Progress
Quantity
5
Category
Supply, Installation & Commissioning of HVAC System in Shaft Generator Panel Room
Bid Type
Two Packet Bid
Goa Shipyard Limited invites bids for Supply, Installation & Commissioning of HVAC Systems in multiple critical areas: Shaft Generator Panel Room, MCR, and Central Hydraulic Power Pack. The scope includes supply, installation, testing and commissioning, with invoicing to the consignee GSTIN and GST portal compliance. The tender specifies an option to adjust quantity up to 50%, across the contract duration, at contracted rates, with delivery timelines tied to the last delivery order. Unique features include mandatory GeM invoice uploads and EFT mandate verification, ensuring seamless GST compliance. This opportunity targets HVAC integrators capable of precise climate control in defense production settings, leveraging turnkey deployment and post-installation support. The procurement aims to ensure robust cooling for high-availability electrical rooms and hydraulic systems, with emphasis on delivery efficiency and statutory tax compliance.
Product/service: HVAC systems for electrical rooms (Shaft Generator Panel Room, MCR) and Central Hydraulic Power Pack
Procurement scope: Supply, Installation, Testing & Commissioning
Delivery/invoice: Invoices in consignee name with consignee GSTIN; GST portal payment verification
Quantity adjustment: Up to 50% increase/decrease at contracted rates during/after contract
Documentation: Review ATC document uploaded by buyer; adhere to GeM invoice requirements
Key Term 1: Quantity variation up to 50% at contracted rates
Key Term 2: Invoices must be raised in consignee name with GSTIN
Key Term 3: GST invoice scans and GST payment screenshot required on GeM portal
Invoices must reflect consignee details and GSTIN; GeM portal GST payment screenshot is required
Delivery timeframe linked to last delivery order date; extended period calculated as (increased quantity/ original quantity) × original delivery period with minimum 30 days
Not specified in data; bidders should anticipate standard GOP/GeM LD terms if referenced in ATC
Experience in HVAC system supply, installation and commissioning for critical rooms
Ability to meet GeM invoicing and GST compliance requirements
Capable of handling turnkey installation and post-installation testing
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply, Installation & Commissioning of HVAC System in Shaft Generator Panel Room , Supply, Installation & Commissioning of HVAC System in MCR , • Supply, Installation & Commissioning of HVAC System in Central Hydraulic Power Pack , Installation Charges towards Service Engineer
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
GST invoice (scanned) for GeM portal upload
GST payment screenshot from GST portal
ATC document (as uploaded by buyer)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | HEINEN & HOPMAN ENGINEERING INDIA PRIVATE LIMITED Under PMA | Make : UNIVARSAL Model : Supply, Install & Commissioning of HVAC 1 Title : Supply, Installation & Commissioning of HVAC System in Shaft Generator Panel Room | 28-03-2026 09:32:46 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | HEINEN & HOPMAN ENGINEERING INDIA PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply, Installation & Commissioning of HVAC System in Shaft Generator Panel Room,Supply, Installat |
Key insights about GOA tender market
Bidders should prepare PAN, GSTIN, Cancelled Cheque and EFT Mandate; submit GST invoice and GST payment proof on GeM; review ATC; ensure turnkey Supply, Installation & Commissioning for Shaft Generator Panel Room, MCR, and Central Hydraulic Power Pack; adhere to 50% quantity option terms.
Submit PAN card, GSTIN,Cancelled cheque, EFT Mandate, GST invoice copy and GST payment screenshot on GeM portal; ATC document; ensure organization data matches consignee details; provide experience certificates for HVAC installations.
Delivery begins after last order date; extended delivery uses formula (increased quantity/original quantity) × original period with a 30-day minimum; ensure timely installation, testing and commissioning.
Raise all invoices in the consignee name with the consignee GSTIN; upload scanned GST invoice on GeM and attach GST payment confirmation screenshot; ensure GSTIN validity before submission.
Scope includes supply, installation, testing and commissioning of HVAC systems for three zones; all costs are included in bid price; ensure turnkey delivery and service support.
ATC document has been uploaded by the buyer; bidders must review and comply with specified technical and documentation requirements; ensure alignment with GeM invoicing and GST processes.
Experience in HVAC installation for critical rooms, ability to provide turnkey solutions, and capability to fulfill GeM and GST requirements; ensure financial capacity for project execution and timely delivery.
Submit scanned GST invoice and GeM payment screenshot during bid submission; ensure all documents align with consignee details and GSTIN; verify ATC terms before final submission.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS