DRIVE GEAR AND PINION,ARMATURE,PINION,PRESSURE MAGNET,MAGNET SOLENOID SWITCH,PUMP ASSY FUEL,CLUTCH
Indian Army
Progress
Quantity
13
The Indian Army, Department Of Military Affairs, invites bids from suppliers for a multi-item procurement under the ROTOR ASSY, SOLENOID FUEL PUMP, CLUTCH BEARING, REGULATOR, COMBI SWITCH MS HARNESS, ARMATURE ASSY, DISC CLUTCH, COVER ASSY CLUTCH, SHOCK ABSORBER, FUEL MODULE ASSY, ASSY FUEL FILTER, MAGNET SOLENOID SWITCH category. The location is WEST DELHI, DELHI - 110008. The scope covers a set of 12 items with unspecified quantities in the BOQ; the tender includes a variation clause allowing up to 25% quantity changes at contracted rates and a delivery period linked to the original delivery timeline. The bidder must adhere to sample approval processes post-award and ensure bulk supply conforms to approved samples, with penalties for non-conformance as described. This opportunity is targeted at suppliers capable of delivering multiple engine and automotive subsystems components in a defense procurement context.
Option clause allows ±25% quantity variation at contracted rates
Advance sample approval required within 5 days of contract award
NDA to be uploaded on bidder letterhead; anti-disclosure commitments
Not specified in data; assume standard defense procurement terms subject to contract
Delivery period linked to original delivery order date; extended time calculated by formula with minimum 30 days
Not explicitly stated; contract may include LDs per buyer terms
Not under liquidation or bankruptcy
Demonstrated capability to supply multiple automotive defense components
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and NDA
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
ALWAR, RAJASTHAN
Indian Army
JAISALMER, RAJASTHAN
Indian Army
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ROTOR ASSY | ROTOR ASSY | 1 | nos | gemclk227fwc | 15 |
| 2 | SOLENOID FUEL PUMP | SOLENOID FUEL PUMP | 1 | nos | gemclk227fwc | 15 |
| 3 | CLUTCH BEARING | CLUTCH BEARING | 1 | nos | gemclk227fwc | 15 |
| 4 | REGULATOR | REGULATOR | 1 | nos | gemclk227fwc | 15 |
| 5 | COMBI SWITCH MS HARNESS | COMBI SWITCH MS HARNESS | 1 | nos | gemclk227fwc | 15 |
| 6 | ARMATURE ASSY | ARMATURE ASSY | 1 | nos | gemclk227fwc | 15 |
| 7 | DISC CLUTCH | DISC CLUTCH | 1 | nos | gemclk227fwc | 15 |
| 8 | COVER ASSY CLUTCH | COVER ASSY CLUTCH | 1 | nos | gemclk227fwc | 15 |
| 9 | SHOCK ABSORBER | SHOCK ABSORBER | 2 | nos | gemclk227fwc | 15 |
| 10 | FUEL MODULE ASSY | FUEL MODULE ASSY | 1 | nos | gemclk227fwc | 15 |
| 11 | ASSY FUEL FILTER | ASSY FUEL FILTER | 1 | nos | gemclk227fwc | 15 |
| 12 | MAGNET SOLENOID SWITCH | MAGNET SOLENOID SWITCH | 1 | nos | gemclk227fwc | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled Cheque
EFT Mandate certified by Bank
Non-Disclosure Declaration
Advance sample submission documents
Vendor Code Creation documents
Bid security/EMD documentation (as applicable)
Key insights about DELHI tender market
Bidders should submit PAN, GSTIN, cancelled cheque, EFT mandate, and a signed NDA along with the bid. Ensure 12-item BOQ readiness, confirm capability for 25% quantity variation, and be prepared for advance sample approval within 5 days of award.
Submit GSTIN, PAN, cancelled cheque, EFT mandate certified by bank, NDA on bidder letterhead, and documents for vendor code creation. Include any relevant experience certificates and financial statements per the tender's T&C framework.
Delivery can be increased by up to 25% of the bid quantity during contract, with time extended per formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Within 5 days of award, submit an advance sample. Buyer responds with approval or modification list within 5 days. Bulk supply must follow the approved sample; delays in buyer approval reset delivery timelines and may avoid LDs.
Bidders must not be under liquidation or bankruptcy. Upload an undertaking confirming sound financial standing and provide typical financial statements as part of bid submission.
The BOQ includes ROTOR ASSY, SOLENOID FUEL PUMP, CLUTCH BEARING, REGULATOR, COMBI SWITCH MS HARNESS, ARMATURE ASSY, DISC CLUTCH, COVER ASSY CLUTCH, SHOCK ABSORBER, FUEL MODULE ASSY, ASSY FUEL FILTER, MAGNET SOLENOID SWITCH; exact quantities are not disclosed.
A Non-Disclosure Declaration must be uploaded on the bidder’s letterhead, explicitly restricting sharing of contract details, specifications, and plans with third parties under penalty of legal action.
Successful bidder must obtain advance sample approval; submit 1 sample within 5 days; buyer provides approval or modification list within 5 days; bulk supply must adhere to approved sample specifications.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS