NIPER Rae Bareli Electroporator Tender Lucknow Uttar Pradesh 2025 - Electroporator Supply Procurement
National Institute Of Pharmaceutical Education And Research (niper) Rae Bareli
LUCKNOW, UTTAR PRADESH
Bid Publish Date
30-Jun-2026, 5:19 pm
Bid End Date
15-Jul-2026, 6:00 pm
EMD
₹30,000
Value
₹15,00,000
Location
Progress
Quantity
2333
Category
Evaporator and Clarification House Item no 1
Bid Type
Two Packet Bid
A tender has been published for N/a Evaporator and Clarification House Item no 1, Evaporator and Clarification House Item no 2, Evaporato in SAHARANPUR, UTTAR PRADESH. Quantity: 2333 by. Submission Deadline: 15-07-2026 18: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
National Institute Of Pharmaceutical Education And Research (niper) Rae Bareli
LUCKNOW, UTTAR PRADESH
N/A
HARIDWAR, UTTARAKHAND
N/A
VELLORE, TAMIL NADU
Institute Of Nano Science And Technology
N/A
CHANDIGARH, CHANDIGARH
Tender Results
Loading results...
Evaporator and Clarification House Item no 1
Dismantling cleaning repairing and refitting work of catcher internal elements of new Semikestner (2300 m2) with leak proof trial
Evaporator and Clarification House Item no 2
Dismantling fabrication and erection work of Evaporator body or Semikestner or vapour shell complete with save all of uttam quad set
Evaporator and Clarification House Item no 3
Major repair of save all of the evaporator body or Semikestner or vapour shell along with leak proof water and vacuum trail
Evaporator and Clarification House Item no 4
Dismantling fabrication and erection of weak or worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover leak proof water and vacuum trial
Evaporator and Clarification House Item no 5
Dismantling fabrication and erection work of the sulphur furnace melter along with hydraulic tested steam coil with all connections and satisfactory trial
Evaporator and Clarification House Item no 6
Dismantling fabrication and erection work of the sulphur furnace melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial
Evaporator and Clarification House Item no 7
Dismantling Fabrication and erection of sulphur furnace secondary cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial
Evaporator and Clarification House Item no 8
Repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its existing connection
Evaporator and Clarification House Item no 9
Dismantling fabrication and erection of Juice receiving bottle fitted at vacuum filter station by providing all its existing connection
Evaporator and Clarification House Item no 10
Dismantling fabrication and erection of weak or leak condenser at vacuum filter
Evaporator and Clarification House Item no 11
Dismantling fabrication and erection of Muddy juice receiving tank complete with all connection and associated pipe lines along with leak proof trial
Evaporator and Clarification House Item no 12
Dismantling fabrication and erection of mud tray of vacuum filter 10feet x 20feet vacuum filter along with satisfactory trial
Evaporator and Clarification House Item no 13
Dismantling fabrication and erection weak mud agitator of 10feet x 20feet vacuum filter along with satisfactory trial
Evaporator and Clarification House Item no 14
Dismantling fabrication and erection of mud tray of vacuum filter 14feet x 28feet vacuum filter along with satisfactory trial
Evaporator and Clarification House Item no 15
Dismantling fabrication and erection weak mud agitator of 14feet x 28feet vacuum filter along with satisfactory trial
Evaporator and Clarification House Item no 16
Dismantling fabrication and erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial
Evaporator and Clarification House Item no 17
Dismantling fabrication and erection of weak or worn out portion of clear juice Liquidation box along with leak proof trial
Evaporator and Clarification House Item no 18
Dismantling fabrication and erection of weak or worn out clarifier mud boot along with leak proof trial
Evaporator and Clarification House Item no 19
Dismantling Fabrication and Erection weak shell of compartment no 1 and 2 of Juice clarifier (Big) Work of New DORR Diameter 28feet Capacity 3750 HL Body shell including completion of all connections and leak proof trial
Evaporator and Clarification House Item no 20
Dismantling Fabrication and Erection weak shell of compartment no 1 of Juice clarifier (Small) Work of New DORR Diameter 24feet Capacity 2550 HL Body shell including completion of all connections and leak proof trial
Evaporator and Clarification House Item no 21
Dismantling Fabrication and Erection of weak shell of juice sulphiter 320 HL including completion of all connection and leak proof trial
Evaporator and Clarification House Item no 22
Dismantling fabrication and erection of Juice catcher for Raw or vacuum orsugar melter orsulphited Juice pumps with suction or delivery connection
Evaporator and Clarification House Item no 23
Repairing of Juice Heater Condensate Bottle or Evaporator or Syrup receiving Bottle with leak proof testing partition plate with all connection
Evaporator and Clarification House Item no 24
Repairing of SO2 furnace sublimation pipe with its leaking Tower etc with testing
Evaporator and Clarification House Item no 25
Dismantling fabrication and erection of vacuum filter mud mixer body and fitting of screw conveyor with proper alignment and satisfactory trial
Evaporator and Clarification House Item no 26
Fabrication and erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial
Evaporator and Clarification House Item no 27
Dismantling fabrication and fitting of new down take of quad or Old or New semikestner etc
Evaporator and Clarification House Item no 28
Dismantling fabrication and erection of weak or leaky recovery tower of juice sulphiter or Syrup Sulphiter
Evaporator and Clarification House Item no 29
Repairing of Umbrella and Providing essential supports of Quad
Evaporator and Clarification House Item no 30
Dismantling fabrication and erection of worn out Umbrella of Quad with Old or New Plates
Evaporator and Clarification House Item no 31
Dismantling fabrication and erection of saveall of Quad old bodies
Evaporator and Clarification House Item no 32
Replacement of worn-out top conical portion of Quad and Vapour Shell with save all proper strengthening with associated machinery
Evaporator and Clarification House Item no 33
Dismantling of worn out arms and shell (outside and inside) of juice sulphiter drum fabrication and erection with satisfactory trial
Evaporator and Clarification House Item no 34
To replace worn out clear juice box or mud discharge box with valve of new dorr followed by satisfactory trial
Evaporator and Clarification House Item no 35
Replacement of worn out mud scrapper plate and fitting of mud scrapper at Vacuum Filter
Evaporator and Clarification House Item no 36
Major repair of lime slaker with proper alignment and trial
Evaporator and Clarification House Item no 37
To replace worn out sulphur furnace header of size 8 inch or 10 inch between after burner and Cooler
Evaporator and Clarification House Item no 38
Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc
Evaporator and Clarification House Item no 39
Replacement of partition plate of old dorr Compartment or Intermediameterte tray with 5 or 6mm MS plate
Evaporator and Clarification House Item no 40
Dismantling of existing 700 Sqm H S Area of Quad body first (Uttam Set Calandria ) Providing the Support for Stay the Shell above Calandria Unloading of New Calandria from Vehicle by their resources shifting of new Calandria at the site Fitting and Erection of Calandria at the Place of Old Calandria with Shell fitting of bottom cone of Calandria inlet Vapour or Exhaust steam Connection water line connection and making all other connection to run the body complete in all respect
Pan house item no 1
Repairing of down-take of Pan for 40 or 50 Ton Pan
Pan house item no 2
Repairing of down-take of Pan for 60 or 80 Ton Pan
Pan house item no 3
Dismantling of Gutter of Molasses Magma and massecuite
Pan house item no 4
Fabrication and fitting of Gutter of Molasses Magma and massecuite
Pan house item no 5
Repairing of hinge type cover of Gutter
Pan house item no 6
Replacement of worn-out condensate box of pans quad and juice heaters
Pan house item no 7
Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 40 or 50 Ton pan
Pan house item no 8
Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 60 or 80 Ton pan
Pan house item no 9
Repairing of umbrella of Pans with supports and J pipes 40 or 50 Ton pan
Pan house item no 10
Repairing of umbrella of Pans with supports and J pipes 60 or 80 Ton pan
Pan house item no 11
Replacement of worn out distributor by new for 40 or 50 Ton Pan
Pan house item no 12
Replacement of worn out distributor by new for 60 or 80 Ton Pan
Pan house item no 13
Replacement of weak sight glass flanges of Pan and Evaporater Body along with leak proof water and vaccuum trial
Pan house item no 14
Replacement of complete worn-out or weak top cone of 40 or 50 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial
Pan house item no 15
Replacement of complete worn-out or weak top cone of 60 or 80 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial
Pan house item no 16
Strengthening of 40 or 60 Ton Pan body and Taper Portion with channel etc
Pan house item no 17
Dismantling Fabrication and Erection of Box type feed header for each Pan with all related connections including valves nipples flanges etc
Pan house item no 18
Dismantling Fabrication and Erection of weak portion of pan shell with 12mm MS plate along with leak proof water and vacuum trial Welding must be double coated from outside and inside
Pan house item no 19
Replacement of weak orworn out side and bottom plate of cold or hot water over head tank syrup tank and Molasses storage tanks at pan station by providing proper strengthening
Pan house item no 20
Fabrication and erection of complete new down take of 40 or 50 ton pan along with leak proof water and vacuum trial
Pan house item no 21
Fabrication and erection of complete new down take of 60 or 80 ton pan along with leak proof water and vacuum trial
Pan house item no 22
Repairing of weak orworn out save-all of 40 or 50 Ton pan along with leak proof water and vacuum trial
Pan house item no 23
Dismantling fabrication and erection of pan save all with proper trial 40 or 50 Ton along with leak proof water and vacuum trial
Pan house item no 24
Dismantling fabrication and erection of 60 or 80 Ton pan save all along with leak proof water and vacuum trial
Pan house item no 25
Repairing of weak save-all of 60 or 80 Ton pan along with leak proof water and vacuum trial
Pan house item no 26
Dismantling Fabrication and Erection of Worn out Portion of the Chute for Pan Discharge Valve with Satisfactory trial
Pan house item no 27
Repairing or patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor
Pan house item no 28
Dismantling fabrication and fitting work of 80Ton Pan save all internals
Pan house item no 29
Disamantling,Reapiring and Re-fitting with leak proof trial of Collapsed SS Venturi of Pan no 10 Condensor
Injection item no 1
Replacement of weak/leaky suction and delivery pipe of MF- 50X50/ 40X40 injection and spray pump as per old sample Making and fitting of stone catcher Fitting of Pipe with Pump
Injection item no 2
Dismantling ,Fabrication and Erection of weak/wornout delivery Pipe of injection pump having one end reducer
Injection item no 3
Disamantling,fabrication and fitting work of injection header Suction Pipe Mesh type Stainer
Schedule work item no 1
Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 1 inch diameter
Schedule work item no 2
Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 2 inch diameter
Schedule work item no 3
Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 3 inch diameter
Schedule work item no 4
Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 4 inch diameter
Schedule work item no 5
Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 5 inch diameter
Schedule work item no 6
Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 6 inch diameter
Schedule work item no 7
Dismantling fabrication and Erection of Bend Size-2 inch diameter (MS)
Schedule work item no 8
Dismantling fabrication and Erection of Bend Size- 3 inch diameter (MS)
Schedule work item no 9
Dismantling fabrication and Erection of Bend Size- 4 inch diameter (MS)
Schedule work item no 10
Dismantling fabrication and Erection of Bend Size- 5 inch diameter (MS)
Schedule work item no 11
Dismantling fabrication and Erection of Bend Size- 6 inch diameter (MS)
Schedule work item no 12
Dismantling fabrication and Erection of Bend Size- 8 inch diameter (MS)
Schedule work item no 13
Dismantling fabrication and Erection of Bend Size-10 inch diameter (MS)
Schedule work item no 14
Dismantling fabrication and Erection of Bend Size-12 inch diameter (MS)
Schedule work item no 15
Dismantling fabrication and Erection of Nipple Size- 1inch diameter (MS)
Schedule work item no 16
Dismantling fabrication and Erection of Nipple Size- 2 inch diameter (MS)
Schedule work item no 17
Dismantling fabrication and Erection of Nipple Size- 3 inch diameter (MS)
Schedule work item no 18
Dismantling fabrication and Erection of Nipple Size- 4 inch diameter (MS)
Schedule work item no 19
Dismantling fabrication and Erection of Nipple Size- 5 inch diameter (MS)
Schedule work item no 20
Dismantling fabrication and Erection of Nipple Size- 6 inch diameter (MS)
Schedule work item no 21
Dismantling fabrication and Erection of Nipple Size- 8 inch diameter (MS)
Schedule work item no 22
Dismantling fabrication and Erection of Nipple Size- 10 inch diameter (MS)
Schedule work item no 23
Dismantling fabrication and Erection of Nipple Size- 12 inch diameter (MS)
Schedule work item no 24
Dismantling fabrication and Erection of Cross Size- 6 inch diameter (MS)
Schedule work item no 25
Dismantling fabrication and Erection of Cross Size- 8 inch diameter (MS)
Schedule work item no 26
Dismantling fabrication and Erection of Cross Size- 10 inch diameter (MS)
Schedule work item no 27
Dismantling fabrication and Erection of Tee Size- 4 inch diameter (MS)
Schedule work item no 28
Dismantling fabrication and Erection of Tee Size- 5 inch diameter (MS)
Schedule work item no 29
Dismantling fabrication and Erection of Tee Size- 6 inch diameter (MS)
Schedule work item no 30
Dismantling fabrication and Erection of Tee Size- 8 inch diameter (MS)
Schedule work item no 31
Dismantling fabrication and Erection of Tee Size- 10 inch diameter (MS)
Schedule work item no 32
Dismantling fabrication and Erection of Tee Size- 12 inch diameter (MS)
Schedule work item no 33
Dismantling fabrication and Erection of Flange Size- 4 inch diameter (MS)
Schedule work item no 34
Dismantling fabrication and Erection of Flange Size- 5 inch diameter (MS)
Schedule work item no 35
Dismantling fabrication and Erection of Flange Size- 6 inch diameter (MS)
Schedule work item no 36
Dismantling fabrication and Erection of Flange Size- 8 inch diameter (MS)
Schedule work item no 37
Dismantling fabrication and Erection of Flange Size- 10 inch diameter (MS)
Schedule work item no 38
Dismantling fabrication and Erection of Flange Size- 12 inch diameter (MS)
Schedule work item no 39
Dismantling fabrication and Erection of Reducer Size-4 inch diameter (MS)
Schedule work item no 40
Dismantling fabrication and Erection of Reducer Size-5 inch diameter (MS)
Schedule work item no 41
Dismantling fabrication and Erection of Reducer Size-6 inch diameter (MS)
Schedule work item no 42
Dismantling fabrication and Erection of Reducer Size-8 inch diameter (MS)
Schedule work item no 43
Dismantling fabrication and Erection of Reducer Size-10 inch diameter (MS)
Schedule work item no 44
Dismantling fabrication and Erection of Reducer Size-12 inch diameter (MS)
Schedule work item no 45
Dismantling and fitting of valve Size- 3 inch diameter
Schedule work item no 46
Dismantling and fitting of valve Size- 4 inch diameter
Schedule work item no 47
Dismantling and fitting of valve Size- 5 inch diameter
Schedule work item no 48
Dismantling and fitting of valve Size- 6 inch diameter
Schedule work item no 49
Dismantling and fitting of valve Size- 8 inch diameter
Schedule work item no 50
Dismantling and fitting of valve Size- 10 inch diameter
Schedule work item no 51
Dismantling and fitting of valve Size- 12 inch diameter
Schedule work item no 52
Dismantling Fabrication and fitting of man hole
Schedule work item no 53
Dismantling Fabrication and erection of platform by using old/new plate
Schedule work item no 54
Fabrication and erection of railing from old Material
Schedule work item no 55
Fabrication and erection of T ring for strengthening of evaporator /Pan vapour Pipe
Schedule work item no 56
Dismantling of MS heavy structure / Tank
Schedule work item no 57
Dismantling of MS Light structure
Schedule work item no 58
Fabrication and Erection Light structure
Schedule work item no 59
Fabrication and Erection heavy structure
Schedule work item no 60
Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 7 5 H P
Schedule work item no 61
Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 10 H P
Schedule work item no 62
Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 25 H P
Schedule work item no 63
Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 30 H P
Schedule work item no 64
Dismantling and cleaning of MS Pipe Line with bend, flange , nipple etc
Schedule work item no 65
Fitting of MS pipe line with bend, flange ,nipple etc after cleaning
Schedule work item no 66
Fabrication and Erection of complete Square / Rectangular /Round Tank with conical Bottom
Schedule work item no 67
Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-25mm
Schedule work item no 68
Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-50mm
Schedule work item no 69
Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-75mm
Schedule work item no 70
Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-100mm
Schedule work item no 71
Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-125mm
Schedule work item no 72
Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-150mm
Schedule work item no 73
Dismantling, Fabrication and fitting of new Cone and umbrella any where in the factory Cone above 01 Mtr Dia upto 25mtr dia
Schedule work item no 74
Dismantling , Fabrication and fitting of new Cone and umbrella any where in the factory, Cone above 25 Mtr Dia
Schedule work item no 75
Fabrication and Patchwork of equipments using old/ New MS plate by 6/8 mm thick plate over round vessels/any vessels
Schedule work item no 76
Disamntling Fabrication and Erection of Weak Vapor/Exhaust steam Pipe line and bend Dia from 500mm to 900mm complete in all respect with leak proof trial
Schedule work item no 77
Disamntling Fabrication and Erection of intermediate Vapor pipe/Vapor pipe and bends of Quad bodies and Vapor pipe and bends of PAN dia from 900 mm to 1300 mm complete in all respect with leak proof trial
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Evaporator and Clarification House Item no 1 | Dismantling cleaning repairing and refitting work of catcher internal elements of new Semikestner (2300 m2) with leak proof trial | 1 | l s each | bycn4.upcsffl.sre | 80 | |
| 2 | Evaporator and Clarification House Item no 2 | Dismantling fabrication and erection work of Evaporator body or Semikestner or vapour shell complete with save all of uttam quad set | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 3 | Evaporator and Clarification House Item no 3 | Major repair of save all of the evaporator body or Semikestner or vapour shell along with leak proof water and vacuum trail | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 4 | Evaporator and Clarification House Item no 4 | Dismantling fabrication and erection of weak or worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover leak proof water and vacuum trial | 3 | l s each juice heater | bycn4.upcsffl.sre | 80 | |
| 5 | Evaporator and Clarification House Item no 5 | Dismantling fabrication and erection work of the sulphur furnace melter along with hydraulic tested steam coil with all connections and satisfactory trial | 2 | ls each | bycn4.upcsffl.sre | 80 | |
| 6 | Evaporator and Clarification House Item no 6 | Dismantling fabrication and erection work of the sulphur furnace melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial | 2 | ls each | bycn4.upcsffl.sre | 80 | |
| 7 | Evaporator and Clarification House Item no 7 | Dismantling Fabrication and erection of sulphur furnace secondary cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial | 3 | l s each | bycn4.upcsffl.sre | 80 | |
| 8 | Evaporator and Clarification House Item no 8 | Repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its existing connection | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 9 | Evaporator and Clarification House Item no 9 | Dismantling fabrication and erection of Juice receiving bottle fitted at vacuum filter station by providing all its existing connection | 1 | l s each | bycn4.upcsffl.sre | 80 | |
| 10 | Evaporator and Clarification House Item no 10 | Dismantling fabrication and erection of weak or leak condenser at vacuum filter | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 11 | Evaporator and Clarification House Item no 11 | Dismantling fabrication and erection of Muddy juice receiving tank complete with all connection and associated pipe lines along with leak proof trial | 1 | per tank | bycn4.upcsffl.sre | 80 | |
| 12 | Evaporator and Clarification House Item no 12 | Dismantling fabrication and erection of mud tray of vacuum filter 10feet x 20feet vacuum filter along with satisfactory trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 13 | Evaporator and Clarification House Item no 13 | Dismantling fabrication and erection weak mud agitator of 10feet x 20feet vacuum filter along with satisfactory trial | 2 | each | bycn4.upcsffl.sre | 80 | |
| 14 | Evaporator and Clarification House Item no 14 | Dismantling fabrication and erection of mud tray of vacuum filter 14feet x 28feet vacuum filter along with satisfactory trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 15 | Evaporator and Clarification House Item no 15 | Dismantling fabrication and erection weak mud agitator of 14feet x 28feet vacuum filter along with satisfactory trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 16 | Evaporator and Clarification House Item no 16 | Dismantling fabrication and erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 17 | Evaporator and Clarification House Item no 17 | Dismantling fabrication and erection of weak or worn out portion of clear juice Liquidation box along with leak proof trial | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 18 | Evaporator and Clarification House Item no 18 | Dismantling fabrication and erection of weak or worn out clarifier mud boot along with leak proof trial | 2 | each | bycn4.upcsffl.sre | 80 | |
| 19 | Evaporator and Clarification House Item no 19 | Dismantling Fabrication and Erection weak shell of compartment no 1 and 2 of Juice clarifier (Big) Work of New DORR Diameter 28feet Capacity 3750 HL Body shell including completion of all connections and leak proof trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 20 | Evaporator and Clarification House Item no 20 | Dismantling Fabrication and Erection weak shell of compartment no 1 of Juice clarifier (Small) Work of New DORR Diameter 24feet Capacity 2550 HL Body shell including completion of all connections and leak proof trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 21 | Evaporator and Clarification House Item no 21 | Dismantling Fabrication and Erection of weak shell of juice sulphiter 320 HL including completion of all connection and leak proof trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 22 | Evaporator and Clarification House Item no 22 | Dismantling fabrication and erection of Juice catcher for Raw or vacuum orsugar melter orsulphited Juice pumps with suction or delivery connection | 2 | per catcher | bycn4.upcsffl.sre | 80 | |
| 23 | Evaporator and Clarification House Item no 23 | Repairing of Juice Heater Condensate Bottle or Evaporator or Syrup receiving Bottle with leak proof testing partition plate with all connection | 8 | l s each | bycn4.upcsffl.sre | 80 | |
| 24 | Evaporator and Clarification House Item no 24 | Repairing of SO2 furnace sublimation pipe with its leaking Tower etc with testing | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 25 | Evaporator and Clarification House Item no 25 | Dismantling fabrication and erection of vacuum filter mud mixer body and fitting of screw conveyor with proper alignment and satisfactory trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 26 | Evaporator and Clarification House Item no 26 | Fabrication and erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 27 | Evaporator and Clarification House Item no 27 | Dismantling fabrication and fitting of new down take of quad or Old or New semikestner etc | 2 | each | bycn4.upcsffl.sre | 80 | |
| 28 | Evaporator and Clarification House Item no 28 | Dismantling fabrication and erection of weak or leaky recovery tower of juice sulphiter or Syrup Sulphiter | 1 | each | bycn4.upcsffl.sre | 80 | |
| 29 | Evaporator and Clarification House Item no 29 | Repairing of Umbrella and Providing essential supports of Quad | 3 | each | bycn4.upcsffl.sre | 80 | |
| 30 | Evaporator and Clarification House Item no 30 | Dismantling fabrication and erection of worn out Umbrella of Quad with Old or New Plates | 3 | each | bycn4.upcsffl.sre | 80 | |
| 31 | Evaporator and Clarification House Item no 31 | Dismantling fabrication and erection of saveall of Quad old bodies | 2 | each | bycn4.upcsffl.sre | 80 | |
| 32 | Evaporator and Clarification House Item no 32 | Replacement of worn-out top conical portion of Quad and Vapour Shell with save all proper strengthening with associated machinery | 2 | l s | bycn4.upcsffl.sre | 80 | |
| 33 | Evaporator and Clarification House Item no 33 | Dismantling of worn out arms and shell (outside and inside) of juice sulphiter drum fabrication and erection with satisfactory trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 34 | Evaporator and Clarification House Item no 34 | To replace worn out clear juice box or mud discharge box with valve of new dorr followed by satisfactory trial | 2 | each box | bycn4.upcsffl.sre | 80 | |
| 35 | Evaporator and Clarification House Item no 35 | Replacement of worn out mud scrapper plate and fitting of mud scrapper at Vacuum Filter | 2 | each filter | bycn4.upcsffl.sre | 80 | |
| 36 | Evaporator and Clarification House Item no 36 | Major repair of lime slaker with proper alignment and trial | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 37 | Evaporator and Clarification House Item no 37 | To replace worn out sulphur furnace header of size 8 inch or 10 inch between after burner and Cooler | 3 | each | bycn4.upcsffl.sre | 80 | |
| 38 | Evaporator and Clarification House Item no 38 | Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc | 8 | per arm | bycn4.upcsffl.sre | 80 | |
| 39 | Evaporator and Clarification House Item no 39 | Replacement of partition plate of old dorr Compartment or Intermediameterte tray with 5 or 6mm MS plate | 1 | each compartment | bycn4.upcsffl.sre | 80 | |
| 40 | Evaporator and Clarification House Item no 40 | Dismantling of existing 700 Sqm H S Area of Quad body first (Uttam Set Calandria ) Providing the Support for Stay the Shell above Calandria Unloading of New Calandria from Vehicle by their resources shifting of new Calandria at the site Fitting and Erection of Calandria at the Place of Old Calandria with Shell fitting of bottom cone of Calandria inlet Vapour or Exhaust steam Connection water line connection and making all other connection to run the body complete in all respect | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 41 | Pan house item no 1 | Repairing of down-take of Pan for 40 or 50 Ton Pan | 1 | each | bycn4.upcsffl.sre | 80 | |
| 42 | Pan house item no 2 | Repairing of down-take of Pan for 60 or 80 Ton Pan | 1 | each | bycn4.upcsffl.sre | 80 | |
| 43 | Pan house item no 3 | Dismantling of Gutter of Molasses Magma and massecuite | 24 | sq meter | bycn4.upcsffl.sre | 80 | |
| 44 | Pan house item no 4 | Fabrication and fitting of Gutter of Molasses Magma and massecuite | 24 | sq meter | bycn4.upcsffl.sre | 80 | |
| 45 | Pan house item no 5 | Repairing of hinge type cover of Gutter | 6 | each | bycn4.upcsffl.sre | 80 | |
| 46 | Pan house item no 6 | Replacement of worn-out condensate box of pans quad and juice heaters | 4 | each | bycn4.upcsffl.sre | 80 | |
| 47 | Pan house item no 7 | Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 40 or 50 Ton pan | 2 | each | bycn4.upcsffl.sre | 80 | |
| 48 | Pan house item no 8 | Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 60 or 80 Ton pan | 2 | each | bycn4.upcsffl.sre | 80 | |
| 49 | Pan house item no 9 | Repairing of umbrella of Pans with supports and J pipes 40 or 50 Ton pan | 2 | each | bycn4.upcsffl.sre | 80 | |
| 50 | Pan house item no 10 | Repairing of umbrella of Pans with supports and J pipes 60 or 80 Ton pan | 1 | each | bycn4.upcsffl.sre | 80 | |
| 51 | Pan house item no 11 | Replacement of worn out distributor by new for 40 or 50 Ton Pan | 2 | each | bycn4.upcsffl.sre | 80 | |
| 52 | Pan house item no 12 | Replacement of worn out distributor by new for 60 or 80 Ton Pan | 2 | each | bycn4.upcsffl.sre | 80 | |
| 53 | Pan house item no 13 | Replacement of weak sight glass flanges of Pan and Evaporater Body along with leak proof water and vaccuum trial | 6 | each | bycn4.upcsffl.sre | 80 | |
| 54 | Pan house item no 14 | Replacement of complete worn-out or weak top cone of 40 or 50 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 55 | Pan house item no 15 | Replacement of complete worn-out or weak top cone of 60 or 80 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 56 | Pan house item no 16 | Strengthening of 40 or 60 Ton Pan body and Taper Portion with channel etc | 1 | l s | bycn4.upcsffl.sre | 80 | |
| 57 | Pan house item no 17 | Dismantling Fabrication and Erection of Box type feed header for each Pan with all related connections including valves nipples flanges etc | 2 | each | bycn4.upcsffl.sre | 80 | |
| 58 | Pan house item no 18 | Dismantling Fabrication and Erection of weak portion of pan shell with 12mm MS plate along with leak proof water and vacuum trial Welding must be double coated from outside and inside | 18 | per sq meter | bycn4.upcsffl.sre | 80 | |
| 59 | Pan house item no 19 | Replacement of weak orworn out side and bottom plate of cold or hot water over head tank syrup tank and Molasses storage tanks at pan station by providing proper strengthening | 8 | per sq meter | bycn4.upcsffl.sre | 80 | |
| 60 | Pan house item no 20 | Fabrication and erection of complete new down take of 40 or 50 ton pan along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 61 | Pan house item no 21 | Fabrication and erection of complete new down take of 60 or 80 ton pan along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 62 | Pan house item no 22 | Repairing of weak orworn out save-all of 40 or 50 Ton pan along with leak proof water and vacuum trial | 2 | each | bycn4.upcsffl.sre | 80 | |
| 63 | Pan house item no 23 | Dismantling fabrication and erection of pan save all with proper trial 40 or 50 Ton along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 64 | Pan house item no 24 | Dismantling fabrication and erection of 60 or 80 Ton pan save all along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 65 | Pan house item no 25 | Repairing of weak save-all of 60 or 80 Ton pan along with leak proof water and vacuum trial | 1 | each | bycn4.upcsffl.sre | 80 | |
| 66 | Pan house item no 26 | Dismantling Fabrication and Erection of Worn out Portion of the Chute for Pan Discharge Valve with Satisfactory trial | 2 | per chute | bycn4.upcsffl.sre | 80 | |
| 67 | Pan house item no 27 | Repairing or patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor | 1 | per conditioner | bycn4.upcsffl.sre | 80 | |
| 68 | Pan house item no 28 | Dismantling fabrication and fitting work of 80Ton Pan save all internals | 1 | ls | bycn4.upcsffl.sre | 80 | |
| 69 | Pan house item no 29 | Disamantling,Reapiring and Re-fitting with leak proof trial of Collapsed SS Venturi of Pan no 10 Condensor | 1 | l s each | bycn4.upcsffl.sre | 80 | |
| 70 | Injection item no 1 | Replacement of weak/leaky suction and delivery pipe of MF- 50X50/ 40X40 injection and spray pump as per old sample Making and fitting of stone catcher Fitting of Pipe with Pump | 2 | ls each | bycn4.upcsffl.sre | 80 | |
| 71 | Injection item no 2 | Dismantling ,Fabrication and Erection of weak/wornout delivery Pipe of injection pump having one end reducer | 1 | per reducer | bycn4.upcsffl.sre | 80 | |
| 72 | Injection item no 3 | Disamantling,fabrication and fitting work of injection header Suction Pipe Mesh type Stainer | 2 | per stainer | bycn4.upcsffl.sre | 80 | |
| 73 | Schedule work item no 1 | Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 1 inch diameter | 60 | per feet | bycn4.upcsffl.sre | 80 | |
| 74 | Schedule work item no 2 | Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 2 inch diameter | 90 | per feet | bycn4.upcsffl.sre | 80 | |
| 75 | Schedule work item no 3 | Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 3 inch diameter | 60 | per feet | bycn4.upcsffl.sre | 80 | |
| 76 | Schedule work item no 4 | Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 4 inch diameter | 75 | per feet | bycn4.upcsffl.sre | 80 | |
| 77 | Schedule work item no 5 | Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 5 inch diameter | 75 | per feet | bycn4.upcsffl.sre | 80 | |
| 78 | Schedule work item no 6 | Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 6 inch diameter | 150 | per feet | bycn4.upcsffl.sre | 80 | |
| 79 | Schedule work item no 7 | Dismantling fabrication and Erection of Bend Size-2 inch diameter (MS) | 16 | per nos | bycn4.upcsffl.sre | 80 | |
| 80 | Schedule work item no 8 | Dismantling fabrication and Erection of Bend Size- 3 inch diameter (MS) | 18 | per nos | bycn4.upcsffl.sre | 80 | |
| 81 | Schedule work item no 9 | Dismantling fabrication and Erection of Bend Size- 4 inch diameter (MS) | 24 | per nos | bycn4.upcsffl.sre | 80 | |
| 82 | Schedule work item no 10 | Dismantling fabrication and Erection of Bend Size- 5 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 83 | Schedule work item no 11 | Dismantling fabrication and Erection of Bend Size- 6 inch diameter (MS) | 18 | per nos | bycn4.upcsffl.sre | 80 | |
| 84 | Schedule work item no 12 | Dismantling fabrication and Erection of Bend Size- 8 inch diameter (MS) | 15 | per nos | bycn4.upcsffl.sre | 80 | |
| 85 | Schedule work item no 13 | Dismantling fabrication and Erection of Bend Size-10 inch diameter (MS) | 8 | per nos | bycn4.upcsffl.sre | 80 | |
| 86 | Schedule work item no 14 | Dismantling fabrication and Erection of Bend Size-12 inch diameter (MS) | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 87 | Schedule work item no 15 | Dismantling fabrication and Erection of Nipple Size- 1inch diameter (MS) | 15 | per nos | bycn4.upcsffl.sre | 80 | |
| 88 | Schedule work item no 16 | Dismantling fabrication and Erection of Nipple Size- 2 inch diameter (MS) | 10 | per nos | bycn4.upcsffl.sre | 80 | |
| 89 | Schedule work item no 17 | Dismantling fabrication and Erection of Nipple Size- 3 inch diameter (MS) | 12 | per nos | bycn4.upcsffl.sre | 80 | |
| 90 | Schedule work item no 18 | Dismantling fabrication and Erection of Nipple Size- 4 inch diameter (MS) | 16 | per nos | bycn4.upcsffl.sre | 80 | |
| 91 | Schedule work item no 19 | Dismantling fabrication and Erection of Nipple Size- 5 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 92 | Schedule work item no 20 | Dismantling fabrication and Erection of Nipple Size- 6 inch diameter (MS) | 8 | per nos | bycn4.upcsffl.sre | 80 | |
| 93 | Schedule work item no 21 | Dismantling fabrication and Erection of Nipple Size- 8 inch diameter (MS) | 8 | per nos | bycn4.upcsffl.sre | 80 | |
| 94 | Schedule work item no 22 | Dismantling fabrication and Erection of Nipple Size- 10 inch diameter (MS) | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 95 | Schedule work item no 23 | Dismantling fabrication and Erection of Nipple Size- 12 inch diameter (MS) | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 96 | Schedule work item no 24 | Dismantling fabrication and Erection of Cross Size- 6 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 97 | Schedule work item no 25 | Dismantling fabrication and Erection of Cross Size- 8 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 98 | Schedule work item no 26 | Dismantling fabrication and Erection of Cross Size- 10 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 99 | Schedule work item no 27 | Dismantling fabrication and Erection of Tee Size- 4 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 100 | Schedule work item no 28 | Dismantling fabrication and Erection of Tee Size- 5 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 101 | Schedule work item no 29 | Dismantling fabrication and Erection of Tee Size- 6 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 102 | Schedule work item no 30 | Dismantling fabrication and Erection of Tee Size- 8 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 103 | Schedule work item no 31 | Dismantling fabrication and Erection of Tee Size- 10 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 104 | Schedule work item no 32 | Dismantling fabrication and Erection of Tee Size- 12 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 105 | Schedule work item no 33 | Dismantling fabrication and Erection of Flange Size- 4 inch diameter (MS) | 16 | per nos | bycn4.upcsffl.sre | 80 | |
| 106 | Schedule work item no 34 | Dismantling fabrication and Erection of Flange Size- 5 inch diameter (MS) | 8 | per nos | bycn4.upcsffl.sre | 80 | |
| 107 | Schedule work item no 35 | Dismantling fabrication and Erection of Flange Size- 6 inch diameter (MS) | 20 | per nos | bycn4.upcsffl.sre | 80 | |
| 108 | Schedule work item no 36 | Dismantling fabrication and Erection of Flange Size- 8 inch diameter (MS) | 16 | per nos | bycn4.upcsffl.sre | 80 | |
| 109 | Schedule work item no 37 | Dismantling fabrication and Erection of Flange Size- 10 inch diameter (MS) | 12 | per nos | bycn4.upcsffl.sre | 80 | |
| 110 | Schedule work item no 38 | Dismantling fabrication and Erection of Flange Size- 12 inch diameter (MS) | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 111 | Schedule work item no 39 | Dismantling fabrication and Erection of Reducer Size-4 inch diameter (MS) | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 112 | Schedule work item no 40 | Dismantling fabrication and Erection of Reducer Size-5 inch diameter (MS) | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 113 | Schedule work item no 41 | Dismantling fabrication and Erection of Reducer Size-6 inch diameter (MS) | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 114 | Schedule work item no 42 | Dismantling fabrication and Erection of Reducer Size-8 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 115 | Schedule work item no 43 | Dismantling fabrication and Erection of Reducer Size-10 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 116 | Schedule work item no 44 | Dismantling fabrication and Erection of Reducer Size-12 inch diameter (MS) | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 117 | Schedule work item no 45 | Dismantling and fitting of valve Size- 3 inch diameter | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 118 | Schedule work item no 46 | Dismantling and fitting of valve Size- 4 inch diameter | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 119 | Schedule work item no 47 | Dismantling and fitting of valve Size- 5 inch diameter | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 120 | Schedule work item no 48 | Dismantling and fitting of valve Size- 6 inch diameter | 6 | per nos | bycn4.upcsffl.sre | 80 | |
| 121 | Schedule work item no 49 | Dismantling and fitting of valve Size- 8 inch diameter | 4 | per nos | bycn4.upcsffl.sre | 80 | |
| 122 | Schedule work item no 50 | Dismantling and fitting of valve Size- 10 inch diameter | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 123 | Schedule work item no 51 | Dismantling and fitting of valve Size- 12 inch diameter | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 124 | Schedule work item no 52 | Dismantling Fabrication and fitting of man hole | 15 | each | bycn4.upcsffl.sre | 80 | |
| 125 | Schedule work item no 53 | Dismantling Fabrication and erection of platform by using old/new plate | 3 | per ton | bycn4.upcsffl.sre | 80 | |
| 126 | Schedule work item no 54 | Fabrication and erection of railing from old Material | 40 | per mtr | bycn4.upcsffl.sre | 80 | |
| 127 | Schedule work item no 55 | Fabrication and erection of T ring for strengthening of evaporator /Pan vapour Pipe | 22 | per ring | bycn4.upcsffl.sre | 80 | |
| 128 | Schedule work item no 56 | Dismantling of MS heavy structure / Tank | 25 | per mt | bycn4.upcsffl.sre | 80 | |
| 129 | Schedule work item no 57 | Dismantling of MS Light structure | 25 | per mt | bycn4.upcsffl.sre | 80 | |
| 130 | Schedule work item no 58 | Fabrication and Erection Light structure | 25 | per mt | bycn4.upcsffl.sre | 80 | |
| 131 | Schedule work item no 59 | Fabrication and Erection heavy structure | 25 | per mt | bycn4.upcsffl.sre | 80 | |
| 132 | Schedule work item no 60 | Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 7 5 H P | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 133 | Schedule work item no 61 | Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 10 H P | 2 | per nos | bycn4.upcsffl.sre | 80 | |
| 134 | Schedule work item no 62 | Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 25 H P | 1 | per nos | bycn4.upcsffl.sre | 80 | |
| 135 | Schedule work item no 63 | Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 30 H P | 1 | per nos | bycn4.upcsffl.sre | 80 | |
| 136 | Schedule work item no 64 | Dismantling and cleaning of MS Pipe Line with bend, flange , nipple etc | 200 | per feet | bycn4.upcsffl.sre | 80 | |
| 137 | Schedule work item no 65 | Fitting of MS pipe line with bend, flange ,nipple etc after cleaning | 200 | per feet | bycn4.upcsffl.sre | 80 | |
| 138 | Schedule work item no 66 | Fabrication and Erection of complete Square / Rectangular /Round Tank with conical Bottom | 25 | per mt | bycn4.upcsffl.sre | 80 | |
| 139 | Schedule work item no 67 | Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-25mm | 75 | per feet | bycn4.upcsffl.sre | 80 | |
| 140 | Schedule work item no 68 | Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-50mm | 60 | per feet | bycn4.upcsffl.sre | 80 | |
| 141 | Schedule work item no 69 | Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-75mm | 40 | per feet | bycn4.upcsffl.sre | 80 | |
| 142 | Schedule work item no 70 | Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-100mm | 36 | per feet | bycn4.upcsffl.sre | 80 | |
| 143 | Schedule work item no 71 | Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-125mm | 80 | per feet | bycn4.upcsffl.sre | 80 | |
| 144 | Schedule work item no 72 | Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-150mm | 160 | per feet | bycn4.upcsffl.sre | 80 | |
| 145 | Schedule work item no 73 | Dismantling, Fabrication and fitting of new Cone and umbrella any where in the factory Cone above 01 Mtr Dia upto 25mtr dia | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 146 | Schedule work item no 74 | Dismantling , Fabrication and fitting of new Cone and umbrella any where in the factory, Cone above 25 Mtr Dia | 2 | l s each | bycn4.upcsffl.sre | 80 | |
| 147 | Schedule work item no 75 | Fabrication and Patchwork of equipments using old/ New MS plate by 6/8 mm thick plate over round vessels/any vessels | 56 | per mtr2 | bycn4.upcsffl.sre | 80 | |
| 148 | Schedule work item no 76 | Disamntling Fabrication and Erection of Weak Vapor/Exhaust steam Pipe line and bend Dia from 500mm to 900mm complete in all respect with leak proof trial | 52 | per ton | bycn4.upcsffl.sre | 80 | |
| 149 | Schedule work item no 77 | Disamntling Fabrication and Erection of intermediate Vapor pipe/Vapor pipe and bends of Quad bodies and Vapor pipe and bends of PAN dia from 900 mm to 1300 mm complete in all respect with leak proof trial | 95 | per ton | bycn4.upcsffl.sre | 80 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Directorate Of Purchase And Stores
📍 MUMBAI, MAHARASHTRA
📍 FARIDABAD, HARYANA
National Council For Cement And Building Materials (nccbm)
📍 FARIDABAD, HARYANA
N/a
📍 GANDHI NAGAR, GUJARAT
Director General Of National Cadet Corps (dgncc)
📍 HYDERABAD, TELANGANA
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS