TenderDekho Logo
Active GEM

Invitation to Bid - Transportation of HFHSD through Tank Truck for Mumbai Port and JNPA Nhava Sheva,HFHSD Barging at Mu in MUMBAI, MAHARASHTRA

Bid Publish Date

21-Aug-2026, 2:49 pm

Bid End Date

11-Sep-2026, 3:00 pm

EMD

₹2,60,000

Location

MUMBAI , MAHARASHTRA

Progress

Issue21-Aug-2026, 2:49 pm
Corrigendum28-Aug-2026
AwardPending

Hindustan Petroleum Corporation Ltd has released a public tender for Transportation of HFHSD through Tank Truck for Mumbai Port and JNPA Nhava Sheva, HFHSD Barging at Mumbai Port and JNPA Nhava Sheva - per bunker supply up to and including 150 MT, HFHSD Barging at Mumbai Port and JNPA Nhava Sheva - per bunker supply exceeding 150 MT, Transportation of HFHSD through Tank Truck for Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. , HFHSD Barging at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. - per bunker supply up to and including 150 MT, HFHSD Barging at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. - per bunker supply exceeding 150 MT, Transportation of HFHSD through Tank Truck for MPT, Goa in MUMBAI, MAHARASHTRA. Quantity: 2540060. Submission Deadline: 11-09-2026 15: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

2540060

Category

Transportation of HFHSD through Tank Truck for Mumbai Port and JNPA Nhava Sheva

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3876

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Transportation of HFHSD through Tank Truck for Mumbai Port and JNPA Nhava Sheva , HFHSD Barging at Mumbai Port and JNPA Nhava Sheva - per bunker supply up to and including 150 MT , HFHSD Barging at Mumbai Port and JNPA Nhava Sheva - per bunker supply exceeding 150 MT , Transportation of HFHSD through Tank Truck for Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. , HFHSD Barging at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. - per bunker supply up to and including 150 MT , HFHSD Barging at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. - per bunker supply exceeding 150 MT , Transportation of HFHSD through Tank Truck for MPT, Goa

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

51

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

27-08-2026 11:00:00

Pre-Bid Venue

Topic: Prebid meeting - Tender for Transportation of HFHSD Ex Mumbai Time: Aug 27, 2026 11:00 AM India Join Zoom Meeting https://hpcl-in.zoom.us/j/98205939040? pwd=TOv2ihv609j8lpTDPwlocelgAgiHpT.1

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400050

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anshul Kumar Gupta400050,Mumbai I&C Regional Office 3/4, S.V. ROAD & TURNER RD JN BANDRA (W) MumbaiMumbai SuburbanMaharashtra40005015000730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9788999.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

28-Aug-2026

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Transportation of HFHSD through Tank Truck for Mumbai Port and JNPA Nhava Sheva

Placement of tank trucks and loading of HFHSD ex-HPCL Mahul / Vashi / MR-II Terminal, transportation and unloading of the product into barges placed at Mumbai Port and JNPA Nhava Sheva, including all safety fittings, in-transit risk cover, toll tax, road tax, entry charges, octroi, parking, detention, wharfage and port charges, surveyor co-ordination and all other overheads. Rate shall be quoted on per KL basis, inclusive of applicable GST.

15,000 rupees per kilolitre Delivery: 730 days
#2

HFHSD Barging at Mumbai Port and JNPA Nhava Sheva - per bunker supply up to and including 150 MT

Hiring and deployment of self-propelled, double-hulled barge of minimum 300 KL carrying capacity registered under the IV Act with IRS class, receipt of HFHSD from tank trucks at Mumbai Port and JNPA Nhava Sheva and subsequent transfer of the product through barge to the vessels at anchorage Inner or Outer, including all port clearances, permissions, wharfage and port charges, surveyor co-ordination and documentation. Applicable where the quantity delivered against one Bunker Delivery Note is up to and including 150 MT. For determining whether a supply falls above or below the 150 MT threshold, 1 MT shall be taken as 1.21 KL as per Clause 5.9. Rate shall be quoted as a lump sum per supply, payable irrespective of the actual quantity delivered, inclusive of applicable GST.

50 rupees lump sum per supply Delivery: 730 days
#3

HFHSD Barging at Mumbai Port and JNPA Nhava Sheva - per bunker supply exceeding 150 MT

Receipt of HFHSD from tank trucks at Mumbai Port and JNPA Nhava Sheva and subsequent transfer of the product through barge to the vessels at anchorage Inner or Outer, including all port clearances, permissions, wharfage and port charges, surveyor co-ordination and documentation. Applicable where the quantity delivered against one Bunker Delivery Note exceeds 150 MT, in which case payment shall be made at this per KL rate on the entire quantity delivered in that supply. For determining whether a supply falls above or below the 150 MT threshold, 1 MT shall be taken as 1.21 KL as per Clause 5.9. Rate shall be quoted on per KL basis, inclusive of applicable GST.

20,000 rupees per kilolitre Delivery: 730 days
#4

Transportation of HFHSD through Tank Truck for Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc.

Placement of tank trucks and loading of HFHSD ex-HPCL Mahul / Vashi / MR-II Terminal, transportation and unloading of the product into barges placed at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan and nearby ports as advised by HPCL, including all safety fittings, in-transit risk cover, toll tax, road tax, entry charges, octroi, parking, detention, wharfage and port charges, surveyor co-ordination and all other overheads. Quantity indicated is KM multiplied by KL, being the product of the volume to be delivered and the round trip distance, based on 10000 KL of volume delivery at an average round trip distance of 100 Km. Rate shall be quoted on per KM per KL basis, inclusive of applicable GST.

1,000,000 rupees per km per kilolitre Delivery: 730 days
#5

HFHSD Barging at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. - per bunker supply up to and including 150 MT

Hiring and deployment of self-propelled, double-hulled barge of minimum 300 KL carrying capacity registered under the IV Act with IRS class, receipt of HFHSD from tank trucks at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan and nearby ports and subsequent transfer of the product through barge to the vessels at anchorage Inner or Outer, including all port clearances, permissions, wharfage and port charges, surveyor co-ordination and documentation. Applicable where the quantity delivered against one Bunker Delivery Note is up to and including 150 MT. For determining whether a supply falls above or below the 150 MT threshold, 1 MT shall be taken as 1.21 KL as per Clause 5.9. Rate shall be quoted as a lump sum per supply, payable irrespective of the actual quantity delivered, inclusive of applicable GST.

10 rupees lump sum per supply Delivery: 730 days
#6

HFHSD Barging at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan etc. - per bunker supply exceeding 150 MT

Receipt of HFHSD from tank trucks at Dighi, Jaigarh, Dharmtar, Rewas, Vadhvan and nearby ports and subsequent transfer of the product through barge to the vessels at anchorage Inner or Outer, including all port clearances, permissions, wharfage and port charges, surveyor co-ordination and documentation. Applicable where the quantity delivered against one Bunker Delivery Note exceeds 150 MT, in which case payment shall be made at this per KL rate on the entire quantity delivered in that supply. For determining whether a supply falls above or below the 150 MT threshold, 1 MT shall be taken as 1.21 KL as per Clause 5.9. Rate shall be quoted on per KL basis, inclusive of applicable GST.

5,000 rupees per kilolitre Delivery: 730 days
#7

Transportation of HFHSD through Tank Truck for MPT, Goa

Placement of tank trucks and loading of HFHSD ex-HPCL Mahul / Vashi / MR-II Terminal, transportation and unloading of the product into barges placed at MPT Goa, including all safety fittings, in-transit risk cover, toll tax, road tax, entry charges, octroi, parking, detention, wharfage and port charges, surveyor co-ordination and all other overheads. Quantity indicated is KM multiplied by KL, being the product of the volume to be delivered and the round trip distance, based on 5000 KL of volume delivery at an average round trip distance of 300 Km. Rate shall be quoted on per KM per KL basis, inclusive of applicable GST.

1,500,000 rupees per km per kilolitre Delivery: 730 days

Categories 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer