TenderDekho Logo
GEM

Bharatiya Rail Bijlee Company Limited Time Switch Tender Aurangabad Bihar ISO 9001:2015 Certified 2026

Bid Publish Date

28-Apr-2026, 5:53 pm

Bid End Date

01-May-2026, 6:00 pm

Progress

Issue28-Apr-2026, 5:53 pm
Technical30-04-2026 10:57:41
Financial
Award08-May-2026, 1:01 am
Explore all 4 tabs to view complete tender details

Quantity

50

Bid Type

Two Packet Bid

Categories 3

Tender Overview

Organization: Bharatiya Rail Bijlee Company Limited. Procurement: Time Switch hardware. Location: Aurangabad, Bihar - 824101. Estimated value and exact quantity are not disclosed; tender emphasizes ISO quality standards and a 25% quantity variation option. Tender scope centers on safe, standards-compliant time switch components for railway signaling/operations. Unique terms include an option clause enabling 25% quantity adjustments at contracted rates, with delivery period adjustments tied to the original schedule. This procurement targets vendors capable of meeting formal ISO certification requirements and delivering compliant electrical/time-control devices within defined windows. The tender’s lack of BOQ items suggests a focused specification rather than bulk lump-sum purchase, with emphasis on quality assurance and supplier flexibility under the option clause.

Technical Specifications & Requirements

  • Product category: Time Switch hardware (electrical/control equipment) for railway usage
  • Standards/Certification: ISO certification (quality standards) required by manufacturer
  • Operating targets: Referenced operating voltage and frequency settings to be provided in supplier documentation
  • Quality context: Emphasis on ISO compliance; no BOQ itemization available, implying specification-driven submission
  • Delivery context: Delivery period tied to option clause; timeframes determined by contract and last/extended delivery order dates
  • Evidence & testing: Supplier must demonstrate ISO-based quality processes; specific test reports not provided in data

Terms, Conditions & Eligibility

  • Quantity variation: Purchaser may increase/decrease quantity up to 25% of bid/contracted quantity
  • Delivery timing: Extended delivery time logic: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Delivery period extension: May extend to original delivery period under option exercise
  • Compliance: Bidders must adhere to these option-term provisions
  • Documentation scope: No explicit dates or IDs; focus remains on ISO quality and option-based delivery terms

Key Specifications

    • Product/service names: Time Switch hardware for railway applications
    • Quantities/values: Not disclosed in BOQ; contingent on 25% variation clause
    • EMD/estimated value: Not specified in data; tender includes EMD requirement per terms
    • Category/type: Electrical control equipment with time-switch functionality
    • Quality/standards: ISO certification (quality standards) required
    • Delivery/installation: Delivery period governed by option clause; last date of original DO and extended period calculations
    • Experience: Experience in supplying railway-grade control equipment preferred

Terms & Conditions

  • Key Term 1: 25% quantity variation allowed during contract and currency

  • Key Term 2: Delivery period adjusts via calculated formula with minimum 30 days

  • Key Term 3: ISO quality certification mandatory for manufacturer or supplier

Important Clauses

Payment Terms

Not explicitly stated in provided data; standard practice would apply per contract terms with advance/ milestones post-delivery

Delivery Schedule

Delivery period begins from last date of original delivery order; extended period follows the option clause with calculated time based on quantity change

Penalties/Liquidated Damages

No explicit LD details in data; penalties typically align with delivery delays under contract terms

Bidder Eligibility

  • Must hold ISO quality certification (manufacturer or supplier) relevant to electrical control equipment

  • Experience in supplying railway-grade time-switch hardware or similar control devices

  • Demonstrate financial capability through standard financial documents

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Time Switch (Q4)

Authority Records

MINISTRY OF POWERBHARTIYA RAIL BIJLEE COMPANY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9268708.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Material Specifications Features 24 Hour Line Description, Permanent ON/AUTO/OFF, Set Switching Times
Specifications Operating Voltage 240.0
Specifications Frequency 50.0, 40.0
Test Report/Certification Manufacturer should have ISO certification for quality standards Yes, No

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar time-switch/railway electrical equipment

4

Financial statements or proof of financial standing

5

EMD/Security deposit documents (as required by terms)

6

Technical bid documents demonstrating ISO quality processes

7

OEM authorizations or manufacturer confirmations (where applicable)

Technical Results

S.No Seller Item Date Status
1
DASATVA INDIA PRIVATE LIMITED   Under PMA
Make : NA Model : GIC30-04-2026 10:57:41
2
G K ENTERPRISES   Under PMA
Make : NA Model : GIC01-05-2026 15:15:52
3
INDIA MOTOR STORES   Under PMA
Make : SELEC Model : TS2M128-04-2026 19:43:30
4
INSPIRE GLOBAL   Under PMA
Make : NA Model : NATURE SWITCH30-04-2026 17:22:33
5
JAY JAGADAMBA ENTERPRISES   Under PMA
Make : SELEC Model : TS2M1-1-16A-230V230-04-2026 20:30:22
6
JAYDEEP CONTROLS   Under PMA
Make : SKYLET Model : Time Switch29-04-2026 12:26:42
7
LAGENOLITH TECHNOLOGY PRIVATE LIMITED   Under PMA
Make : SELEC Model : TS2M1-1-16A-230V201-05-2026 15:48:51
8
M/s Sunita Associates   Under PMA
Make : NA Model : NATURE SWITCH01-05-2026 14:23:56
9
NUTAN INFOTECH INDUSTRIES   Under PMA
Make : SELEC Model : TS2M1-1-16A-230V201-05-2026 08:49:09

Financial Results

Rank Seller Price Item
L1
JAYDEEP CONTROLS(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Time Switch
L2
INDIA MOTOR STORES   Under PMA
Item Categories : Time Switch
L3
G K ENTERPRISES   Under PMA
Item Categories : Time Switch
L4
NUTAN INFOTECH INDUSTRIES   Under PMA
Item Categories : Time Switch
L5
INSPIRE GLOBAL   Under PMA
Item Categories : Time Switch
L6
LAGENOLITH TECHNOLOGY PRIVATE LIMITED   Under PMA
Item Categories : Time Switch
L7
DASATVA INDIA PRIVATE LIMITED   Under PMA
Item Categories : Time Switch
L8
JAY JAGADAMBA ENTERPRISES   Under PMA
Item Categories : Time Switch
L9
M/s Sunita Associates   Under PMA
Item Categories : Time Switch

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for the time switch tender in Aurangabad Bihar 2026?

To bid, submit the required documents (GST, PAN, experience certs, financial statements, EMD), provide ISO quality documentation, and satisfy the 25% quantity variation clause. Ensure compliance with delivery-term calculations and supplier registration with BRBCL for Aurangabad.

What documents are required for BRBCL time switch procurement in Bihar?

Required documents include GST registration, PAN, experience certificates for railway-grade equipment, financial statements, EMD/security deposit proofs, ISO quality certificates, and OEM authorizations where applicable. Ensure technical bid demonstrates ISO-compliant processes and relevant experience.

What standards and certifications are demanded for time switch equipment?

Manufacturers must hold ISO quality certification; scope includes time-switch hardware for railway use. Supplier documentation should prove ISO-compliant quality management systems and appropriate certification bodies; no IS-specific standard information was provided beyond ISO.

When is the delivery timeline for quantity variations under BRBCL tender?

Delivery timelines follow the option clause: new time equals (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Original and extended timelines depend on the last/extended delivery order dates.

What is the scope of quantity variation allowed in BRBCL tender?

The purchaser may adjust quantity by up to 25% of bid quantity at contract placement and during the contract currency at contracted rates. This flexibility requires acceptance of timing adjustments per clause calculations.

What documents are needed for ISO certification claims in this bid?

Submit the ISO certificate authority document, scope of certification (quality management system), and any auditable procedures demonstrating conformity to ISO standards relevant to electrical control equipment.