TenderDekho Logo
Closed GEM

Invitation to Bid - Fuel Cut Off Solenoid Valve,Wind Shield Glass,Dvr Co Dvr Side Rear view mirror,Rotary Switch,Clutch in SOUTH WEST DELHI, DELHI

Bid Publish Date

22-Sep-2025, 3:40 pm

Bid End Date

03-Oct-2025, 4:00 pm

Progress

Issue22-Sep-2025, 3:40 pm
Technical27-09-2025 12:11:00
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

71

Category

Fuel Cut Off Solenoid Valve

Bid Type

Two Packet Bid

Categories 53

Indian Army announces a tender for Fuel Cut Off Solenoid Valve, Wind Shield Glass, Dvr Co Dvr Side Rear view mirror, Rotary Switch, Clutch Sleeve Cyl Kit, Clutch Master Cyl Kit, Relay 12V, Clutch Plate, Pressure Plate, Release bearing, Fan Belt, Fan Belt Tensioner, Wheel Cyl Kit, Wheel Cyl Assy, Tie Rod end, Gear Lever Kit, Alternator Assy, Vacuum Pump, Brake Shoes, Oil Filter, Fuel Filter, Tandom master cyl assy, Wheel stud with nut, Comination switch assy, Clutch plate assy, Bty main switch, Self starter assy, Wiper Blade, Calliper Pad Tensioner Spring, Shock Absorber Front or Rear, Door Lock Mechanism LH or RH, Fog Light Assy, Hand Brake Cable Complete, Calliper Pad, Brake Master Cyl Assy with Booster, Wiper Motor Assy, Suspension Bush Kit, AC Pipe Set with Nozzle Element, Head Light Assy Left or Right, Break Shoes, AC Filter, Air Filter, Fuel Filter Twin Pipe in SOUTH WEST DELHI, DELHI. Quantity: 71. Submission Deadline: 03-10-2025 16: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fuel Cut Off Solenoid Valve , Wind Shield Glass , Dvr Co Dvr Side Rear view mirror , Rotary Switch , Clutch Sleeve Cyl Kit , Clutch Master Cyl Kit , Relay 12V , Clutch Plate , Pressure Plate , Release bearing , Fan Belt , Fan Belt Tensioner , Wheel Cyl Kit , Wheel Cyl Assy , Tie Rod end , Gear Lever Kit , Alternator Assy , Vacuum Pump , Brake Shoes , Oil Filter , Fuel Filter , Tandom master cyl assy , Wheel stud with nut , Comination switch assy , Clutch plate assy , Bty main switch , Self starter assy , Wiper Blade , Calliper Pad Tensioner Spring , Shock Absorber Front or Rear , Door Lock Mechanism LH or RH , Fog Light Assy , Hand Brake Cable Complete , Calliper Pad , Brake Master Cyl Assy with Booster , Wiper Motor Assy , Suspension Bush Kit , AC Pipe Set with Nozzle Element , Head Light Assy Left or Right , Break Shoes , AC Filter , Air Filter , Fuel Filter Twin Pipe

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8385057.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 45 Items Sign in for GEM prices

#1

Fuel Cut Off Solenoid Valve

Fuel Cut Off Solenoid Valve

1 nos Delivery: 15 days
#2

Wind Shield Glass

Wind Shield Glass

1 nos Delivery: 15 days
#3

Dvr Co Dvr Side Rear view mirror

Dvr Co Dvr Side Rear view mirror

1 nos Delivery: 15 days
#4

Rotary Switch

Rotary Switch

1 nos Delivery: 15 days
#5

Clutch Sleeve Cyl Kit

Clutch Sleeve Cyl Kit

2 nos Delivery: 15 days
#6

Clutch Master Cyl Kit

Clutch Master Cyl Kit

2 nos Delivery: 15 days
#7

Relay 12V

Relay 12V

1 nos Delivery: 15 days
#8

Clutch Plate

Clutch Plate

1 nos Delivery: 15 days
#9

Pressure Plate

Pressure Plate

1 nos Delivery: 15 days
#10

Release bearing

Release bearing

2 nos Delivery: 15 days
#11

Fan Belt

Fan Belt

1 nos Delivery: 15 days
#12

Fan Belt Tensioner

Fan Belt Tensioner

2 nos Delivery: 15 days
#13

Wheel Cyl Kit

Wheel Cyl Kit

2 nos Delivery: 15 days
#14

Wheel Cyl Assy

Wheel Cyl Assy

1 nos Delivery: 15 days
#15

Tie Rod end

Tie Rod end

1 nos Delivery: 15 days
#16

Gear Lever Kit

Gear Lever Kit

2 nos Delivery: 15 days
#17

Alternator Assy

Alternator Assy

1 nos Delivery: 15 days
#18

Vacuum Pump

Vacuum Pump

2 nos Delivery: 15 days
#19

Brake Shoes

Brake Shoes

2 pair Delivery: 15 days
#20

Oil Filter

Oil Filter

2 nos Delivery: 15 days
#21

Fuel Filter

Fuel Filter

2 nos Delivery: 15 days
#22

Oil Filter

Oil Filter

2 nos Delivery: 15 days
#23

Tandom master cyl assy

Tandom master cyl assy

1 nos Delivery: 15 days
#24

Wheel stud with nut

Wheel stud with nut

10 nos Delivery: 15 days
#25

Comination switch assy

Comination switch assy

1 nos Delivery: 15 days
#26

Clutch plate assy

Clutch plate assy

1 nos Delivery: 15 days
#27

Bty main switch

Bty main switch

1 nos Delivery: 15 days
#28

Self starter assy

Self starter assy

1 nos Delivery: 15 days
#29

Wiper Blade

Wiper Blade

3 nos Delivery: 15 days
#30

Calliper Pad Tensioner Spring

Calliper Pad Tensioner Spring

2 nos Delivery: 15 days
#31

Shock Absorber Front or Rear

Shock Absorber Front or Rear

1 nos Delivery: 15 days
#32

Door Lock Mechanism LH or RH

Door Lock Mechanism LH or RH

1 nos Delivery: 15 days
#33

Wind Shield Glass

Wind Shield Glass

1 nos Delivery: 15 days
#34

Fog Light Assy

Fog Light Assy

1 nos Delivery: 15 days
#35

Hand Brake Cable Complete

Hand Brake Cable Complete

1 nos Delivery: 15 days
#36

Calliper Pad

Calliper Pad

1 set Delivery: 15 days
#37

Brake Master Cyl Assy with Booster

Brake Master Cyl Assy with Booster

1 nos Delivery: 15 days
#38

Wiper Motor Assy

Wiper Motor Assy

1 nos Delivery: 15 days
#39

Suspension Bush Kit

Suspension Bush Kit

1 set Delivery: 15 days
#40

AC Pipe Set with Nozzle Element

AC Pipe Set with Nozzle Element

1 nos Delivery: 15 days
#41

Head Light Assy Left or Right

Head Light Assy Left or Right

1 nos Delivery: 15 days
#42

Break Shoes

Break Shoes

1 pair Delivery: 15 days
#43

AC Filter

AC Filter

2 nos Delivery: 15 days
#44

Air Filter

Air Filter

2 nos Delivery: 15 days
#45

Fuel Filter Twin Pipe

Fuel Filter Twin Pipe

2 nos Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
Associated Industrial Enterprises   Under PMA
-27-09-2025 12:11:00
2
AUTO BATTERY CENTER   Under PMA
-30-09-2025 15:07:28
3
PEEKAY SUPPLY   Under PMA
-30-09-2025 15:45:59
4
SOLDIER ENTERPRISES   Under PMA
-27-09-2025 20:19:54

Financial Results

Rank Seller Price Item
L1
AUTO BATTERY CENTER(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Fuel Cut Off Solenoid Valve,Wind Shield Glass,Dvr Co Dvr Side Rear view mirror,Rotary Switch,Clutch
L2
PEEKAY SUPPLY (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Fuel Cut Off Solenoid Valve,Wind Shield Glass,Dvr Co Dvr Side Rear view mirror,Rotary Switch,Clutch
L3
Associated Industrial Enterprises (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Fuel Cut Off Solenoid Valve,Wind Shield Glass,Dvr Co Dvr Side Rear view mirror,Rotary Switch,Clutch
L4
SOLDIER ENTERPRISES   Under PMA
Item Categories : Fuel Cut Off Solenoid Valve,Wind Shield Glass,Dvr Co Dvr Side Rear view mirror,Rotary Switch,Clutch