GEM

Central Railway Manning Outsourcing Tender 25 KV/AC TSS GPR SSP Pune Division 2026

Bid Publish Date

20-Jan-2026, 12:14 am

Bid End Date

10-Feb-2026, 10:00 am

EMD

₹4,59,408

Value

₹2,29,70,396

Progress

Issue20-Jan-2026, 12:14 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Bid Type

Two Packet Bid

Key Highlights

  • Central Railway outsourcing for 25 KV/AC TSS and GPR SSP staffing in Pune Division
  • 18-month contract with 25% flex adjustment in quantity or duration
  • EMD ₹459,408; PBG/e-FDR options; FDR withdrawal conditions specified
  • Dedicated service support with toll-free lines and escalation matrix
  • Total bid value ₹2,297,395.44 (incl GST); 05 schedules in the bid document
  • Compliance with GeM terms, certificates, and OEM authorizations if required
  • Staffing across multiple stations including Ghorpadi, Daund, Talegaon, Karad, Kopargaon

Tender Overview

Central Railway (Indian Railways) invites bids for outsourcing the manning of 25 KV/AC TSS across HDN/UN routes and manning of GPR SSP for OHE switch operations at GCMC in Pune Division, for an 18-month period. The estimated contract value is ₹2,2970,395.44 with an EMD of ₹459,408. The scope covers 25 KV/AC traction systems and SSP staffing in multiple locations (Ghorpadi, Talegaon, Karad, Daund, Belwadi, Nimbal, Padhegaon, Kopargaon). The buyer specifies a flexible quantity/duration clause up to 25% and requires dedicated service support with an escalation matrix. This tender consolidates 05 schedules and notes an EMD/FDR submission path, including potential release conditions and post-award delivery expectations. The focus is on OHE operations, rake movement compliance, and SIN/Van de Bharat integration per Pune Division needs.

Technical Specifications & Requirements

  • Outsourcing scope: Manning of 25 KV/AC TSS and GPR SSP for OHE switch operations in Pune Division
  • Locations: HDN/UN routes, GCMC, Ghorpadi, Talegaon Lonand Satara Karad, Daund Belwandi Nimbalk Padhegaon Kopargaon
  • Period: 18 months contract duration; price schedule total value ₹2,29,70,395.44 incl. GST
  • Staff qualifications: 1 skilled worker per TSS/SSP in three shifts (as per customized bids)
  • Financial terms: EMD ₹459,408; FDR/PBG options; 5% e-bond (PBG) and FDR withdrawal conditions
  • ATC clauses: 25% quantity/duration adjustment allowed pre- and post-contract issuance; dedicated support contact and escalation matrix
  • Compliance: Vendor must upload all required certificates; 5 schedules total; OEM/technical authorizations if applicable

Terms, Conditions & Eligibility

  • EMD: ₹459,408; permissible forms include EMD in bank draft or FDR with stipulations; alternative: fixed deposit receipt endorsed for release conditions
  • PBG/FDR: 5% of contract value as e-PBG; FDR acceptable with borrower name referencing Senior Divisional Finance Manager, Central Railway, Pune Division
  • Delivery schedule: 18-month period with potential 25% adjustment; adherence to Van de Bharat rake movement requirements
  • Documentation: mandatory certificates and documents as per ATC/ATC corrigendum; failure to provide may lead to rejection
  • Support: dedicated toll-free service contact and escalation matrix for post-award support
  • Warranty/penalties: penalties and LCs governed by GeM GTC; ensure timely staffing and compliance with safety standards

Key Specifications

  • Outsource staffing for 25 KV/AC TSS and GPR SSP in Pune Division

  • 18-month duration with 25% quantity/duration flex

  • Staff: 1 skilled worker per TSS/SSP in three shifts

  • EMD: ₹459,408; FDR/PBG options; 5% e-bond

  • Locations: HDN/UN routes, GCMC area, multiple towns listed in ATC

Terms & Conditions

  • EMD and PBG/FDR submission as per ATC; 25% flex allowed

  • Delivery period of 18 months with potential quantity/duration adjustments

  • Dedicated service support with escalation matrix required

Important Clauses

Payment Terms

EMD payable upfront; PBG or FDR as security; payment terms aligned with GeM GTC

Delivery Schedule

Staffing commitment for 18 months with 25% adjustment window; timelines linked to contract award

Penalties/Liquidated Damages

Penalties per GeM GTC for non-performance; LD schedule not specified in data provided

Bidder Eligibility

  • Experience in outsourcing security/operational staffing for rail or similar critical infrastructure

  • Demonstrated capability to staff 1 skilled worker per TSS/SSP across multiple locations

  • Financial stability evidenced by turnover and valid GST/PAN registrations

Documents 12

GeM-Bidding-8839190.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Scope Of Work Document

SCOPE_OF_WORK

Payment Terms & Condition

PAYMENT

Other Documents

OTHER

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Custom Bid for Services - THREE YEAR RATE CONTRACT FOR SCAFFOLDING WORKS OF E&C DEPARTMENT

Bharat Petroleum Corporation Ltd

ERNAKULAM, KERALA

Posted: 17 December 2025
Closed: 7 January 2026
GEM

Custom Bid for Services - Annual Maintenance and Service contract of 1 No of omega Passenger lift f

Southern Railway

TIRUCHIRAPPALLI, TAMIL NADU

Posted: 16 December 2025
Closed: 6 January 2026
GEM

Custom Bid for Services - 200145192 Repairing and Rewinding works of Submersible pumps of St-1 and

Ntpc Limited

AMBEDKAR NAGAR, UTTAR PRADESH

Posted: 22 December 2025
Closed: 2 January 2026
GEM

Indian Coast Guard Gearbox Routine Services for C-143 Jamnagar Gujarat 2025

Indian Coast Guard

JAMNAGAR, GUJARAT

Posted: 22 December 2025
Closed: 1 January 2026
GEM

BHEL Bhopal Preventive & Breakdown Maintenance of OTIS Passenger Lift 1 No UHV Lab Bhopal 2025

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 20 December 2025
Closed: 31 December 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar outsourcing of TSS/SSP staffing

4

Financial statements or turnover proof suitable for 18-month contract

5

EMD submission document (DD/FDR or online payment receipt)

6

Technical bid documents and certificate of compliance

7

OEM authorizations (if applicable) and training certificates

8

Any certificates requested in ATC or Corrigendum

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for Central Railway 25 KV TSS outsourcing in Pune?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹459,408. Include technical bid and OEM authorizations if required. The contract runs 18 months with 25% flex, and payment terms follow GeM GTC; ensure FDR/PBG options are prepared.

What documents are required for Manning TSS outsourcing in Pune Division?

Submit GST certificate, PAN, prior experience in rail staffing, financial statements, EMD proof (DD/FDR online), technical bid, and any OEM authorizations. Upload all certificates per ATC; ensure hard-copy FDR delivered within 15 days of award.

What are the technical staffing requirements for GPR SSP in this tender?

The scope includes staffing GPR SSP for OHE switch operations with 1 skilled worker per TSS/SSP in three shifts. Locations include Ghorpadi, Daund, Talegaon, Karad, Kopargaon, and others; ensure 18-month staffing commitment and compliance with railway standards.

What is the EMD amount and acceptable forms for this railway tender?

EMD is ₹459,408. Acceptable forms include bank draft, online payment, or Fixed Deposit Receipt (FDR) endorsed to Senior Divisional Finance Manager, Central Railway, Pune Division. FDR may be released on buyer endorsement; attach scanned proof with bid.

When can contract quantity be increased under option clause for this bid?

The buyer may increase contract quantity or duration up to 25 percent at contract issue, and up to 25 percent post-issuance. Bidders must accept revised quantity/duration without dispute as per ATC terms.

What are the delivery and support requirements after contract award?

Successful bidder must provide dedicated toll-free support and an escalation matrix. Delivery expectations align with 18-month term; ensure post-award service response per escalation contacts and maintain staffing adequacy across all listed locations.

Which standards or certifications are required for railway staffing contracts?

Submit standard railway compliance certificates and any OEM authorizations if applicable. Certificates listed in the bid document/ATC are mandatory; without these, the bid may be rejected.

Similar Tenders

5 found

Custom Bid for Services - NS 1 Manpower cost of Mechanized Cleaning of Coaches of enroute Trains at

North Western Railway

📍 JAIPUR, RAJASTHAN

EMD: ₹13.2 L
Est: ₹23.3 Cr
⏰ Deadline: 4 weeks left
🛒 Type: Service
View GEM

Custom Bid for Services - Per day 11 nos Semi Skilled Labour at STP and 28 nos Unskilled Labour at

North Eastern Railway

📍 LUCKNOW, UTTAR PRADESH

EMD: ₹2.9 L
Est: ₹2.8 Cr
⏰ Deadline: 3 weeks left
🛒 Type: Service
View GEM

Custom Bid for Services - Outsourcing of interior amenity works in pit line/IOH/SS 1/Sick line coac

South Western Railway

EMD: ₹2.4 L
Est: ₹1.8 Cr
⏰ Deadline: 3 weeks left
🛒 Type: Service
View GEM

Custom Bid for Services - Outsourcing of 6 manpower for the work of round the clock manning of COIS

South Western Railway

📍 BANGALORE, KARNATAKA

EMD: ₹1.1 L
Est: ₹55.7 L
⏰ Deadline: 3 weeks left
🛒 Type: Service
View GEM

BEML Packing Contract for 1 Year Palakkad Kerala - 2026 Packing Services Tender

Bharat Earth Movers Limited (beml)

📍 PALAKKAD, KERALA

EMD: ₹69,500
⏰ Deadline: 3 weeks left
🛒 Type: Service
View GEM