Progress
N/a has released a public tender for Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) in PUNE, MAHARASHTRA. Quantity: 1. Submission Deadline: 17-05-2025 18: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
OEM Avg. Turnover
1
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about MAHARASHTRA tender market
The eligibility requirements include being a registered entity, compliance with IS 1475 standards, and possessing necessary certifications that attest to the bidder's capability in supplying Self-Contained Drinking Water Coolers. Bidders are also required to demonstrate their financial stability through valid financial statements.
The technical specifications for the water coolers include energy-efficient designs and performance standards that comply with IS 1475. Bidders must also meet the quality assurance protocols set forth by the issuing authority, ensuring the coolers maintain appropriate water temperature and functionality.
The Earnest Money Deposit (EMD) requirements will typically be outlined in the tender document. Bidders must prepare to submit a specified amount as an EMD to demonstrate commitment and seriousness in their proposal. This amount may vary, and terms for its refund or forfeiture in case of compliance failures are usually included in the conditions.
Documents should be submitted through the designated online e-procurement portal. Submissions must adhere to provided specifications regarding file formats and structure. Bidders must ensure all documents are complete, correctly submitted by the deadline, and in compliance with the requirements stated in the tender.
Yes, there are several benefits for MSEs such as potential relaxation in eligibility criteria, reduced documentation, and preferences in the evaluation process to encourage local suppliers and startups. Compliance with 'Make in India' initiatives can also provide MSEs with added advantages in their proposals.