TenderDekho Logo
GEM

Northern Coalfields Limited Bi Double Distillation Water Unit (V2) Tender Sonbhadra UP 2025

Bid Publish Date

29-Oct-2025, 5:33 pm

Bid End Date

08-Nov-2025, 6:00 pm

Value

₹12,212

Progress

Issue29-Oct-2025, 5:33 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 7

Tender Overview

The tender is issued by Northern Coalfields Limited (Coal India Limited) for the Bi Double Distillation Water Unit (V2) (Q3) as a supply-only contract. Located in Sonbhadra, Uttar Pradesh 231205, the estimated value is ₹12,211.82 with unspecified EMD. The contract contemplates a scalable quantity under an option clause up to 25% additional quantity at contracted rates, and a delivery timeline tied to the original delivery period with adjustments for extensions. The procurement emphasizes proven-ness, requiring bidders to demonstrate prior execution of similar items with satisfactory performance or furnish a self-certification. A 12-month warranty is specified, covering defects due to faulty materials or workmanship, with free replacement of defective components and, if needed, complete assemblies. The scope is limited to supply of goods; installation or commissioning is not explicitly stated. The ATC clauses underscore adherence to candor in certificates and documentation. This tender presents a focused opportunity for bidders with a proven track record in water purification or distillation units and the capacity to meet the 12-month warranty requirement. Unique aspects include the option-based quantity adjustment, and the explicit warranty and proven-ness criteria that tie past performance to eligibility. The tender reflects government procurement rigor at a regional coal-mining entity and aligns with the organization’s equipment-supply objectives. Keywords and competitive dynamics should emphasize ISI-like or equivalent quality assurances, and proven supply experience in similar government or PSU orders.

Technical Specifications & Requirements

  • Product/service name: Bi Double Distillation Water Unit (V2) (Q3) (supply of goods only)
  • Scope: Bid price to include all cost components; installation not specified
  • Quantity/Value: Estimated value ₹12,211.82; option to increase quantity up to 25% during contract
  • Delivery/Timeline: Delivery period linked to original order; extended-time formula provided, minimum 30 days; additional time may be required based on extended quantity
  • Experience/Proof: Proven-ness criteria for offered make items; last 5 years performance on similar items with satisfactory results; self-certification allowed if no prior satisfactory performance
  • Warranty/Support: 12 months warranty from receipt/acceptance; defect remedy at supplier cost; free replacement of defective subassemblies or entire item if required
  • Standards/Compliance: No explicit standards listed; emphasis on certificates and ATC-compliant documentation
  • Certificates/ATC: Upload required certificates; ATC documents attached as viewable files; adherence to bid document requirements is mandatory
  • Location/Destination: Tender procurement aligned with Northern Coalfields Limited requirements within UP region; delivery to specified site as per contract terms

Terms, Conditions & Eligibility

  • EMD/Security: Not explicitly stated; bidders should verify required security deposits per ATC
  • Delivery: Delivery period as per original delivery order; extended duration calculated by formula; minimum 30 days
  • Payment: Not detailed in provided data; verify in ATC terms; typical PSU terms may apply
  • Experience: Proven-ness criteria require performance on similar items within last 5 years; self-certification allowed with execution proof
  • Warranty: 12 months warranty on materials and workmanship; free replacement of defective components or complete assemblies
  • Documents: Upload all required certificates; ensure OEM authorization if applicable; ensure compliance with ATC/ Corrigendum
  • Quantity Flexibility: Purchaser may increase/decrease quantity by up to 25% during contract and currency
  • Penalties: Not specified; verify LD or penalties in ATC terms

Key Specifications

  • Product: Bi Double Distillation Water Unit (V2) for Q3 category

  • Scope: Supply of goods only; no installation indicated

  • Quantity/Value: Estimated ₹12,211.82; option to increase up to 25%

  • Warranty: 12 months from receipt/acceptance; defect remedy at supplier cost

  • Proven-ness: Last 5 years performance in similar items; self-certification allowed if required proof

  • Documentation: Upload all required certificates; ATC attached with tender

Terms & Conditions

  • Quantity may be increased/decreased by up to 25% during contract

  • 12-month warranty with free replacement of defective parts

  • Proven-ness criteria requiring prior similar-scope supply within 5 years

Important Clauses

Payment Terms

Not detailed in data; verify in ATC/Corrigendum; standard PSU practice may apply

Delivery Schedule

Delivery period to commence from last date of original delivery order; extended time formula provided; minimum 30 days if needed

Penalties/Liquidated Damages

Not specified; verify in ATC terms; implied procurement penalties may apply for non-performance

Bidder Eligibility

  • Demonstrated experience in supplying similar water distillation equipment within last 5 years

  • Ability to meet 12-month warranty and post-delivery defect remediation

  • Compliance with required certificates and OEM/Proven-ness documentation

Documents 3

GeM-Bidding-8412681.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Bi Double Distillation Water Unit (V2)

Indian Council Of Agricultural Research (icar)

Posted: 28 July 2025
Closed: 2 August 2025
GEM

Bi Double Distillation Water Unit (V2)

Kannur University

KANNUR, KERALA

Posted: 18 July 2025
Closed: 7 August 2025
GEM

Bi Double Distillation Water Unit (V2)

N/a

BASTAR, CHHATTISGARH

Posted: 31 July 2025
Closed: 21 August 2025
GEM

Bi Double Distillation Water Unit (V2)

N/a

KOPPAL, KARNATAKA

Posted: 5 February 2025
Closed: 15 February 2025
GEM

Bi Double Distillation Water Unit (V2)

Directorate Of Collegiate Education

THIRUVANANTHAPURAM, KERALA

Posted: 22 September 2025
Closed: 3 October 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates for similar water distillation equipment supply

4

Financial statements or turnover evidence (as per eligibility)

5

EMD/Security deposit documents (as specified in ATC)

6

Technical bid documents showing compliance with requested scope

7

OEM authorizations or Proven-ness documentation

8

Certificates/ATC documents uploaded as proof of compliance

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the water distillation tender in Sonbhadra UP 2025

To bid, ensure you meet proven-ness criteria for similar distillation units within the last five years, upload all required certificates, provide OEM/authorized documentation, and confirm a 12 months warranty. The bid includes option-based quantity adjustments up to 25% and a delivery timeline aligned to the original order with minimum extension rules.

What documents are needed for the Northern Coalfields water unit tender

Submit GST certificate, PAN, experience certificates for similar equipment, financial statements, EMD/security deposit documents, technical bid, OEM authorizations, and ATC certificates. Ensure all certificates are uploaded with the bid and are compliant with the ATC terms and Corrigendum if issued.

What are the delivery terms and extension rules for this tender

Delivery starts from the last date of the original delivery order. If quantity increases, the extended time = (increased quantity / original quantity) × original delivery period, with a minimum of 30 days. The purchaser may extend to the original delivery period during option usage.

What warranty is provided for the Bi Double Distillation Water Unit

The warranty is 12 months from receipt and acceptance. The supplier must remedy defects due to faulty materials or workmanship at no cost, with free replacement of defective sub-assemblies or whole assemblies if required, ensuring continued operation of the water distillation unit.

What is the scope of supply for this water unit tender

Scope is supply of goods only; installation and commissioning are not specified in the available data. Bidders should verify scope with ATC and Corrigendum to confirm any site-acceptance requirements.

How is the quantity adjustment handled during contract

The Purchaser may adjust the quantity by up to 25% at the time of contract placement and during the currency of the contract at contracted rates. This requires bidders to maintain readiness for partial or full-scale delivery within the extended delivery framework.

What performance proof is required for the offered units

Bidders must provide proof of performance for similar items in the last five years, with satisfactory results from CIL subsidiaries, other PSUs, government departments, or equivalent organizations. If unavailable, a self-certification format with execution/payment proof is required.

Are there any special certificates required for the distillation unit

Yes, the bidder must upload all requested certificates per the ATC and tender documents. Certificates may include OEM authorizations and any quality certifications that demonstrate compliance with the bid's documentation requirements.

Similar Tenders

2 found
Urgent

Drip Irrigation Unit (V2)

N/a

📍 BHOPAL, MADHYA PRADESH

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Drip Irrigation Unit (V2)

Board Of Secondary Education

📍 MORENA, MADHYA PRADESH

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM