The National Fertilizers Limited (NFL) invites bids for the supply, installation, testing and commissioning of 11KV switchboards across multiple substations in Rupnagar, Punjab, including Water Works Substation, Sector4, Sector7, Admin Building, Workshop, and Lab areas. The scope also covers operator training and any required statutory clearances. Estimated quantity and total contract value are not disclosed, but the EMD is ₹100,000. The tender emphasizes delivery flexibility with a 25% quantity variation, and the delivery period is calculated from the last date of the original delivery order. This tender targets qualified bidders capable of turnkey execution under NFL procurement terms.
11KV switchboards for Water Works Substation and multiple Sector substations
Scope includes supply, installation, testing, commissioning and operator training
EMD: ₹100,000; delivery variation allowance up to 25%
EMD amount fixed at ₹100,000 with submission as per ATC.
Scope encompasses supply, installation, testing, commissioning and operator training.
25% quantity variation allowed; delivery period adjusted from the last date of order.
Proven experience in supplying and commissioning 11KV switchboards
Adequate financial capacity to mobilize across multiple substations
Compliance with applicable Indian electrical standards and OEM authorizations
Quantity
12
Category
11KV Switchboards for Water Works Substation 9VCB
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
11KV Switchboards for Water Works Substation 9VCB , Installation, testing , commissioning of 11KV Switchboards for Water Works Substation 09 VCB , 11KV Switchboards for Sector4 Substation , Installation, testing , commissioning of 11KV Switchboards for Sector4 Substation , 11KV Switchboards for Sector7 Substation , nstallation, testing , commissioning of 11KV Switchboards for Sector7 Substation. , 11KV Switchboards for Admin Building Substation , Installation, testing , commissioning of 11KV Switchboards for Admin Building Substation , 11KV Switchboards for Workshop area Substation , Installation, testing , commissioning of 11KV Switchboards for Workshop area Substation , 11KV Switchboards for Lab area Substation , Installation, testing , commissioning of 11KV Switchboards for Lab area Substation
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
21
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Rupnagar
Delivery Pincodes
140126
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jatinder Kumar Rajput | 140126,National Fertilizers Limited, Naya Nangal | Rupnagar | Punjab | 140126 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
11KV Switchboards for Water Works Substation 9VCB
As per ATC
Installation, testing , commissioning of 11KV Switchboards for Water Works Substation 09 VCB
As per ATC
11KV Switchboards for Sector4 Substation
As per ATC
Installation, testing , commissioning of 11KV Switchboards for Sector4 Substation
As per ATC
11KV Switchboards for Sector7 Substation
As per ATC
nstallation, testing , commissioning of 11KV Switchboards for Sector7 Substation.
As per ATC
11KV Switchboards for Admin Building Substation
As per ATC
Installation, testing , commissioning of 11KV Switchboards for Admin Building Substation
As per ATC
11KV Switchboards for Workshop area Substation
As per ATC
Installation, testing , commissioning of 11KV Switchboards for Workshop area Substation
As per ATC
11KV Switchboards for Lab area Substation
As per ATC
Installation, testing , commissioning of 11KV Switchboards for Lab area Substation
As per ATC
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 11KV Switchboards for Water Works Substation 9VCB | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 2 | Installation, testing , commissioning of 11KV Switchboards for Water Works Substation 09 VCB | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 3 | 11KV Switchboards for Sector4 Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 4 | Installation, testing , commissioning of 11KV Switchboards for Sector4 Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 5 | 11KV Switchboards for Sector7 Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 6 | nstallation, testing , commissioning of 11KV Switchboards for Sector7 Substation. | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 7 | 11KV Switchboards for Admin Building Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 8 | Installation, testing , commissioning of 11KV Switchboards for Admin Building Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 9 | 11KV Switchboards for Workshop area Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 10 | Installation, testing , commissioning of 11KV Switchboards for Workshop area Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 11 | 11KV Switchboards for Lab area Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 | |
| 12 | Installation, testing , commissioning of 11KV Switchboards for Lab area Substation | As per ATC | 1 | set | buyer13.nfln.pb | 120 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar 11KV switchboard projects
Financial statements / turnover evidence
EMD payment receipt or bank guarantee
Technical bid documents demonstrating compliance
OEM authorizations / manufacturer certificates for switchgear
Any statutory clearance documents applicable
Key insights about PUNJAB tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD ₹100,000, OEM authorizations, and technical bid documents. Ensure compliance with ATC terms, including the 25% variation option and training requirements. Delivery must align with original order dates, with extensions through the option clause.
Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD submission details, OEM authorization, and technical compliance certificates. Upload all certificates as per bid document and ATC; incomplete submissions lead to rejection.
Delivery terms permit up to 25% quantity variation. Payment terms are as per ATC; bidders should verify startup/MSE benefits in the attached ATC documents. Delivery periods start from the last date of the original delivery order and may extend with the option clause.
Bidders must provide technical compliance certificates and OEM authorizations for the 11KV switchgear. While IS standards are not specified in the data, ensure ISO/IEC or BIS/ISI certificates as applicable per ATC and project scope.
The scope includes Water Works Substation, Sector4 Substation, Sector7 Substation, Admin Building Substation, Workshop area Substation, and Lab area Substation, with installation, testing and commissioning of 11KV switchboards at each location.
The Earnest Money Deposit (EMD) amount is ₹₹100,000. Ensure payment is completed through the prescribed channel and include EMD details with the bid submission to avoid disqualification.
Check the ATC for MSE/Startup policy; eligible bidders may receive benefits except for experience and turnover requirements. Prepare relevant certification and status documentation, and submit alongside mandatory bid documents for consideration.
Scope includes supply of 11KV switchboards, installation, testing, commissioning, and operator training, plus any necessary statutory clearances. The bid must cover all associated costs; delivery is contingent on the contract terms and order dates.