TenderDekho Logo
GEM

Invitation to Bid - Evaporator and Clarification House Item no 1,Evaporator and Clarification House Item no 2,Evaporato in SAHARANPUR, UTTAR PRADESH

Bid Publish Date

30-Jun-2026, 5:19 pm

Bid End Date

15-Jul-2026, 6:00 pm

EMD

₹30,000

Value

₹15,00,000

Progress

Issue30-Jun-2026, 5:19 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2333

Category

Evaporator and Clarification House Item no 1

Bid Type

Two Packet Bid

Categories 94

A tender has been published for N/a Evaporator and Clarification House Item no 1, Evaporator and Clarification House Item no 2, Evaporato in SAHARANPUR, UTTAR PRADESH. Quantity: 2333 by. Submission Deadline: 15-07-2026 18: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9527729.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

NIPER Rae Bareli Electroporator Tender Lucknow Uttar Pradesh 2025 - Electroporator Supply Procurement

National Institute Of Pharmaceutical Education And Research (niper) Rae Bareli

LUCKNOW, UTTAR PRADESH

Posted: 9 December 2025
Closed: 30 December 2025
GEM

Government Tender Published for EVAPORATOR in HARIDWAR, UTTARAKHAND

N/A

HARIDWAR, UTTARAKHAND

Posted: 25 October 2024
Closed: 18 November 2024
EPROCURE

Tender Notice for EVAPORATOR 5TH BODY CALANDRIA 440 M2 HSA 1 No in VELLORE, TAMIL NADU

N/A

VELLORE, TAMIL NADU

Closed: 30 May 2025
EPROCURE

Rotary Evaporator System with Accessories

Institute Of Nano Science And Technology

Posted: 22 October 2024
Closed: 4 December 2024
GEM

Procurement Opportunity: Purchase of Rotary evaporator , vacuum pump and Chiller Being a propriety item in CHANDIGARH, CHANDIGARH

N/A

CHANDIGARH, CHANDIGARH

Posted: 14 November 2019
Closed: 4 December 2019
EPROCURE

Bill of Quantities (BOQ) 149 Items Sign in for GEM prices

#1

Evaporator and Clarification House Item no 1

Dismantling cleaning repairing and refitting work of catcher internal elements of new Semikestner (2300 m2) with leak proof trial

1 l s each Delivery: 80 days
#2

Evaporator and Clarification House Item no 2

Dismantling fabrication and erection work of Evaporator body or Semikestner or vapour shell complete with save all of uttam quad set

2 l s each Delivery: 80 days
#3

Evaporator and Clarification House Item no 3

Major repair of save all of the evaporator body or Semikestner or vapour shell along with leak proof water and vacuum trail

2 l s each Delivery: 80 days
#4

Evaporator and Clarification House Item no 4

Dismantling fabrication and erection of weak or worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover leak proof water and vacuum trial

3 l s each juice heater Delivery: 80 days
#5

Evaporator and Clarification House Item no 5

Dismantling fabrication and erection work of the sulphur furnace melter along with hydraulic tested steam coil with all connections and satisfactory trial

2 ls each Delivery: 80 days
#6

Evaporator and Clarification House Item no 6

Dismantling fabrication and erection work of the sulphur furnace melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial

2 ls each Delivery: 80 days
#7

Evaporator and Clarification House Item no 7

Dismantling Fabrication and erection of sulphur furnace secondary cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial

3 l s each Delivery: 80 days
#8

Evaporator and Clarification House Item no 8

Repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its existing connection

2 l s each Delivery: 80 days
#9

Evaporator and Clarification House Item no 9

Dismantling fabrication and erection of Juice receiving bottle fitted at vacuum filter station by providing all its existing connection

1 l s each Delivery: 80 days
#10

Evaporator and Clarification House Item no 10

Dismantling fabrication and erection of weak or leak condenser at vacuum filter

2 l s each Delivery: 80 days
#11

Evaporator and Clarification House Item no 11

Dismantling fabrication and erection of Muddy juice receiving tank complete with all connection and associated pipe lines along with leak proof trial

1 per tank Delivery: 80 days
#12

Evaporator and Clarification House Item no 12

Dismantling fabrication and erection of mud tray of vacuum filter 10feet x 20feet vacuum filter along with satisfactory trial

1 l s Delivery: 80 days
#13

Evaporator and Clarification House Item no 13

Dismantling fabrication and erection weak mud agitator of 10feet x 20feet vacuum filter along with satisfactory trial

2 each Delivery: 80 days
#14

Evaporator and Clarification House Item no 14

Dismantling fabrication and erection of mud tray of vacuum filter 14feet x 28feet vacuum filter along with satisfactory trial

1 l s Delivery: 80 days
#15

Evaporator and Clarification House Item no 15

Dismantling fabrication and erection weak mud agitator of 14feet x 28feet vacuum filter along with satisfactory trial

1 each Delivery: 80 days
#16

Evaporator and Clarification House Item no 16

Dismantling fabrication and erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial

2 l s each Delivery: 80 days
#17

Evaporator and Clarification House Item no 17

Dismantling fabrication and erection of weak or worn out portion of clear juice Liquidation box along with leak proof trial

2 l s each Delivery: 80 days
#18

Evaporator and Clarification House Item no 18

Dismantling fabrication and erection of weak or worn out clarifier mud boot along with leak proof trial

2 each Delivery: 80 days
#19

Evaporator and Clarification House Item no 19

Dismantling Fabrication and Erection weak shell of compartment no 1 and 2 of Juice clarifier (Big) Work of New DORR Diameter 28feet Capacity 3750 HL Body shell including completion of all connections and leak proof trial

1 l s Delivery: 80 days
#20

Evaporator and Clarification House Item no 20

Dismantling Fabrication and Erection weak shell of compartment no 1 of Juice clarifier (Small) Work of New DORR Diameter 24feet Capacity 2550 HL Body shell including completion of all connections and leak proof trial

1 l s Delivery: 80 days
#21

Evaporator and Clarification House Item no 21

Dismantling Fabrication and Erection of weak shell of juice sulphiter 320 HL including completion of all connection and leak proof trial

1 l s Delivery: 80 days
#22

Evaporator and Clarification House Item no 22

Dismantling fabrication and erection of Juice catcher for Raw or vacuum orsugar melter orsulphited Juice pumps with suction or delivery connection

2 per catcher Delivery: 80 days
#23

Evaporator and Clarification House Item no 23

Repairing of Juice Heater Condensate Bottle or Evaporator or Syrup receiving Bottle with leak proof testing partition plate with all connection

8 l s each Delivery: 80 days
#24

Evaporator and Clarification House Item no 24

Repairing of SO2 furnace sublimation pipe with its leaking Tower etc with testing

2 l s each Delivery: 80 days
#25

Evaporator and Clarification House Item no 25

Dismantling fabrication and erection of vacuum filter mud mixer body and fitting of screw conveyor with proper alignment and satisfactory trial

1 l s Delivery: 80 days
#26

Evaporator and Clarification House Item no 26

Fabrication and erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial

1 l s Delivery: 80 days
#27

Evaporator and Clarification House Item no 27

Dismantling fabrication and fitting of new down take of quad or Old or New semikestner etc

2 each Delivery: 80 days
#28

Evaporator and Clarification House Item no 28

Dismantling fabrication and erection of weak or leaky recovery tower of juice sulphiter or Syrup Sulphiter

1 each Delivery: 80 days
#29

Evaporator and Clarification House Item no 29

Repairing of Umbrella and Providing essential supports of Quad

3 each Delivery: 80 days
#30

Evaporator and Clarification House Item no 30

Dismantling fabrication and erection of worn out Umbrella of Quad with Old or New Plates

3 each Delivery: 80 days
#31

Evaporator and Clarification House Item no 31

Dismantling fabrication and erection of saveall of Quad old bodies

2 each Delivery: 80 days
#32

Evaporator and Clarification House Item no 32

Replacement of worn-out top conical portion of Quad and Vapour Shell with save all proper strengthening with associated machinery

2 l s Delivery: 80 days
#33

Evaporator and Clarification House Item no 33

Dismantling of worn out arms and shell (outside and inside) of juice sulphiter drum fabrication and erection with satisfactory trial

1 l s Delivery: 80 days
#34

Evaporator and Clarification House Item no 34

To replace worn out clear juice box or mud discharge box with valve of new dorr followed by satisfactory trial

2 each box Delivery: 80 days
#35

Evaporator and Clarification House Item no 35

Replacement of worn out mud scrapper plate and fitting of mud scrapper at Vacuum Filter

2 each filter Delivery: 80 days
#36

Evaporator and Clarification House Item no 36

Major repair of lime slaker with proper alignment and trial

1 l s Delivery: 80 days
#37

Evaporator and Clarification House Item no 37

To replace worn out sulphur furnace header of size 8 inch or 10 inch between after burner and Cooler

3 each Delivery: 80 days
#38

Evaporator and Clarification House Item no 38

Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc

8 per arm Delivery: 80 days
#39

Evaporator and Clarification House Item no 39

Replacement of partition plate of old dorr Compartment or Intermediameterte tray with 5 or 6mm MS plate

1 each compartment Delivery: 80 days
#40

Evaporator and Clarification House Item no 40

Dismantling of existing 700 Sqm H S Area of Quad body first (Uttam Set Calandria ) Providing the Support for Stay the Shell above Calandria Unloading of New Calandria from Vehicle by their resources shifting of new Calandria at the site Fitting and Erection of Calandria at the Place of Old Calandria with Shell fitting of bottom cone of Calandria inlet Vapour or Exhaust steam Connection water line connection and making all other connection to run the body complete in all respect

1 l s Delivery: 80 days
#41

Pan house item no 1

Repairing of down-take of Pan for 40 or 50 Ton Pan

1 each Delivery: 80 days
#42

Pan house item no 2

Repairing of down-take of Pan for 60 or 80 Ton Pan

1 each Delivery: 80 days
#43

Pan house item no 3

Dismantling of Gutter of Molasses Magma and massecuite

24 sq meter Delivery: 80 days
#44

Pan house item no 4

Fabrication and fitting of Gutter of Molasses Magma and massecuite

24 sq meter Delivery: 80 days
#45

Pan house item no 5

Repairing of hinge type cover of Gutter

6 each Delivery: 80 days
#46

Pan house item no 6

Replacement of worn-out condensate box of pans quad and juice heaters

4 each Delivery: 80 days
#47

Pan house item no 7

Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 40 or 50 Ton pan

2 each Delivery: 80 days
#48

Pan house item no 8

Dismantling Fabrication and fitting of new umbrella in pans with supports and J pipes 60 or 80 Ton pan

2 each Delivery: 80 days
#49

Pan house item no 9

Repairing of umbrella of Pans with supports and J pipes 40 or 50 Ton pan

2 each Delivery: 80 days
#50

Pan house item no 10

Repairing of umbrella of Pans with supports and J pipes 60 or 80 Ton pan

1 each Delivery: 80 days
#51

Pan house item no 11

Replacement of worn out distributor by new for 40 or 50 Ton Pan

2 each Delivery: 80 days
#52

Pan house item no 12

Replacement of worn out distributor by new for 60 or 80 Ton Pan

2 each Delivery: 80 days
#53

Pan house item no 13

Replacement of weak sight glass flanges of Pan and Evaporater Body along with leak proof water and vaccuum trial

6 each Delivery: 80 days
#54

Pan house item no 14

Replacement of complete worn-out or weak top cone of 40 or 50 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial

1 each Delivery: 80 days
#55

Pan house item no 15

Replacement of complete worn-out or weak top cone of 60 or 80 Ton Pan by new with supports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial

1 each Delivery: 80 days
#56

Pan house item no 16

Strengthening of 40 or 60 Ton Pan body and Taper Portion with channel etc

1 l s Delivery: 80 days
#57

Pan house item no 17

Dismantling Fabrication and Erection of Box type feed header for each Pan with all related connections including valves nipples flanges etc

2 each Delivery: 80 days
#58

Pan house item no 18

Dismantling Fabrication and Erection of weak portion of pan shell with 12mm MS plate along with leak proof water and vacuum trial Welding must be double coated from outside and inside

18 per sq meter Delivery: 80 days
#59

Pan house item no 19

Replacement of weak orworn out side and bottom plate of cold or hot water over head tank syrup tank and Molasses storage tanks at pan station by providing proper strengthening

8 per sq meter Delivery: 80 days
#60

Pan house item no 20

Fabrication and erection of complete new down take of 40 or 50 ton pan along with leak proof water and vacuum trial

1 each Delivery: 80 days
#61

Pan house item no 21

Fabrication and erection of complete new down take of 60 or 80 ton pan along with leak proof water and vacuum trial

1 each Delivery: 80 days
#62

Pan house item no 22

Repairing of weak orworn out save-all of 40 or 50 Ton pan along with leak proof water and vacuum trial

2 each Delivery: 80 days
#63

Pan house item no 23

Dismantling fabrication and erection of pan save all with proper trial 40 or 50 Ton along with leak proof water and vacuum trial

