TenderDekho Logo
GEM

Open Tender for Supply, installation and Commissioning of 12” Custody transfer Turbine Flowmeter+ Met in KACHCHH, GUJARAT

Bid Publish Date

09-Feb-2026, 5:46 pm

Bid End Date

02-Mar-2026, 6:00 pm

Progress

Issue09-Feb-2026, 5:46 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 12

Bharat Petroleum Corporation Ltd announces a tender for Supply, installation and Commissioning of 12” Custody transfer Turbine Flowmeter+ Met in KACHCHH, GUJARAT. Quantity: 1. Submission Deadline: 02-03-2026 18: 00: 00. Last date to apply is approaching fast!

Documents 5

GeM-Bidding-8956605.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

LOCAL PURCHASE OF TURBINE FLOWMETER FOR SHAFTING SYSTEM,LOCAL PURCHASE OF TURBINE FLOWMETER FOR SHA

Indian Coast Guard

PORBANDAR, GUJARAT

Posted: 1 April 2025
Closed: 22 April 2025
GEM

Supply Of turbine Pump,Installation and Commissioning Charges,Freight Charges,Training Charges,Any

Munitions India Limited

Posted: 6 November 2024
Closed: 27 November 2024
GEM

TURBINE DISCHARGE MEASURING SYSTEM,INSTALLATION, COMMISSIONING, TRAINING & DEMONSTRATION OF TURBINE

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 9 July 2025
Closed: 30 July 2025
GEM

OPEN CHANNEL FLOW METER THROUGH RECTANGULAR WEIR,Erection, installation and commissioning of open c

Damodar Valley Corporation

BANKURA, WEST BENGAL

Posted: 27 February 2025
Closed: 4 April 2025
GEM

Supply, installation and commissioning

North East Frontier Railway

Posted: 15 November 2024
Closed: 6 December 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer