TenderDekho Logo
Closed GEM

Power Grid Corporation of India Limited 10 Ton Chain Pulley Block Tender NR-III 2026

Bid Publish Date

17-Jul-2026, 10:53 am

Bid End Date

20-Aug-2026, 7:00 pm

EMD

₹28,000

Generate Docs

Progress

Issue17-Jul-2026, 10:53 am
Corrigendum07-Aug-2026
AwardPending

Key Highlights

  • • 10 Ton Chain Pulley Block requirement for NR-III TLM offices
  • • EMD amount ₹28,000; delivery to multiple NR-III locations
  • • Assignment/sub-contract restrictions on award; must obtain prior consent
  • • Joint liability of seller with assignee/sub-contractor for contract performance

Tender Overview

Power Grid Corporation Of India Limited invites bids for the supply of a 10 Ton Chain Pulley Block for various TLM Offices in NR-III. The estimated scope is delivery of a single equipment type to multiple locations within NR-III, with an EMD of ₹28,000. The tender uses Buyer-specified ATC terms, including non-assignment and non-sub-contract restrictions, ensuring direct responsibility by the awarded vendor. Although the BOQ lists zero items, the procurement focuses on a standards-compliant lifting mechanism suitable for regional transmission projects. Respondents should emphasize reliability, warranty, and delivery readiness to meet project timelines.

Technical Specifications & Requirements

  • Equipment type: 10 Ton Chain Pulley Block suitable for lifting operations in NR-III TLM offices
  • Location scope: multiple NR-III TLM offices (not individually itemized in BOQ)
  • EMD: ₹28,000 (test of bid financial security)
  • Standards/quality context: unspecified in the tender data; bidders should propose ISI/IS standards where applicable and present compliance documentation
  • Delivery/installation: no explicit date; bidders should indicate lead times and site readiness for NR-III locations
  • Contract form: non-assignment and non-sub-contract conditions; sellers remain liable for performance with any assignee
  • Tender risk: absence of BOQ items implies confirmation on exact model, rating, and mounting specifications during bid submission

Terms, Conditions & Eligibility

  • EMD requirement: ₹28,000; submit as demand draft or online payment as per buyer instructions
  • Assignment/sub-contract: not allowed without prior written consent of the buyer
  • Liability: seller remains jointly liable with any sub-contractor
  • Documents: ensure compliance documentation, OEM authorization, and financial stability proof
  • Delivery obligations: provide clear timelines and installation readiness for NR-III facilities
  • ATC clause: includes Buyer uploaded ATC terms; refer to the file for additional conditions

Key Specifications

  • Product/service names: 10 Ton Chain Pulley Block

  • Estimated value: not disclosed; EMD ₹28,000

  • Location scope: NR-III TLM offices (not itemized)

  • Experience: evidence of lifting equipment supply recommended

  • Quality/standards: bidder to propose compliant standards and attach docs

  • Delivery: bidder to propose lead times and installation readiness

Terms & Conditions

  • No assignment or subcontract without buyer's written consent

  • EMD of ₹28,000 required with bid submission

  • Joint liability with assignee/sub-contractor for contract performance

Important Clauses

Payment Terms

EMD amount ₹28,000; payment terms to be specified in ATC and contract

Delivery Schedule

Lead times and site readiness to NR-III TLM offices to be clarified in bid

Penalties/Liquidated Damages

LD provisions, if any, to be defined in ATC; verify in bidder response

Bidder Eligibility

  • Proven experience supplying lifting equipment or chain pulley blocks

  • Financial capacity evidenced by recent statements

  • Compliance with purchaser ATC terms and non-sub-contract clauses

Advertisement

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Financial Results

Rank Seller Price Item
L1
HARIOM ENGINEERING WORKS(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III
L2
QUREISHI ENTERPRISES   Under PMA
Item Categories : Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III
L3
NIKE ENERGY MANUFACTURING PRIVATE LIMITED( MSE Social Category:General )    Under PMA
Item Categories : Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III

Tender Data

Bid Details

Quantity

30

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Kanpur Nagar

Delivery Pincodes

209305

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anil Kumar Verma209305,Power Grid Corporation of India Limited, Northern Region Transmission System- III, 400/220 kV Substation , Chakarpur, Kanpur, Pin - 209305 (UP)Kanpur NagarUttar Pradesh20930530120-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9503319.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Categories 5

Corrigendum Updates

2 Updates
#1

Update

07-Aug-2026

Extended Deadline

14-Aug-2026, 9:30 am

Opening Date

14-Aug-2026, 10:00 am

#2

Update

01-Aug-2026

Extended Deadline

07-Aug-2026, 9:30 am

Opening Date

07-Aug-2026, 10:00 am

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience certificates for similar lifting equipment supply

4

Financial statements for last 2-3 years

5

EMD submission proof (₹28,000)

6

Technical bid documents outlining 10 Ton Chain Pulley Block specifications

7

OEM authorization / dealership certificate (if applicable)

8

Any mandatory quality/certification proofs (IS/ISO) as proposed

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the 10 Ton chain pulley block tender NR-III in 2026?

Bidders should prepare EMD of ₹28,000, submit GST, PAN, experience certificates for lifting equipment, and OEM authorizations. Review ATC terms and ensure no assignment/sub-contract without consent. Provide lead times and installation readiness for NR-III TLM offices as part of the technical bid.

What documents are required for the NR-III chain pulley block bid?

Required documents include GST certificate, PAN, last 2-3 years financial statements, experience certificates for similar supply, EMD proof of ₹28,000, OEM authorization, and technical bid detailing 10 Ton Chain Pulley Block specifications and compliance with proposed standards.

What are the essential eligibility criteria for Power Grid NR-III tender?

Eligibility includes proven lifting equipment supply experience, adequate financial capacity, ability to comply with ATC terms, and no unauthorized assignment or subcontracting. Suppliers must demonstrate equipment certification readiness and provide installation timelines for NR-III locations.

What is the EMD amount for the NR-III pulley block tender?

The EMD is ₹28,000. Submit as a demand draft or online payment per tender instructions, along with basic bid documents. Ensure EMD is valid through the bid submission and review period as per ATC terms.

Which standards or certifications should be included for the pulley block bid?

Proposed standards should align with applicable safety and lifting equipment norms; bidders should attach relevant IS/ISO certificates and proof of conformity for the 10 Ton Pulley Block, ensuring ISI/IS certifications where available.

When will delivery and site installation be required for NR-III offices?

Delivery timelines are not specified; bidders must propose lead times and installation readiness for multiple NR-III TLM locations, aligning with project schedules and any site constraints noted in the ATC terms.

Advertisement