TenderDekho Logo
Active GEM

Government Tender Published for STUD A193 B7 NUT A194 2H 1 7 8x17 7 8IN Bolt with two nuts As per SOW and SCC For Gail Barauni,STUD

Bid Publish Date

12-Aug-2026, 5:20 pm

Bid End Date

02-Sep-2026, 6:00 pm

Progress

Issue12-Aug-2026, 5:20 pm
AwardPending

Public procurement opportunity for Gail India Limited STUD A193 B7 NUT A194 2H 1 7 8x17 7 8IN Bolt with two nuts As per SOW and SCC For Gail Barauni, STUD. Quantity: 2038 issued by. Submission Deadline: 02-09-2026 18: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

2038

Category

STUD A193 B7 NUT A194 2H 1 7 8x17 7 8IN Bolt with two nuts As per SOW and SCC For Gail Barauni

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

30

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

19-08-2026 11:00:00

Pre-Bid Venue

Through MS Teams Microsoft Teams meeting Join: https://teams.microsoft.com/meet/473386048780504? p=huGmIrnTNAVpjBmfDL Meeting ID: 473 386 048 780 504 Passcode: ap2sk7gj

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Purnia

Delivery Pincodes

854301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manish Kumar854301,GAIL (India) Limited, Inside Premises of BSNL Office, Girja ChowkPurniaBihar8543012460-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASGAIL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9747171.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Gail India Limited

Office Name

East Block Mecon Building Doranda Ranchi

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 104 Items Sign in for GEM prices

#1

STUD A193 B7 NUT A194 2H 1 7 8x17 7 8IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,A193,B7,NUT,A194,2H,1 7/8x17 7/8IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

24 ea Delivery: 60 days
#2

STUD 3NUT A193 GRB7 A194 2H 1 7 8X15IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,3NUT,A193,GRB7,A194,2H,1 7/8X15IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

24 ea Delivery: 60 days
#3

STUD A193 B7 NUT A194 2H 1 1 4X10 1 4IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,A193,B7,NUT,A194,2H,1 1/4X10 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

36 ea Delivery: 60 days
#4

STUD NUT A193 B7 A194 2H 1 1 8X11 1 4IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,NUT,A193,B7,A194,2H,1 1/8X11 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

12 ea Delivery: 60 days
#5

STUD A193 GRB16 NUT A194 GR4 7 8x8IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,A193,GRB16,NUT,A194,GR4,7/8x8IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

48 ea Delivery: 60 days
#6

STUD AS A193 B7 NUT A194 2H 1X7IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,AS,A193,B7,NUT,A194,2H,1X7IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

48 ea Delivery: 60 days
#7

STUD NUT AS A193 B7 A194 2H 3 4x6IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,NUT,AS,A193-B7,A194-2H,3/4x6IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

48 ea Delivery: 60 days
#8

STUD 2NUT A320 GRL7 A194 GR4 3 4X6 1 8IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,2NUT,A320,GRL7,A194,GR4,3/4X6 1/8IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

48 ea Delivery: 60 days
#9

STUD AS A193 B7 NUT A194 2H 5 8X6IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,AS,A193,B7,NUT,A194,2H,5/8X6IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

48 ea Delivery: 60 days
#10

STUD A320 L7 NUT A194 GR 4 5 8X6 1 4IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,A320,L7,NUT,A194,GR.4,5/8X6 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

6 ea Delivery: 60 days
#11

STUD AS A193 B7 NUT A194 2H 1 2X4IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,AS,A193,B7,NUT,A194,2H,1/2X4IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

4 ea Delivery: 60 days
#12

STUD 2NUT A320 GRL7 A194 GR4 5 8X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,2NUT,A320,GRL7,A194,GR4,5/8X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

10 ea Delivery: 60 days
#13

STUD 2NUT A320 GRL7 A194 GR4 5 8X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,2NUT,A320,GRL7,A194,GR4,5/8X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

13 ea Delivery: 60 days
#14

STUD CS A320 L7 NUT A194 GR4 3 4X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Barauni

STUD,CS,A320,L7,NUT,A194,GR4,3/4X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Barauni

4 ea Delivery: 60 days
#15

STUD 2NUT A193 B7 A194 2H 5 8X3 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,2NUT,A193,B7,A194,2H,5/8X3 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#16

STUD A193 B7 NUT A194 2H 5 8X4 1 4IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,A193,B7,NUT,A194,2H,5/8X4 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#17

STUD AS A193 B7 NUT A194 2H 5 8X5 1 4IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,5/8X5 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#18

STUD AS A193 B7 NUT A194 2H 5 8X6IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,5/8X6IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#19

STUD AS A193 B7 NUT A194 2H 7 8X5 1 4IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,7/8X5 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#20

STUD A193 B7 NUT A194 2H 5 8X4 1 4IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,A193,B7,NUT,A194,2H,5/8X4 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#21

STUD AS A193 B7 NUT A194 2H 5 8X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,5/8X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

48 ea Delivery: 60 days
#22

BOLT NUT AS A193 B7 A194 2H 3 4X6IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

BOLT,NUT,AS,A193,B7,A194,2H,3/4X6IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

10 ea Delivery: 60 days
#23

STUD AS A193 B7 NUT A194 2H 7 8x7IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,7/8x7IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#24

STUD AS A193 B7 NUT A194 2H 7 8X7 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,7/8X7 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

8 ea Delivery: 60 days
#25

STUD AS A193 B7 NUT A194 2H 1X8IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,1X8IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

12 ea Delivery: 60 days
#26

STUD A193 B7 NUT A194 2H 1 1 4X9 3 4IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,A193,B7,NUT,A194,2H,1 1/4X9 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

28 ea Delivery: 60 days
#27

STUD A193 B7 NUT A194 2H 1 1 8x11 IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,A193,B7,NUT,A194,2H,1 1/8x11 IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

12 ea Delivery: 60 days
#28

STUD A193 B7 NUT A194 2H 1 1 4X9 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,A193,B7,NUT,A194,2H,1 1/4X9 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

20 ea Delivery: 60 days
#29

STUD AS A193 GRB7 A194 2H 1 1 4X11 3 4 Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,GRB7,A194,2H,1 1/4X11 3/4, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

20 ea Delivery: 60 days
#30

STUD AS A193 B7 NUT A194 2H 1 1 4X11IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,AS,A193,B7,NUT,A194,2H,1 1/4X11IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

20 ea Delivery: 60 days
#31

STUD 3NUT A193 B16 A194 4 1 5 8x13 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,3NUT,A193,B16,A194,4,1 5/8x13 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

20 ea Delivery: 60 days
#32

STUD 3NUT A193 B7 A194 2H 1 5 8X15 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gorakhpur

STUD,3NUT,A193,B7,A194 2H,1 5/8X15 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gorakhpur

20 ea Delivery: 60 days
#33

STUD 2NUT A193 B7 A194 2H 5 8X3 1 2IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,2NUT,A193,B7,A194,2H,5/8X3 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

40 ea Delivery: 60 days
#34

STUD AS A193 B7 NUT A194 2H 5 8X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,AS,A193,B7,NUT,A194,2H,5/8X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

40 ea Delivery: 60 days
#35

STUD A193 B7 NUT A194 2H 3 4X4 1 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,3/4X4 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

32 ea Delivery: 60 days
#36

STUD A193 B7 NUT A194 2H 0 75X4 75IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,0.75X4.75IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

32 ea Delivery: 60 days
#37

STUD A193 B7 NUT A194 2H 3 4X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,3/4X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

32 ea Delivery: 60 days
#38

STUD A193 B7 NUT A194 2H 7 8X4 3 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,7/8X4 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

24 ea Delivery: 60 days
#39

STUD AS A193 B7 NUT A194 2H 7 8X6IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,AS,A193,B7,NUT,A194,2H,7/8X6IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

48 ea Delivery: 60 days
#40

STUD AS A193 B7 NUT A194 2H 7 8X7 1 2IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,AS,A193,B7,NUT,A194,2H,7/8X7 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

24 ea Delivery: 60 days
#41

STUD AS A193 B7 NUT A194 2H 1X7 3 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,AS,A193,B7,NUT,A194,2H,1X7 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

24 ea Delivery: 60 days
#42

STUD A193 B7 NUT A194 2H 1 1 4X9 3 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,1 1/4X9 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

24 ea Delivery: 60 days
#43

STUD A193 B7 NUT A194 2H 1 1 8X9 1 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,1 1/8X9 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

12 ea Delivery: 60 days
#44

STUD NUT A193 B7 A194 2H 1 1 8X11 1 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,NUT,A193,B7,A194,2H,1 1/8X11 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

12 ea Delivery: 60 days
#45

STUD 3NUT A193 B7 A194 2H 1 1 4X9 3 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,3NUT,A193,B7,A194 2H,1 1/4X9 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

20 ea Delivery: 60 days
#46

STUD A193 B7 NUT A194 2H 1 1 4X10 1 4IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,A193,B7,NUT,A194,2H,1 1/4X10 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

20 ea Delivery: 60 days
#47

STUD 3NUT A193 B7 A194 2H 1 1 4X13IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,3NUT,A193,B7,A194,2H,1 1/4X13IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

20 ea Delivery: 60 days
#48

STUD 3NUT A320 GRL7 A194 GR4 1 7 8X20IN Bolt with two nuts As per SOW and SCC For Gail Patna

STUD,3NUT,A320,GRL7,A194,GR4,1 7/8X20IN, Bolt with two nuts, As per SOW and SCC For Gail Patna

24 ea Delivery: 60 days
#49

STUD A320 L7 NUT A194 GR 4 1 2X3 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,1/2X3 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

4 ea Delivery: 60 days
#50

STUD AS A193 B7 NUT A194 2H 5 8X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,AS,A193,B7,NUT,A194,2H,5/8X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

20 ea Delivery: 60 days
#51

STUD AS A193 B7 NUT A194 2H 5 8X4 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,AS,A193,B7,NUT,A194,2H,5/8X4 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#52

STUD AS A193 B7 NUT A194 2H 5 8X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,AS,A193,B7,NUT,A194,2H,5/8X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

13 ea Delivery: 60 days
#53

STUD 2NUT A320 GRL7 A194 GR4 5 8X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,2NUT,A320,GRL7,A194,GR4,5/8X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

42 ea Delivery: 60 days
#54

STUD A320 L7 NUT A194 GR4 5 8X4 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR4,5/8X4 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

9 ea Delivery: 60 days
#55

STUD A320 L7 NUT A194 GR 4 5 8X4 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,5/8X4 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#56

STUD A320 L7 NUT A194 GR 4 5 8X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,5/8X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

26 ea Delivery: 60 days
#57

STUD A320 L7 NUT A194 GR 4 5 8X5IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,5/8X5IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#58

STUD A320 L7 NUT A194 GR4 5 8X3 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR4,5/8X3 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#59

STUD A320 L7 NUT A194 GR 4 5 8X4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,5/8X4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#60

STUD A193 B7 NUT A194 2H 3 4X5 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A193,B7,NUT,A194,2H,3/4X5 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

27 ea Delivery: 60 days
#61

STUD AS A193 B7 NUT A194 2H 3 4X5 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,AS,A193,B7,NUT,A194,2H,3/4X5 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

4 ea Delivery: 60 days
#62

STUD A193 B7 NUT A194 2H 3 4X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A193,B7,NUT,A194,2H,3/4X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

10 ea Delivery: 60 days
#63

STUD CS A320 L7 NUT A194 GR4 3 4X5 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,CS,A320,L7,NUT,A194,GR4,3/4X5 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

16 ea Delivery: 60 days
#64

STUD CS A320 L7 NUT A194 4 3 4X7 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,CS,A320,L7,NUT,A194,4,3/4X7 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

12 ea Delivery: 60 days
#65

STUD A320 L7 NUT A194 GR 4 3 4X5 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,3/4X5 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

29 ea Delivery: 60 days
#66

STUD CS A320 L7 NUT A194 GR4 3 4X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,CS,A320,L7,NUT,A194,GR4,3/4X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

11 ea Delivery: 60 days
#67

STUD A320 L7 NUT A194 GR 4 7 8X6 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A320,L7,NUT,A194,GR.4,7/8X6 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

10 ea Delivery: 60 days
#68

STUD 2NUT A320 GRL7 A194 GR4 3 4X5 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,2NUT,A320,GRL7,A194,GR4,3/4X5 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#69

STUD 2NUT A320 GRL7 A194 GR4 3 4X4 3 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,2NUT,A320,GRL7,A194,GR4,3/4X4 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#70

STUD A193 B7 NUT A194 2H 7 8x6 1 2IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A193,B7,NUT,A194,2H,7/8x6 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

8 ea Delivery: 60 days
#71

STUD A193 B7 NUT A194 2H 7 8X8 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A193,B7,NUT,A194,2H,7/8X8 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

26 ea Delivery: 60 days
#72

STUD 3NUT A193 B16 A194 4 1 1 4x14 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,3NUT,A193,B16,A194,4,1 1/4x14 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

20 ea Delivery: 60 days
#73

STUD AS A193 GRB7 A194 2H 1 1 4X10 3 4 Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,AS,A193,GRB7,A194,2H,1 1/4X10 3/4, Bolt with two nuts, As per SOW and SCC For Gail Purnia

20 ea Delivery: 60 days
#74

STUD AS A193B7 2NUT A194 2H 1 X 8 IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,AS,A193B7,2NUT,A194 2H,1 X 8 IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

12 ea Delivery: 60 days
#75

STUD A193B7 2NUT A194 2H 1 1 4X11 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A193B7,2NUT,A194 2H,1 1/4X11 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

20 ea Delivery: 60 days
#76

STUD A193 B7 NUT A194 2H 1 1 8X9 1 4IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,A193,B7,NUT,A194,2H,1 1/8X9 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

12 ea Delivery: 60 days
#77

STUD 3NUT A193 B7 A194 2H 1 7 8X17 5 8IN Bolt with two nuts As per SOW and SCC For Gail Purnia

STUD,3NUT,A193,B7,A194 2H,1 7/8X17 5/8IN, Bolt with two nuts, As per SOW and SCC For Gail Purnia

24 ea Delivery: 60 days
#78

BOLT HEX A320 L7 NUT A194 GR4 5 8 IN X70 MM Hex Bolt with two nuts As per SOW and SCC For Gail Purnia

BOLT,HEX,A320,L7, NUT, A194,GR4, 5/8 IN X70 MM, Hex Bolt with two nuts, As per SOW and SCC For Gail Purnia

64 ea Delivery: 60 days
#79

STUD 3NUT A193 B7 A194 2H 2X20 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,3NUT,A193,B7,A194,2H,2X20 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

28 ea Delivery: 60 days
#80

STUD A193 B7 NUT A194 2H 1 7 8x16IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,A193,B7,NUT,A194,2H,1 7/8x16IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

24 ea Delivery: 60 days
#81

STUD 3NUT A193 B7 A194 2H 1 1 2X13IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,3NUT,A193,B7,A194 2H,1 1/2X13IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

20 ea Delivery: 60 days
#82

STUD 3NUT A193 B7 A194 2H 1 1 4X11 3 4IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,3NUT,A193,B7,A194 2H,1 1/4X11 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

20 ea Delivery: 60 days
#83

STUD 3NUT A193 B7 A194 2H 1 1 4X9IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,3NUT,A193,B7,A194 2H,1 1/4X9IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

16 ea Delivery: 60 days
#84

STUD AS A193 B7 NUT A194 2H 1 1 8X8IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,AS,A193,B7,NUT,A194,2H,1 1/8X8IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

12 ea Delivery: 60 days
#85

STUD AS A193 B7 NUT A194 2H 7 8X6IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,AS,A193,B7,NUT,A194,2H,7/8X6IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

16 ea Delivery: 60 days
#86

STUD AS A193 B7 NUT A194 2H 5 8X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Gaya

STUD,AS,A193,B7,NUT,A194,2H,5/8X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Gaya

32 ea Delivery: 60 days
#87

STUD 3NUT A193 B7 A194 2H 2X20 1 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,3NUT,A193,B7,A194,2H,2X20 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

28 ea Delivery: 60 days
#88

STUD A193 B7 NUT A194 2H 1 7 8x13 3 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A193,B7,NUT,A194,2H,1 7/8x13 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

24 ea Delivery: 60 days
#89

STUD A193 B7 NUT A194 2H 1 5 8X12IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A193,B7,NUT,A194,2H,1 5/8X12IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

24 ea Delivery: 60 days
#90

STUD A193 B7 NUT A194 2H 1 1 4X9 1 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A193,B7,NUT,A194,2H,1 1/4X9 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

20 ea Delivery: 60 days
#91

STUD A193 B7 NUT A194 2H 1 1 4X9 1 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A193,B7,NUT,A194,2H,1 1/4X9 1/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

20 ea Delivery: 60 days
#92

STUD AS A193 GRB7 A194 2H 1 1 4X10 3 4 Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,AS,A193,GRB7,A194,2H,1 1/4X10 3/4, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

20 ea Delivery: 60 days
#93

STUD 3NUT A320 GRL7 A194 GR4 1 1 4X9 1 4 Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,3NUT,A320,GRL7,A194,GR4,1 1/4X9 1/4, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

20 ea Delivery: 60 days
#94

STUD A320 L7 NUT A194 GR 4 1 1 4X10 3 4 Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A320,L7,NUT,A194,GR.4,1 1/4X10 3/4, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

20 ea Delivery: 60 days
#95

STUD NUT AS A193 B7 A194 2H 1 2X7 1 2IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,NUT,AS,A193-B7,A194-2H,1/2X7 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

4 ea Delivery: 60 days
#96

STUD NUT AS A193 B7 A194 2H 1 2X7 1 2IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,NUT,AS,A193-B7,A194-2H,1/2X7 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

32 ea Delivery: 60 days
#97

STUD AS A193 B7 NUT A194 2H 5 8X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,AS,A193,B7,NUT,A194,2H,5/8X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

11 ea Delivery: 60 days
#98

STUD A320 L7 NUT A194 GR 4 5 8X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A320,L7,NUT,A194,GR.4,5/8X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

25 ea Delivery: 60 days
#99

STUD A320 L7 NUT A194 GR 4 5 8X5IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A320,L7,NUT,A194,GR.4,5/8X5IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

9 ea Delivery: 60 days
#100

STUD 2NUT A320 GRL7 A194 GR4 5 8X3 3 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,2NUT,A320,GRL7,A194,GR4,5/8X3 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

8 ea Delivery: 60 days
#101

STUD AS A193 B7 NUT A194 2H 5 8X3 3 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,AS,A193,B7,NUT,A194,2H,5/8X3 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

8 ea Delivery: 60 days
#102

STUD 2NUT A320 GRL7 A194 GR4 5 8X3 3 4IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,2NUT,A320,GRL7,A194,GR4,5/8X3 3/4IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

8 ea Delivery: 60 days
#103

STUD A193 L7 NUT A194 GR 8 3 4X4 1 2IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,A193,L7,NUT,A194,GR.8,3/4X4 1/2IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

8 ea Delivery: 60 days
#104

STUD AS A193 B7 NUT A194 2H 7 8x7IN Bolt with two nuts As per SOW and SCC For Gail Varanasi

STUD,AS,A193,B7,NUT,A194,2H,7/8x7IN, Bolt with two nuts, As per SOW and SCC For Gail Varanasi

11 ea Delivery: 60 days

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data