The Indian Army, Department Of Military Affairs, invites bids for a Topographical Survey-related procurement in Hyderabad, Telangana. Although the title is not disclosed, the scope centers on survey services/assets aligned with government field operations. The contract contemplates flexible quantities with a 25% upward/downward option and a delivery framework anchored to approved detailed drawings. Key differentiators include mandatory design approval, and OEM/authorized reseller involvement. Bidders should prepare for engineering design coordination and GST-adjusted pricing, with potential extensions based on option clauses.
Topographical survey procurement with design-drawing approval workflow
Delivery period tied to original delivery order with option-based extension
GST terms: actuals vs applicable rate; maximum quoted GST percentage
OEM/authorized reseller installation/commissioning requirement
Experience: 2+ years with Govt/PSU supplies; primary product value criterion
No BOQ items; scope defined through terms and approvals
Option Clause allows +/-25% quantity with contracted rates
5-day submission of Detailed Design Drawings post-award
GST terms linked to actuals or lower applicable rate, within quoted GST
2+ years govt/PSU supply experience required
OEM/authorized reseller to handle installation and commissioning
GST payable by bidder; reimbursement as actuals or applicable lower rate; no explicit EMD amount disclosed
Delivery begins after last delivery order date; extension formula with minimum 30 days
No explicit LD details provided; delays due to drawing approvals may shift timelines without LD
2+ years manufacturing/supply experience with Central/State Govt or PSU
OEM or authorized reseller involvement required for installation
Ability to submit Detailed Design Drawings within 5 days of award
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Topographical Survey
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Evidence of 2+ years experience supplying similar government projects
Contract copies with Central/State Govt or PSU showing quantity/ value
OEM authorization or reseller authorization documents
Non-disclosure declaration certificate
Key insights about TELANGANA tender market
Bidders must meet the 2+ year govt/PSU supply experience, provide PAN and GST, and submit an EFT mandate. Prepare Detailed Design Drawings within 5 days of award, with approvals or modification lists within 7 days. Ensure OEM authorization for installation and comply with option clause up to 25% quantity changes.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and evidence of govt/PSU supply contracts for 2+ years. Include OEM authorization, NDA if required, and contract copies showing yearly quantities. Ensure all documents align with vendor code creation requirements.
Submit Detailed Design Drawings within 5 days of award; buyer responds with approvals or required modifications within 7 days. Delivery schedule may be re-fixed if approvals are delayed, with a minimum 30-day extension rule for additional quantities.
GST is payable by the bidder based on actuals or the applicable rate, whichever is lower, subject to the maximum quoted GST percentage. GST reimbursement follows government policy and actuals, ensuring no double-dipping.
Bidders or their OEMs must have 2+ years of regularly manufacturing and supplying similar category products to Central/State Govt or PSU. Copies of relevant contracts must be submitted showing quantities supplied per year; primary product value matters in bunch bids.
Installation, commissioning, testing, and training, where applicable, must be carried out by OEM or OEM-certified resources or an authorized reseller to ensure compliance with design specifications and post-install support.
The purchaser may increase/decrease quantity by up to 25% at contract rates. If exercised during extension, the new delivery period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
No BOQ items are listed in the data; scope is defined by terms, option clauses, design approvals, and installation responsibilities. Bidder should rely on the detailed design process and government-issued modifications to interpret quantities and deliverables.