stand, glass reflective film, door closers, mosquito net fixes, door seals, carpenter services, door removal and replacement, Lloyd/Voltas/A/C repair services, extra piping, drainage, standby stand, PCB changes, gas refills, online service sections, and main line wiring.
  • No explicit numeric technical specs or standards are published in the tender text; the requirement focuses on broad HVAC installation and internal fit-out tasks, with responsibilities for related labour and material handling.
  • ATC requires sample submission before opening of technical bid; option clause permits 25% quantity variation and extended delivery timelines with arithmetic-based calculation.
  • The tender references multiple supplier activities across carpentry, metalwork, glass, and electrical works in a unified HVAC refurbishment/installation package.

Terms & Eligibility

  • EMD and estimated values are not disclosed in the published data.
  • Bid submissions require PAN card, GSTIN, cancelled cheque, and EFT mandaat certified by bank for vendor code creation.
  • Buyer's option clause allows contract quantity fluctuation up to 25%, with delivery time adjustments based on the extended delivery period and original quantities; minimum extension logic applies.
  • The terms specify that participants must comply with the provided ATC and submit required samples before bid opening; no explicit warranty or payment terms are described in the available data.

Key Specifications

  • Product/service names: AC installation, disassembly, wiring with MCB, surge board, Labour for electricals, aluminum window/ACP sheet works, wooden ply with mica, door closers, window nets, door seals, carpenter works, new doors, air conditioner stand, gas refilling, PCB repair, service sections, and main line wiring.

  • Quantities/values: Not disclosed; 34 total items; no explicit emission/EMD values stated.

  • Standards/certifications: Not specified in provided text; references to brands Lloyd and Voltas for installation/repair

  • Delivery/installation: Flexible by option clause; delivery period adjustments based on (quantity increase/original quantity) × original delivery period with a minimum 30 days

  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; sample submission; vendor code prerequisites

Terms & Conditions

  • Option clause allowing up to 25% quantity variation at contracted rates

  • Sample submission required before technical bid opening

  • Vendor code documents: PAN, GSTIN, cancelled cheque, EFT mandate

Important Clauses

Payment Terms

Not specified in data; ensure to review ATC for any interim/advance terms

Delivery Schedule

Delivery period starts from last date of original delivery order; additional time calculated as (Increase in quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; verify in final ATC and contract

Bidder Eligibility

  • Must provide PAN and GSTIN; valid GST registration

  • Must submit EFT Mandate certified by bank

  • Must comply with sample submission requirement prior to technical bid opening

Advertisement

Authority & Contact

Organization

Ex-servicemen Contributory Health Scheme (echs)

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
CREATIVE SOLUTIONS   Under PMA
-04-10-2026 20:27:29
2
DELIGHT ENTERPRISES   Under PMA
-05-10-2026 15:28:59
3
SHUBHAM ENTERPRISES   Under PMA
-05-10-2026 12:52:42
4
VS SOLANKI ENTERPRISES   Under PMA
-04-10-2026 22:23:12

Financial Results

Rank Seller Price Item
L1
CREATIVE SOLUTIONS( MSE Social Category:General )    Under PMA
Item Categories : AC Installation,AC Dismental,ac Wall Stand,Wire Lead,Elect Connection for A C With MCB,Surteh Board
L2
DELIGHT ENTERPRISES( MSE Social Category:OBC )    Under PMA
Item Categories : AC Installation,AC Dismental,ac Wall Stand,Wire Lead,Elect Connection for A C With MCB,Surteh Board
L3
SHUBHAM ENTERPRISES( MSE Social Category:General )    Under PMA
Item Categories : AC Installation,AC Dismental,ac Wall Stand,Wire Lead,Elect Connection for A C With MCB,Surteh Board

Tender Data

Bid Details

Quantity

62

Category

AC Installation

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AC Installation , AC Dismental , ac Wall Stand , Wire Lead , Elect Connection for A C With MCB , Surteh Board With Wire and connection , Electricean Charges , Aluminium Window Sliding size 4 3 , Fixing Of Aluminum Panel with material and window closing fixing , Changes of ACP Sheet size 4 3 , Wooden ply with mica fixing size 4 3 , TV stand , Glass Reflective film size 4 4 , Door Colosure , Aluminium Window fixing of mosquito net , Door seal with fixing , carpenter charges , Removing Of Erit Door With Wall Certting Including Material And Labour charges , New Doar , LLoyd Air Conditior 2 ton 3 star installation charges with extra pipe drain pipe A.C stand Lead Wire , Voltas 2 ton A.c repair with refilling of and service charges , A.C REPAIR CHARGES , A.C STAND SPLIT A.C , A.C WIRING CHARGES WITH WIRE , EXTRA CAPPER PIPE , Shifting of wooden Cabinet with material and Labour charges , A.c Repair with PCB change repair and service Diseotor ECHS , gas refilling , Service , water peping for AC water , Repair of AC , AC Service online Section , gas refilling online Section , AC wiring with Main line Including wire and labour charges Armod cable wire

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-LucknowLucknow--315-

Authority Records

MINISTRY OF DEFENCEEX-SERVICEMEN WELFARE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9941984.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 34 Items Sign in for GEM prices

#1

AC Installation

AC Installation

3 job Delivery: 15 days
#2

AC Dismental

AC Dismental

3 job Delivery: 15 days
#3

ac Wall Stand

ac Wall Stand

1 nos Delivery: 15 days
#4

Wire Lead

Wire Lead

4 mtr Delivery: 15 days
#5

Elect Connection for A C With MCB

Elect Connection for A C With MCB

1 job Delivery: 15 days
#6

Surteh Board With Wire and connection

Surteh Board With Wire and connection

1 nos Delivery: 15 days
#7

Electricean Charges

Electricean Charges

1 job Delivery: 15 days
#8

Aluminium Window Sliding size 4 3

Aluminium Window Sliding size 4 3

2 nos Delivery: 15 days
#9

Fixing Of Aluminum Panel with material and window closing fixing

Fixing Of Aluminum Panel with material and window closing fixing

2 job Delivery: 15 days
#10

Changes of ACP Sheet size 4 3

Changes of ACP Sheet size 4 3

1 job Delivery: 15 days
#11

Wooden ply with mica fixing size 4 3

Wooden ply with mica fixing size 4 3

5 job Delivery: 15 days
#12

TV stand

TV stand

2 nos Delivery: 15 days
#13

Glass Reflective film size 4 4

Glass Reflective film size 4 4

8 unit Delivery: 15 days
#14

Door Colosure

Door Colosure

5 nos Delivery: 15 days
#15

Aluminium Window fixing of mosquito net

Aluminium Window fixing of mosquito net

2 job Delivery: 15 days
#16

Door seal with fixing

Door seal with fixing

2 nos Delivery: 15 days
#17

carpenter charges

carpenter charges

2 job Delivery: 15 days
#18

Removing Of Erit Door With Wall Certting Including Material And Labour charges

Removing Of Erit Door With Wall Certting Including Material And Labour charges

1 job Delivery: 15 days
#19

New Doar

New Doar

1 nos Delivery: 15 days
#230

LLoyd Air Conditior 2 ton 3 star installation charges with extra pipe drain pipe A.C stand Lead Wire

LLoyd Air Conditior 2 ton 3 star installation charges with extra pipe drain pipe A.C stand Lead Wire

1 job Delivery: 15 days
#21

Voltas 2 ton A.c repair with refilling of and service charges

Voltas 2 ton A.c repair with refilling of and service charges

1 job Delivery: 15 days
#22

A.C REPAIR CHARGES

A.C REPAIR CHARGES

1 job Delivery: 15 days
#23

A.C STAND SPLIT A.C

A.C STAND SPLIT A.C

1 job Delivery: 15 days
#24

A.C WIRING CHARGES WITH WIRE

A.C WIRING CHARGES WITH WIRE

1 job Delivery: 15 days
#25

EXTRA CAPPER PIPE

EXTRA CAPPER PIPE

1 job Delivery: 15 days
#26

Shifting of wooden Cabinet with material and Labour charges

Shifting of wooden Cabinet with material and Labour charges

1 set Delivery: 15 days
#27

A.c Repair with PCB change repair and service Diseotor ECHS

A.c Repair with PCB change repair and service Diseotor ECHS

1 job Delivery: 15 days
#28

gas refilling

gas refilling

1 job Delivery: 15 days
#29

Service

Service

1 job Delivery: 15 days
#30

water peping for AC water

water peping for AC water

1 set Delivery: 15 days
#31

Repair of AC

Repair of AC

1 job Delivery: 15 days
#32

AC Service online Section

AC Service online Section

1 job Delivery: 15 days
#33

gas refilling online Section

gas refilling online Section

1 job Delivery: 15 days
#34

AC wiring with Main line Including wire and labour charges Armod cable wire

AC wiring with Main line Including wire and labour charges Armod cable wire

1 job Delivery: 15 days

Categories 16

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate copy certified by bank

5

Sample submission before technical bid opening

6

Any OEM authorizations if applicable

7

Technical bid documents as per ATC

8

Experience certificates and financial statements (if requested elsewhere)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for AC installation tender in Lucknow with ECHS?

Bidders must submit PAN, GSTIN, cancelled cheque, and bank EFT mandate with bid. Sample must be provided before technical bid opening. The tender allows up to 25% quantity variation at contracted rates and requires adherence to ATC provisions and delivery extensions based on quantity changes.

What documents are required for ECHS HVAC tender in Lucknow?

Submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and sample for technical evaluation. Include OEM authorizations if applicable and any existing experience certificates. Ensure technical bid contains all mandatory documents as per Buyer Added ATC terms.

What are the delivery terms for ECHS AC installation tender Lucknow?

Delivery starts from the last date of the original delivery order. If quantity increases, delivery time = (increase ÷ original quantity) × original period, with a minimum extension of 30 days. The purchaser may extend further within the original delivery window.

Which services are covered under the Lucknow HVAC BOQ?

The scope includes AC installation, disassembly, main line wiring, MCB wiring, surge boards, electrical labour, aluminum window fixing, ACP sheet work, wooden ply with mica, door seals, carpenter work, and gas refilling/PCB repair among related tasks.

Are there brand requirements or certifications for this Lucknow tender?

Brand mentions include Lloyd and Voltas for installation/repair tasks; no explicit ISO/ISI standards specified in the data. Confirm final ATC for any mandatory certifications or OEM authorizations required.

What is the sample submission requirement before bid opening in Lucknow?

All participants must submit their sample prior to technical bid opening. This requirement is highlighted in the Buyer Added ATC and is essential for eligibility to participate in the bidding process.

What is the scope of 25% quantity variation in this ECHS tender?

The purchaser may increase or decrease order quantity by up to 25% at contracted rates during contract placement and currency. Delivery timelines adjust proportionally based on the formula provided, with a minimum 30-day extension.

What documents are needed for bidder code creation in this Lucknow tender?

Provide PAN, GSTIN, cancelled cheque, and EFT Mandate certified by bank. These are mandatory for vendor code creation to participate in the bidding process and to ensure payment processing once contracted.

Advertisement