The procuring entity is the Border Road Organisation under the Department of Defence. The tender seeks the Supply Installation Testing and Commissioning (SITC) of security equipment, across five BOQ lines. The terms authorize a quantity variation up to 50% during contract and extended delivery, with delivery timelines linked to the original order date. Bidders must support the full scope of supply with installation, testing and commissioning, at contract rates. Key differentiators include mandatory certifications and lab-based material testing within the buyer’s evaluation framework. This tender emphasizes quality assurance and compliance with prescribed standards, rather than a sole price approach, and invites bidders prepared for flexible delivery windows within governed limits.
Option clause allows ±50% quantity variation with extended delivery
SITC of security equipment with on-site installation and commissioning
Mandatory ISO 9001, BIS licences, Type Test certificates, and Material Test Certificate
Not explicitly detailed; bidders should align with standard government terms and confirm upon tender award.
Delivery period linked to the last date of the original delivery order; extended delivery time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
Not specified in provided data; bidders should verify in the final tender documents.
ISO 9001 certification for bidder or OEM
BIS licence and type test certification as per product specification
Past project experience evidence including contracts, invoices, or client certificates
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SOUTH WEST DELHI, DELHI
Indian Army
SOUTH WEST DELHI, DELHI
Indian Army
SOUTH WEST DELHI, DELHI
Indian Army
SOUTH WEST DELHI, DELHI
Border Road Organisation
JODHPUR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | BOQ 1 | Over Head Gantry Cantilever Sign Board both side 12000 mm x 1200 mm with installation and complete Ground or Foundation work with all accessories at following site locations a) 127 RCC - 02 Nos 127 RCC Sector b) 1441 BCC - 04 Nos (i) Modular Bridge-I at Km-18 pt 00 on bomdir-Lumla Road -02 Nos (ii) Modular Bridge-II at Km-30 pt 04 Km on Bomdir-Lumla Road- 02 Nos | 6 | nos | oc1032iespl | 100 |
| 2 | BOQ 2 | Metallic Sign Board Hazard Mark (Right) | 8 | nos | oc1032iespl | 100 |
| 3 | BOQ 3 | Metallic Sign Board Hazard Mark (Left) | 8 | nos | oc1032iespl | 100 |
| 4 | BOQ 4 | Information Sign Board written on both side 900 mm | 4 | nos | oc1032iespl | 100 |
| 5 | BOQ 5 | Metallic Sign Board 900 mm | 4 | nos | oc1032iespl | 100 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates / contract copies with client references
Financial statements (as applicable)
EMD document (demand draft or online payment proof)
Technical bid documents
OEM authorization / type test certificates
BIS licence and product approvals (where specified)
Start
19-Dec-2025, 4:00 pm
End
20-Dec-2025, 4:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | GANPATI BUSINESS SYNDICATE Under PMA | - | 13-11-2025 15:31:07 | Qualified |
| 2 | KRISHNA COMMERCIAL ENTERPRISE Under PMA | - | 11-11-2025 18:19:33 | Qualified |
| 3 | M R SALES CORP Under PMA | - | 12-11-2025 16:24:29 | Qualified |
| 4 | MONAL TRADING CO Under PMA | - | 13-11-2025 11:23:04 | Qualified |
| 5 | NEELAM ENTERPRISES Under PMA | - | 12-11-2025 14:53:53 | Qualified |
| 6 | P D TRADES AGENCIES Under PMA | - | 12-11-2025 17:45:04 | Disqualified |
| 7 | SIGNAGE INDIA Under PMA | - | 13-11-2025 13:24:38 | Disqualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | GANPATI BUSINESS SYNDICATE(MII) Under PMA | ₹31,98,800 | Item Categories : BOQ 1,BOQ 2,BOQ 3,BOQ 4,BOQ 5 |
| L2 | M R SALES CORP (MSE,MII)( MSE Social Category:General ) Under PMA | ₹42,60,200 | Item Categories : BOQ 1,BOQ 2,BOQ 3,BOQ 4,BOQ 5 |
| L3 | KRISHNA COMMERCIAL ENTERPRISE (MII)( MSE Social Category:General ) Under PMA | ₹44,42,944 | Item Categories : BOQ 1,BOQ 2,BOQ 3,BOQ 4,BOQ 5 |
| L4 | NEELAM ENTERPRISES (MSE,MII)( MSE Social Category:General ) Under PMA | ₹45,74,000 | Item Categories : BOQ 1,BOQ 2,BOQ 3,BOQ 4,BOQ 5 |
| L5 | MONAL TRADING CO (MSE,MII)( MSE Social Category:General ) Under PMA | ₹45,90,000 | Item Categories : BOQ 1,BOQ 2,BOQ 3,BOQ 4,BOQ 5 |
Key insights about ARUNACHAL PRADESH tender market
Bidders must submit GST, PAN, experience contracts, financials, EMD, and technical bids with OEM authorizations. Ensure ISO 9001 certification or OEM equivalent, BIS licences, and Material Test Certificates. The scope includes SITC and must align with the option clause allowing 50% quantity variations.
Required documents include GST registration, PAN, experience certificates or contract copies, financial statements, EMD proof, technical bid, OEM authorizations, BIS licence, and type/test certificates. Missing certificates can lead to bid rejection per ATC requirements.
Bidders must hold ISO 9001 certification; ensure BIS licences and type/test certificates per product specifications, and include Material Test Certificates. Compliance with these standards is critical for acceptance in the buyer’s lab testing phase.
Delivery starts from the last date of the original delivery order; if quantity increases, extended time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum 30 days and possible extension up to the original delivery period.
Provide a contract copy with invoices and self-certification, execution certificates from clients, or third-party inspection notes. These demonstrate capability to deliver SITC and related installation and commissioning services.
Payment terms are not explicitly stated in the available data; bidders should prepare for standard government terms and confirm at bid opening and final award, including any advance or milestone-based payments per contract.
Submit Material Test Certificates with supply; the Buyer’s lab will conduct tests and results will determine acceptance. Ensure samples meet product specification and provide traceability documentation for all test results.
Scope covers Supply, Installation, Testing and Commissioning of security equipment as per bid document; ensure on-site installation support, commissioning readiness, and complete SITC deliverables within the specified delivery window.