1 each Delivery: 80 days
#64

Pan house item no 24

Dismantling fabrication and erection of 60 or 80 Ton pan save all along with leak proof water and vacuum trial

1 each Delivery: 80 days
#65

Pan house item no 25

Repairing of weak save-all of 60 or 80 Ton pan along with leak proof water and vacuum trial

1 each Delivery: 80 days
#66

Pan house item no 26

Dismantling Fabrication and Erection of Worn out Portion of the Chute for Pan Discharge Valve with Satisfactory trial

2 per chute Delivery: 80 days
#67

Pan house item no 27

Repairing or patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor

1 per conditioner Delivery: 80 days
#68

Pan house item no 28

Dismantling fabrication and fitting work of 80Ton Pan save all internals

1 ls Delivery: 80 days
#69

Pan house item no 29

Disamantling,Reapiring and Re-fitting with leak proof trial of Collapsed SS Venturi of Pan no 10 Condensor

1 l s each Delivery: 80 days
#70

Injection item no 1

Replacement of weak/leaky suction and delivery pipe of MF- 50X50/ 40X40 injection and spray pump as per old sample Making and fitting of stone catcher Fitting of Pipe with Pump

2 ls each Delivery: 80 days
#71

Injection item no 2

Dismantling ,Fabrication and Erection of weak/wornout delivery Pipe of injection pump having one end reducer

1 per reducer Delivery: 80 days
#72

Injection item no 3

Disamantling,fabrication and fitting work of injection header Suction Pipe Mesh type Stainer

2 per stainer Delivery: 80 days
#73

Schedule work item no 1

Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 1 inch diameter

60 per feet Delivery: 80 days
#74

Schedule work item no 2

Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 2 inch diameter

90 per feet Delivery: 80 days
#75

Schedule work item no 3

Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 3 inch diameter

60 per feet Delivery: 80 days
#76

Schedule work item no 4

Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 4 inch diameter

75 per feet Delivery: 80 days
#77

Schedule work item no 5

Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 5 inch diameter

75 per feet Delivery: 80 days
#78

Schedule work item no 6

Dismantling ,Fabrication and Erection of M S Pipe Line including bend or flange etc 6 inch diameter

150 per feet Delivery: 80 days
#79

Schedule work item no 7

Dismantling fabrication and Erection of Bend Size-2 inch diameter (MS)

16 per nos Delivery: 80 days
#80

Schedule work item no 8

Dismantling fabrication and Erection of Bend Size- 3 inch diameter (MS)

18 per nos Delivery: 80 days
#81

Schedule work item no 9

Dismantling fabrication and Erection of Bend Size- 4 inch diameter (MS)

24 per nos Delivery: 80 days
#82

Schedule work item no 10

Dismantling fabrication and Erection of Bend Size- 5 inch diameter (MS)

4 per nos Delivery: 80 days
#83

Schedule work item no 11

Dismantling fabrication and Erection of Bend Size- 6 inch diameter (MS)

18 per nos Delivery: 80 days
#84

Schedule work item no 12

Dismantling fabrication and Erection of Bend Size- 8 inch diameter (MS)

15 per nos Delivery: 80 days
#85

Schedule work item no 13

Dismantling fabrication and Erection of Bend Size-10 inch diameter (MS)

8 per nos Delivery: 80 days
#86

Schedule work item no 14

Dismantling fabrication and Erection of Bend Size-12 inch diameter (MS)

6 per nos Delivery: 80 days
#87

Schedule work item no 15

Dismantling fabrication and Erection of Nipple Size- 1inch diameter (MS)

15 per nos Delivery: 80 days
#88

Schedule work item no 16

Dismantling fabrication and Erection of Nipple Size- 2 inch diameter (MS)

10 per nos Delivery: 80 days
#89

Schedule work item no 17

Dismantling fabrication and Erection of Nipple Size- 3 inch diameter (MS)

12 per nos Delivery: 80 days
#90

Schedule work item no 18

Dismantling fabrication and Erection of Nipple Size- 4 inch diameter (MS)

16 per nos Delivery: 80 days
#91

Schedule work item no 19

Dismantling fabrication and Erection of Nipple Size- 5 inch diameter (MS)

2 per nos Delivery: 80 days
#92

Schedule work item no 20

Dismantling fabrication and Erection of Nipple Size- 6 inch diameter (MS)

8 per nos Delivery: 80 days
#93

Schedule work item no 21

Dismantling fabrication and Erection of Nipple Size- 8 inch diameter (MS)

8 per nos Delivery: 80 days
#94

Schedule work item no 22

Dismantling fabrication and Erection of Nipple Size- 10 inch diameter (MS)

6 per nos Delivery: 80 days
#95

Schedule work item no 23

Dismantling fabrication and Erection of Nipple Size- 12 inch diameter (MS)

6 per nos Delivery: 80 days
#96

Schedule work item no 24

Dismantling fabrication and Erection of Cross Size- 6 inch diameter (MS)

4 per nos Delivery: 80 days
#97

Schedule work item no 25

Dismantling fabrication and Erection of Cross Size- 8 inch diameter (MS)

4 per nos Delivery: 80 days
#98

Schedule work item no 26

Dismantling fabrication and Erection of Cross Size- 10 inch diameter (MS)

2 per nos Delivery: 80 days
#99

Schedule work item no 27

Dismantling fabrication and Erection of Tee Size- 4 inch diameter (MS)

4 per nos Delivery: 80 days
#100

Schedule work item no 28

Dismantling fabrication and Erection of Tee Size- 5 inch diameter (MS)

2 per nos Delivery: 80 days
#101

Schedule work item no 29

Dismantling fabrication and Erection of Tee Size- 6 inch diameter (MS)

4 per nos Delivery: 80 days
#102

Schedule work item no 30

Dismantling fabrication and Erection of Tee Size- 8 inch diameter (MS)

2 per nos Delivery: 80 days
#103

Schedule work item no 31

Dismantling fabrication and Erection of Tee Size- 10 inch diameter (MS)

2 per nos Delivery: 80 days
#104

Schedule work item no 32

Dismantling fabrication and Erection of Tee Size- 12 inch diameter (MS)

2 per nos Delivery: 80 days
#105

Schedule work item no 33

Dismantling fabrication and Erection of Flange Size- 4 inch diameter (MS)

16 per nos Delivery: 80 days
#106

Schedule work item no 34

Dismantling fabrication and Erection of Flange Size- 5 inch diameter (MS)

8 per nos Delivery: 80 days
#107

Schedule work item no 35

Dismantling fabrication and Erection of Flange Size- 6 inch diameter (MS)

20 per nos Delivery: 80 days
#108

Schedule work item no 36

Dismantling fabrication and Erection of Flange Size- 8 inch diameter (MS)

16 per nos Delivery: 80 days
#109

Schedule work item no 37

Dismantling fabrication and Erection of Flange Size- 10 inch diameter (MS)

12 per nos Delivery: 80 days
#110

Schedule work item no 38

Dismantling fabrication and Erection of Flange Size- 12 inch diameter (MS)

6 per nos Delivery: 80 days
#111

Schedule work item no 39

Dismantling fabrication and Erection of Reducer Size-4 inch diameter (MS)

6 per nos Delivery: 80 days
#112

Schedule work item no 40

Dismantling fabrication and Erection of Reducer Size-5 inch diameter (MS)

2 per nos Delivery: 80 days
#113

Schedule work item no 41

Dismantling fabrication and Erection of Reducer Size-6 inch diameter (MS)

6 per nos Delivery: 80 days
#114

Schedule work item no 42

Dismantling fabrication and Erection of Reducer Size-8 inch diameter (MS)

4 per nos Delivery: 80 days
#115

Schedule work item no 43

Dismantling fabrication and Erection of Reducer Size-10 inch diameter (MS)

4 per nos Delivery: 80 days
#116

Schedule work item no 44

Dismantling fabrication and Erection of Reducer Size-12 inch diameter (MS)

4 per nos Delivery: 80 days
#117

Schedule work item no 45

Dismantling and fitting of valve Size- 3 inch diameter

4 per nos Delivery: 80 days
#118

Schedule work item no 46

Dismantling and fitting of valve Size- 4 inch diameter

6 per nos Delivery: 80 days
#119

Schedule work item no 47

Dismantling and fitting of valve Size- 5 inch diameter

2 per nos Delivery: 80 days
#120

Schedule work item no 48

Dismantling and fitting of valve Size- 6 inch diameter

6 per nos Delivery: 80 days
#121

Schedule work item no 49

Dismantling and fitting of valve Size- 8 inch diameter

4 per nos Delivery: 80 days
#122

Schedule work item no 50

Dismantling and fitting of valve Size- 10 inch diameter

2 per nos Delivery: 80 days
#123

Schedule work item no 51

Dismantling and fitting of valve Size- 12 inch diameter

2 per nos Delivery: 80 days
#124

Schedule work item no 52

Dismantling Fabrication and fitting of man hole

15 each Delivery: 80 days
#125

Schedule work item no 53

Dismantling Fabrication and erection of platform by using old/new plate

3 per ton Delivery: 80 days
#126

Schedule work item no 54

Fabrication and erection of railing from old Material

40 per mtr Delivery: 80 days
#127

Schedule work item no 55

Fabrication and erection of T ring for strengthening of evaporator /Pan vapour Pipe

22 per ring Delivery: 80 days
#128

Schedule work item no 56

Dismantling of MS heavy structure / Tank

25 per mt Delivery: 80 days
#129

Schedule work item no 57

Dismantling of MS Light structure

25 per mt Delivery: 80 days
#130

Schedule work item no 58

Fabrication and Erection Light structure

25 per mt Delivery: 80 days
#131

Schedule work item no 59

Fabrication and Erection heavy structure

25 per mt Delivery: 80 days
#132

Schedule work item no 60

Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 7 5 H P

2 per nos Delivery: 80 days
#133

Schedule work item no 61

Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 10 H P

2 per nos Delivery: 80 days
#134

Schedule work item no 62

Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 25 H P

1 per nos Delivery: 80 days
#135

Schedule work item no 63

Fabrication of Pump bed with Pump, Reduction gear and motor alignment up to 30 H P

1 per nos Delivery: 80 days
#136

Schedule work item no 64

Dismantling and cleaning of MS Pipe Line with bend, flange , nipple etc

200 per feet Delivery: 80 days
#137

Schedule work item no 65

Fitting of MS pipe line with bend, flange ,nipple etc after cleaning

200 per feet Delivery: 80 days
#138

Schedule work item no 66

Fabrication and Erection of complete Square / Rectangular /Round Tank with conical Bottom

25 per mt Delivery: 80 days
#139

Schedule work item no 67

Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-25mm

75 per feet Delivery: 80 days
#140

Schedule work item no 68

Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-50mm

60 per feet Delivery: 80 days
#141

Schedule work item no 69

Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-75mm

40 per feet Delivery: 80 days
#142

Schedule work item no 70

Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-100mm

36 per feet Delivery: 80 days
#143

Schedule work item no 71

Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-125mm

80 per feet Delivery: 80 days
#144

Schedule work item no 72

Fabrication and fitting of MS Coil (coils are to be duly bend and not offset pipe welding Offset welds shall not be treated as coils but as pipes ) Size-150mm

160 per feet Delivery: 80 days
#145

Schedule work item no 73

Dismantling, Fabrication and fitting of new Cone and umbrella any where in the factory Cone above 01 Mtr Dia upto 25mtr dia

2 l s each Delivery: 80 days
#146

Schedule work item no 74

Dismantling , Fabrication and fitting of new Cone and umbrella any where in the factory, Cone above 25 Mtr Dia

2 l s each Delivery: 80 days
#147

Schedule work item no 75

Fabrication and Patchwork of equipments using old/ New MS plate by 6/8 mm thick plate over round vessels/any vessels

56 per mtr2 Delivery: 80 days
#148

Schedule work item no 76

Disamntling Fabrication and Erection of Weak Vapor/Exhaust steam Pipe line and bend Dia from 500mm to 900mm complete in all respect with leak proof trial

52 per ton Delivery: 80 days
#149

Schedule work item no 77

Disamntling Fabrication and Erection of intermediate Vapor pipe/Vapor pipe and bends of Quad bodies and Vapor pipe and bends of PAN dia from 900 mm to 1300 mm complete in all respect with leak proof trial

95 per ton Delivery: 80 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found

Evaporator,Heat exchanger,Separator,Condenser

Directorate Of Purchase And Stores

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Rotary evaporators and accessories

📍 FARIDABAD, HARYANA

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Electric items, Plumbing items, Refrigeration gases

National Council For Cement And Building Materials (nccbm)

📍 FARIDABAD, HARYANA

EMD: ₹18,000
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Acid,Air Freshener 275 Gms,Air Freshener Premium 270 ml,Automatic Airfreshener Dispencer Machine,Di

N/a

📍 GANDHI NAGAR, GUJARAT

EMD: ₹1.8 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Desert Cooler,Water dispencer,Refrigerator,Chair,CD shredder

Director General Of National Cadet Corps (dgncc)

📍 HYDERABAD, TELANGANA

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM