Bid Publish Date
06-Aug-2026, 5:43 pm
Bid End Date
17-Aug-2026, 6:00 pm
Value
₹95,87,059
Location
Progress
RAThe Bhilai Steel Plant of the Steel Authority of India Limited invites a service contract for the Coke Oven Gas Line Replacement in the RH-1, RH-2 and tundish bay areas. The procurement is located in DURG, CHHATTISGARH - 490001 with an estimated value of ₹9,587,058.68. The scope covers replacing gas pipelines within coke oven facilities, with no BOQ items published. The tender emphasizes execution by a service provider capable of precise gas-line replacement and safety-compliant installation. The opportunity is distinguished by its focus on critical coke oven gas infrastructure in a major steel plant and requires adherence to plant safety and process integration criteria. No start/end date is provided in the data.
Product/Service: Service contract for coke oven gas line replacement in RH-1, RH-2, tundish bay at Bhilai Steel Plant.
Location/Site: Bhilai Steel Plant, Durg district, Chhattisgarh.
Estimated value: ₹9,587,058.68.
BoQ: No items listed; bidders should anticipate /request scope clarifications from TI.
Key delivery context: Replacement of gas lines with safety-compliant installation, alignment with plant process plant safety standards.
Experience/Capability: Demonstrated capability in industrial gas-pipeline modifications within a steel-plant setting.
Standards/Compliance: Not specified in data; bidders should seek ATC / ATC document view for exact standards.
Wider context: The assignment sits under Custom Bid for Services and requires integration with existing coke-oven gas systems and safety-operational procedures.
Project: Coke Oven Gas Line Replacement in RH-1, RH-2, tundish bay
Location: Bhilai Steel Plant, Durg district, Chhattisgarh
Estimated value: ₹9,587,058.68
BoQ: Not available; coordinate with purchaser for scope specifics
Experience: Industrial gas-line alteration in steel plants preferred
Compliance: ATC document to define exact technical standards
EMD amount not disclosed; confirm via ATC
Delivery timeline and payment terms to be defined in ATC
Submit GST, PAN, experience and financial documents with technical bid
Payment terms to be specified in ATC; bidders should expect schedule dependent on field acceptance and milestones
Delivery window to be clarified in ATC; ensure alignment with plant shutdowns and safety windows
LD terms to be defined in ATC; bidders must plan for risk mitigation in gas-line work
Experience in industrial gas-line replacement within steel plants
Demonstrated safety compliance and site clearance
Financial capability to undertake ₹9.59 million scope
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | SAHICON ENGINEERING & TRADING Under PMA Winner | ₹1,04,68,422 | Item Categories : Custom Bid for Services - JOB OF COKE OVEN GAS LINE REPLACEMENT IN RH-1, RH-2 AND TUNDISH BAY |
| L2 | M/S KUSUM ENTERPRISES Under PMA | ₹1,04,78,900 | Item Categories : Custom Bid for Services - JOB OF COKE OVEN GAS LINE REPLACEMENT IN RH-1, RH-2 AND TUNDISH BAY |
| L3 | SANMATHI ENTERPRISES Under PMA | ₹1,49,31,800 | Item Categories : Custom Bid for Services - JOB OF COKE OVEN GAS LINE REPLACEMENT IN RH-1, RH-2 AND TUNDISH BAY |
🎉 L1 Winner
SAHICON ENGINEERING & TRADING Under PMA
Final Price: ₹1,04,68,422
Please sign in or create an account to view contract details and download result documents.
Start
04-Sep-2026, 1:00 pm
End
05-Sep-2026, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1
Similar Category
Operation And Maintenance Of Other Machines And Plants
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
13
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Custom Bid for Services - JOB OF COKE OVEN GAS LINE REPLACEMENT IN RH-1, RH-2 AND TUNDISH BAY
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Durg
Delivery Pincodes
490001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sharad Ashtikar | 490001,Bhilai Steel Plant | Durg | Chhattisgarh | 490001 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar gas-line or steel-plant works
Financial statements (minimum last 2 financial years)
EMD submission proof (if required by ATC) and security deposit details
Technical bid documents and methodology for gas line replacement
OEM authorizations or subcontractor approvals (if applicable)
Work safety and environmental compliance certificates
Key insights about CHHATTISGARH tender market
Bidders should review the ATC document for Bhilai Steel Plant, ensure GST and PAN compliance, compile experience certificates for industrial gas-line work, supply financial statements, and prepare a technical approach for gas-line replacement in RH-1, RH-2, tundish bay. Emphasize safety and process integration in your submission.
Submit GST registration, PAN card, last 2 financial statements, experience certificates for similar projects, technical bid with methodology, EMD proof if applicable, and OEM authorizations or sub-contractor approvals as per ATC. Ensure site-safety certifications are included.
Exact specifications are in the ATC document; the scope is coke oven gas line replacement in RH-1, RH-2, tundish bay. Expect safety-compliant installation, integration with existing gas systems, and adherence to plant safety standards; confirm pipe sizes and materials in ATC.
Delivery timeline is to be clarified in the ATC; bidders should align work with plant shutdowns and safety protocols, proposing phase-wise execution with milestones subject to purchaser approval.
Payment terms are defined in the ATC; bidders should anticipate milestone-based payments tied to field completion, quality acceptance, and safety compliance, with final settlement upon commissioning of the gas line.
EMD amount is not disclosed in the provided data; bidders must check the ATC for exact EMD or security deposit requirements and payable mode.
Prefer bidders with prior industrial gas-line experience in steel plants, demonstrated safety certifications, and financial stability; ATC will specify minimum criteria and any OEM authorizations required.
Click the ATC link in the tender portal to view buyer-specified terms, standards, and conditions. Review for exact scope, EMD, delivery, and penalties; ensure your bid addresses all stated requirements.