Progress
The Institute Of Advanced Study In Science And Technology (IASST) of the Department Of Science And Technology invites procurement for a Nanofibrous Material Fabrication System, specifically an Electrospinning unit, to support advanced research in Kamrup, Assam. The tender covers Supply, Installation, Testing, Commissioning, and training of operators, with statutory clearances if any. The buyer reserves the right to adjust quantities by up to 25%, and to extend delivery timelines accordingly. The documented EMD amount is ₹27,500, indicating a modest but formal bid security. The procurement emphasizes a turnkey approach, including on-site setup and operator training to ensure immediate operability after delivery. The project scope highlights a single, integrated electrospinning solution rather than multiple smaller lots, and emphasizes compliance with any local statutory clearances if required. Unique terms include a flexible quantity clause and a total-cost bid that must include all components of supply and service.
No technical specifications are provided in the tender data. However, the scope indicates a complete Nanofibrous Material Fabrication System (Electrospun unit) with on-site installation, commissioning, and operator training. Bidders should anticipate requirements around system integration, basic electrical compatibility, and software interfaces for process control. The lack of BOQ items suggests that the key evaluation criterion will be conformity to standard electrospinning equipment capabilities, vendor qualifications, and the ability to deliver within the extended delivery framework described in the ATC terms. Prepare for a turnkey deployment with installation support and training.
Key terms include an 25% quantity flexibility during contract placement and possible 25% variation during currency at contracted rates. Delivery period begins after the last original delivery order date; additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The contract requires supply, installation, testing, commissioning, operator training, and statutory clearances if applicable. Ensure readiness of bid security (₹27,500 EMD), compliance with ATC scope, and capability to execute a turnkey electrospinning system deployment with post-installation support.
Product/service names: Nanofibrous Material Fabrication System (Electrospinning unit)
Quantity: Not specified (subject to ±25% quantity variation during contract)
Estimated value: Not disclosed
Standards/Certification: Not specified in data; assume ISI/ISO compliance typical for lab equipment
Delivery/Installation: Turnkey deployment including on-site installation and operator training
Warranty/Support: Not specified
EMD: ₹27,500 security deposit required
Delivery: Extended delivery time possible with 30-day minimum
Scope: Supply, installation, testing, commissioning, operator training, and any required statutory clearances
Quantity: Purchaser may adjust by ±25% at contract and during currency
Not specified in data; bidders should confirm payment schedule within ATC terms and ensure alignment to turnkey delivery
Delivery period may be extended based on option clause; minimum extension time 30 days
Not specified; term to be clarified in ATC or contract
Experience in supplying and deploying electrospinning systems or nanofiber fabrication equipment
Financial capability to undertake turnkey deployment
Compliance with statutory and regulatory requirements for lab equipment installation
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Nanofibrous Material Fabrication System (Electrospin unit)
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
14
Max Delivery Days
65
Delivery Locations
1
Delivery Cities
Kamrup Metro
Delivery Pincodes
781035
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajesh Sharma | 781035,IASST, Vigyan Path, Paschim Boragaon, Guwahati, Assam | Kamrup Metro | Assam | 781035 | 1 | 65 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar electrospinning or nanofiber fabrication equipment deployments
Financial statements or solvency proof for bidder
EMD deposit proof of ₹27,500
Technical bid documents demonstrating electrospinning system capabilities
OEM authorizations or manufacturer’s credentials for electrospinning equipment
Any statutory clearances or compliance certificates if applicable
Key insights about ASSAM tender market
Prepare a turnkey bid covering supply, installation, testing, commissioning, and operator training. Ensure ₹27,500 EMD is paid and documented. Submit OEM authorizations, experience certificates for similar deployments, GST and PAN, and financial statements. ATC terms govern quantity variation up to 25% and potential extended delivery periods with minimum 30 days.
Bidder must submit GST certificate, PAN, experience certificates for electrospinning equipment, financial statements, EMD proof of ₹27,500, technical bid detailing system capabilities, and OEM authorization. Include statutory clearance documents if applicable and a turnkey deployment plan with installation and training details.
Delivery may be extended under the option clause; additional time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Delivery starts from the last date of the original delivery order; ensure on-site installation and operator training as part of scope.
EMD amount is ₹27,500. The bid must include this amount as security deposit and provide proof of payment with the bid submission. The contract price is not disclosed; the bid should reflect turnkey supply and installation costs plus training.
The tender data does not specify exact standards. bidders should assume lab equipment compliance and include ISO/IEC/industry certifications where applicable, plus OEM authorization. Clarify any ISI/IS standards in the technical proposal and ensure compatibility with local regulatory requirements.
The purchaser may increase/decrease quantity by up to 25% at contract placement and during currency. Bidders should price scalable equipment and ensure installation readiness for expanded/contracted volumes, with delivery time recalibrations per the extended period formula.
Scope includes Supply, Installation, Testing, Commissioning of the electrospinning unit, and Training of operators. Also covers any required Statutory Clearances. Prepare for a turnkey package with on-site setup, calibration, and knowledge transfer to operators.