Bid Publish Date
17-Jul-2026, 10:53 am
Bid End Date
20-Aug-2026, 7:00 pm
EMD
₹28,000
Location
Progress
Power Grid Corporation Of India Limited invites bids for the supply of a 10 Ton Chain Pulley Block for various TLM Offices in NR-III. The estimated scope is delivery of a single equipment type to multiple locations within NR-III, with an EMD of ₹28,000. The tender uses Buyer-specified ATC terms, including non-assignment and non-sub-contract restrictions, ensuring direct responsibility by the awarded vendor. Although the BOQ lists zero items, the procurement focuses on a standards-compliant lifting mechanism suitable for regional transmission projects. Respondents should emphasize reliability, warranty, and delivery readiness to meet project timelines.
Product/service names: 10 Ton Chain Pulley Block
Estimated value: not disclosed; EMD ₹28,000
Location scope: NR-III TLM offices (not itemized)
Experience: evidence of lifting equipment supply recommended
Quality/standards: bidder to propose compliant standards and attach docs
Delivery: bidder to propose lead times and installation readiness
No assignment or subcontract without buyer's written consent
EMD of ₹28,000 required with bid submission
Joint liability with assignee/sub-contractor for contract performance
EMD amount ₹28,000; payment terms to be specified in ATC and contract
Lead times and site readiness to NR-III TLM offices to be clarified in bid
LD provisions, if any, to be defined in ATC; verify in bidder response
Proven experience supplying lifting equipment or chain pulley blocks
Financial capacity evidenced by recent statements
Compliance with purchaser ATC terms and non-sub-contract clauses
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | HARIOM ENGINEERING WORKS(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III | |
| L2 | QUREISHI ENTERPRISES Under PMA | Item Categories : Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III | |
| L3 | NIKE ENERGY MANUFACTURING PRIVATE LIMITED( MSE Social Category:General ) Under PMA | Item Categories : Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III |
Quantity
30
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of 10 Ton Chain Pulley Block for various TLM Offices in NR-III
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
18
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Kanpur Nagar
Delivery Pincodes
209305
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anil Kumar Verma | 209305,Power Grid Corporation of India Limited, Northern Region Transmission System- III, 400/220 kV Substation , Chakarpur, Kanpur, Pin - 209305 (UP) | Kanpur Nagar | Uttar Pradesh | 209305 | 30 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
14-Aug-2026, 9:30 am
Opening Date
14-Aug-2026, 10:00 am
Extended Deadline
07-Aug-2026, 9:30 am
Opening Date
07-Aug-2026, 10:00 am
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience certificates for similar lifting equipment supply
Financial statements for last 2-3 years
EMD submission proof (₹28,000)
Technical bid documents outlining 10 Ton Chain Pulley Block specifications
OEM authorization / dealership certificate (if applicable)
Any mandatory quality/certification proofs (IS/ISO) as proposed
Key insights about UTTAR PRADESH tender market
Bidders should prepare EMD of ₹28,000, submit GST, PAN, experience certificates for lifting equipment, and OEM authorizations. Review ATC terms and ensure no assignment/sub-contract without consent. Provide lead times and installation readiness for NR-III TLM offices as part of the technical bid.
Required documents include GST certificate, PAN, last 2-3 years financial statements, experience certificates for similar supply, EMD proof of ₹28,000, OEM authorization, and technical bid detailing 10 Ton Chain Pulley Block specifications and compliance with proposed standards.
Eligibility includes proven lifting equipment supply experience, adequate financial capacity, ability to comply with ATC terms, and no unauthorized assignment or subcontracting. Suppliers must demonstrate equipment certification readiness and provide installation timelines for NR-III locations.
The EMD is ₹28,000. Submit as a demand draft or online payment per tender instructions, along with basic bid documents. Ensure EMD is valid through the bid submission and review period as per ATC terms.
Proposed standards should align with applicable safety and lifting equipment norms; bidders should attach relevant IS/ISO certificates and proof of conformity for the 10 Ton Pulley Block, ensuring ISI/IS certifications where available.
Delivery timelines are not specified; bidders must propose lead times and installation readiness for multiple NR-III TLM locations, aligning with project schedules and any site constraints noted in the ATC terms.