TenderDekho Logo
Active GEM

Procurement Opportunity: Item 1,Item 2,Item 3,Item 4,Item 5,Item 6,Item 7,Item 8,Item 9,Item 10 in GOLAGHAT, ASSAM

Bid Publish Date

16-Oct-2026, 4:44 pm

Bid End Date

30-Oct-2026, 1:00 pm

Location

GOLAGHAT , ASSAM

Progress

Issue16-Oct-2026, 4:44 pm
AwardPending

A tender has been published for Numaligarh Refinery Limited Item 1, Item 2, Item 3, Item 4, Item 5, Item 6, Item 7, Item 8, Item 9, Item 10 in GOLAGHAT, ASSAM. Quantity: 46 by. Submission Deadline: 30-10-2026 13: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

46

Category

Item 1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Item 1 , Item 2 , Item 3 , Item 4 , Item 5 , Item 6 , Item 7 , Item 8 , Item 9 , Item 10

Advisory Bank

AXIS BANK LTD

ePBG Percentage

3%

ePBG Duration (Months)

39

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

23-10-2026 15:00:00

Pre-Bid Venue

Online Via Teams meeting. Bidders are requested to forward their queries and participation request to [email protected] 24 Hrs. prior to the pre bid meeting date.

Delivery Details

Max Delivery Days

168

Delivery Locations

1

Delivery Cities

Golaghat

Delivery Pincodes

785699

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dibakar Barhoi785699,Numaligarh Refinery Limited, Chief General Manager (Commercial) PO-NRP, Numaligarh Warehouse office 03776-265562GolaghatAssam78569930168-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASNUMALIGARH REFINERY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10044650.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Numaligarh Refinery Limited

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Item 1

Wireless Ultrasonic Thickness or Corrosion Monitoring Sensors complete with clamps, batteries, temperature compensation and all mounting accessories as applicable as per tender technical specification

30 no Delivery: 168 days
#2

Item 2

Wireless Gateway complete as applicable as per tender technical specification

1 lot Delivery: 168 days
#3

Item 3

Wireless Repeater complete as applicable as per tender technical specification

1 lot Delivery: 168 days
#4

Item 4

Remote Antenna complete with mounting brackets, lightning protection, communication cables and accessories as applicable as per tender technical specification

1 lot Delivery: 168 days
#5

Item 5

Industrial Server or Workstation complete with Licensed Corrosion Monitoring Software, Historian Database, Viewer Licenses, OPC or LAN Integration and Software Media as applicable as per tender technical specification

1 ls Delivery: 168 days
#6

Item 6

Site Survey, Detailed Engineering, Wireless Network Design, Drawings, Documentation and System Configuration as as applicable per tender technical specification

1 ls Delivery: 168 days
#7

Item 7

Communication Cables, Junction Boxes, Mounting Hardware, Supports, SS Fasteners and Installation Accessories incl. cable glands, terminations and miscellaneous installation consumables as applicable as per tender technical specification

1 ls Delivery: 168 days
#8

Item 8

Installation, Cabling, Termination, Loop Checking, Testing, Commissioning and Factory Acceptance Test or Site Acceptance Test as applicable as per tender technical specification.

1 ls Delivery: 242 days
#9

Item 9

Training, Operation & Maintenance Manuals, Diagnostic or Configuration Software, Tools and Maintenance Toolkit as applicable as per tender technical specification

1 ls Delivery: 270 days
#10

Item 10

Warranty Support for 24 Months including Quarterly Preventive Visits, Technical Support and Software Support as applicable per tender technical specification

8 vst Delivery: 1,095 days

Categories 47

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement