TenderDekho Logo
Active GEM

National Fertilizers Limited 11KV Switchboards Tender Rupnagar Punjab 2026 - Installation, Testing, Commissioning

Bid Publish Date

25-Sep-2026, 3:08 pm

Bid End Date

16-Oct-2026, 11:00 am

EMD

₹1,00,000

Progress

Issue25-Sep-2026, 3:08 pm
AwardPending

Tender Overview

The National Fertilizers Limited (NFL) invites bids for the supply, installation, testing and commissioning of 11KV switchboards across multiple substations in Rupnagar, Punjab, including Water Works Substation, Sector4, Sector7, Admin Building, Workshop, and Lab areas. The scope also covers operator training and any required statutory clearances. Estimated quantity and total contract value are not disclosed, but the EMD is ₹100,000. The tender emphasizes delivery flexibility with a 25% quantity variation, and the delivery period is calculated from the last date of the original delivery order. This tender targets qualified bidders capable of turnkey execution under NFL procurement terms.

Technical Specifications & Requirements

  • Product: 11KV switchboards for multiple substations (Water Works, Sector4, Sector7, Admin Building, Workshop, Lab).
  • Scope: Supply, Installation, Testing, Commissioning plus operator training; statutory clearances if required.
  • EMD: ₹100,000; payment terms per ATC; qualifications must include uploaded certificates.
  • Delivery terms: option to increase quantity by up to 25%; additional time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
  • Documentation: compliance certificates, OEM authorizations, and all bid documents must be uploaded.
  • ATC: Startups/MSE benefits may extend to eligible bidders except for turnover/experience thresholds.
  • No explicit product specifications provided; bidders must rely on BOQ and organization terms.

Terms & Eligibility

  • EMD: ₹100,000 issued as per tender terms.
  • Scope: turnkey execution including training and statutory clearances.
  • Delivery: flexible with 25% quantity variation; delivery period linked to original delivery order.
  • Payment: terms defined in ATC; compliance with MSE/Startup benefits as attached, subject to conditions.
  • Certificates: mandatory certificates/documents to be uploaded; non-submission leads to rejection.
  • Eligibility: adherence to terms in ATC, OEM authorization, and technical compliance.

Key Specifications

  • 11KV switchboards for Water Works Substation and multiple Sector substations

  • Scope includes supply, installation, testing, commissioning and operator training

  • EMD: ₹100,000; delivery variation allowance up to 25%

Terms & Conditions

  • EMD amount fixed at ₹100,000 with submission as per ATC.

  • Scope encompasses supply, installation, testing, commissioning and operator training.

  • 25% quantity variation allowed; delivery period adjusted from the last date of order.

Bidder Eligibility

  • Proven experience in supplying and commissioning 11KV switchboards

  • Adequate financial capacity to mobilize across multiple substations

  • Compliance with applicable Indian electrical standards and OEM authorizations

Advertisement

Tender Data

Bid Details

Quantity

12

Category

11KV Switchboards for Water Works Substation 9VCB

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

11KV Switchboards for Water Works Substation 9VCB , Installation, testing , commissioning of 11KV Switchboards for Water Works Substation 09 VCB , 11KV Switchboards for Sector4 Substation , Installation, testing , commissioning of 11KV Switchboards for Sector4 Substation , 11KV Switchboards for Sector7 Substation , nstallation, testing , commissioning of 11KV Switchboards for Sector7 Substation. , 11KV Switchboards for Admin Building Substation , Installation, testing , commissioning of 11KV Switchboards for Admin Building Substation , 11KV Switchboards for Workshop area Substation , Installation, testing , commissioning of 11KV Switchboards for Workshop area Substation , 11KV Switchboards for Lab area Substation , Installation, testing , commissioning of 11KV Switchboards for Lab area Substation

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

21

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Rupnagar

Delivery Pincodes

140126

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Jatinder Kumar Rajput140126,National Fertilizers Limited, Naya NangalRupnagarPunjab1401261120-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENTNATIONAL FERTILIZERS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9944976.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Punjab Naya Nangal

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

11KV Switchboards for Water Works Substation 9VCB

As per ATC

1 set Delivery: 120 days
#2

Installation, testing , commissioning of 11KV Switchboards for Water Works Substation 09 VCB

As per ATC

1 set Delivery: 120 days
#3

11KV Switchboards for Sector4 Substation

As per ATC

1 set Delivery: 120 days
#4

Installation, testing , commissioning of 11KV Switchboards for Sector4 Substation

As per ATC

1 set Delivery: 120 days
#5

11KV Switchboards for Sector7 Substation

As per ATC

1 set Delivery: 120 days
#6

nstallation, testing , commissioning of 11KV Switchboards for Sector7 Substation.

As per ATC

1 set Delivery: 120 days
#7

11KV Switchboards for Admin Building Substation

As per ATC

1 set Delivery: 120 days
#8

Installation, testing , commissioning of 11KV Switchboards for Admin Building Substation

As per ATC

1 set Delivery: 120 days
#9

11KV Switchboards for Workshop area Substation

As per ATC

1 set Delivery: 120 days
#10

Installation, testing , commissioning of 11KV Switchboards for Workshop area Substation

As per ATC

1 set Delivery: 120 days
#11

11KV Switchboards for Lab area Substation

As per ATC

1 set Delivery: 120 days
#12

Installation, testing , commissioning of 11KV Switchboards for Lab area Substation

As per ATC

1 set Delivery: 120 days
Advertisement

Categories 10

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar 11KV switchboard projects

4

Financial statements / turnover evidence

5

EMD payment receipt or bank guarantee

6

Technical bid documents demonstrating compliance

7

OEM authorizations / manufacturer certificates for switchgear

8

Any statutory clearance documents applicable

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for the 11KV switchboards tender in Rupnagar Punjab NFL 2026

Bidders must submit GST, PAN, experience certificates, financial statements, EMD ₹100,000, OEM authorizations, and technical bid documents. Ensure compliance with ATC terms, including the 25% variation option and training requirements. Delivery must align with original order dates, with extensions through the option clause.

What documents are required for NFL Rupnagar 11KV switchboards bid 2026

Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD submission details, OEM authorization, and technical compliance certificates. Upload all certificates as per bid document and ATC; incomplete submissions lead to rejection.

What are the delivery and payment terms for NFL 11KV switchboard tender

Delivery terms permit up to 25% quantity variation. Payment terms are as per ATC; bidders should verify startup/MSE benefits in the attached ATC documents. Delivery periods start from the last date of the original delivery order and may extend with the option clause.

What certifications are expected for 11KV switchboard installation bids in Punjab

Bidders must provide technical compliance certificates and OEM authorizations for the 11KV switchgear. While IS standards are not specified in the data, ensure ISO/IEC or BIS/ISI certificates as applicable per ATC and project scope.

Which substations are included in the NFL Rupnagar switchboard project 2026

The scope includes Water Works Substation, Sector4 Substation, Sector7 Substation, Admin Building Substation, Workshop area Substation, and Lab area Substation, with installation, testing and commissioning of 11KV switchboards at each location.

What is the EMD amount for NFL switchboard procurement 2026

The Earnest Money Deposit (EMD) amount is ₹₹100,000. Ensure payment is completed through the prescribed channel and include EMD details with the bid submission to avoid disqualification.

How to ensure eligibility for MSE/Startup benefits in NFL bid

Check the ATC for MSE/Startup policy; eligible bidders may receive benefits except for experience and turnover requirements. Prepare relevant certification and status documentation, and submit alongside mandatory bid documents for consideration.

What is the scope of supply for NFL 11KV switchboards tender

Scope includes supply of 11KV switchboards, installation, testing, commissioning, and operator training, plus any necessary statutory clearances. The bid must cover all associated costs; delivery is contingent on the contract terms and order dates.

Advertisement