TenderDekho Logo
GEM

IOCL Bongaigaon Refinery procurement of VLV/GT WEDGE A216 A217 and related stainless steel components 2025

Bid Publish Date

11-Nov-2025, 9:22 am

Bid End Date

25-Nov-2025, 10:00 am

Progress

Issue11-Nov-2025, 9:22 am
Technical24-11-2025 19:05:31
Award23-Dec-2025, 12:06 am
Explore all 4 tabs to view complete tender details

Quantity

184

Category

VLV,GT,WEDGE,A216 WCB,13 percent Cr,FLG,150,6IN

Bid Type

Two Packet Bid

Categories 3

Tender Overview

Organization: Indian Oil Corporation Limited – Bongaigaon Refinery. Procuring a range of valve, flange, and stainless steel components across multiple material grades (A216 WCB, A217 C5, A351 CF3M, SS 316L) with various sizes (6IN to 12IN) and specifications. Estimated value not disclosed; project scope emphasizes supply of goods only, with OEM warranty and post‑sales support. The tender includes a 25% quantity variation right and requires third‑party inspection coordinated by IOCL. Delivery, installation, and testing logistics are aligned to consignee locations, with tariffed inspection and testing costs built into bids. A robust after‑sales service network in INDIA is expected, including on‑site training and maintenance capabilities. Unique aspects: multi‑grade corrosion‑resistant materials, flanged and socket weld configurations, and a mix of carbon and stainless steel options. This tender is positioned for bidders with strong inventory, supply chain resilience, and a global standard of product compliance.

Technical Specifications & Requirements

  • Product category: Valve, flange, and stainless steel pipe fittings (VLV/GT/WEDGE combinations) with grades including A216 WCB (13% Cr), A217 C5 (13% Cr), A351CF3M/CF3M SS316L, and A182 F5/F316L.
  • Sizes/ratings: Range from 0.5IN to 12IN; includes SW and FLG configurations; cylindrical and joint types (SW/FLG, STLD, STLD SW).
  • Standards/quality: Requires OEM warranty; third‑party inspection by IOCL‑approved agencies with included TPI charges; installation, commissioning and testing coverage; compliance with in‑house IOCL technical specs and IBR/IGC/NACE/Radiography requirements where applicable.
  • Delivery scope: Goods only; organized to consignee locations; lead times to be negotiated with order; option clause allows quantity fluctuation up to 25% during contract.
  • Documentation: OEM warranty certificates to be submitted at delivery; service centres details to be uploaded with bid; TPI release notes to be provided timely.
  • Testing & inspection: Included destructive testing if required; all testing/inspection costs included in bid price; no extra charges paid by IOCL beyond quoted prices.

Terms, Conditions & Eligibility

  • Scope: Bid price must cover all costs for goods, including testing and inspection charges.
  • Warranty: OEM warranty for the supplied products; post‑installation service and maintenance required; warranty period aligns with supplier’s standard terms after final acceptance.
  • Delivery window: Delivery period to commence after last delivery order date; option clause may extend delivery up to original contract term with a 30‑day minimum; extended time calculated as (increased quantity/original quantity) × original delivery period.
  • Inspection: Third‑party IOCL inspection mandatory; TPI charges included; bidder to arrange timely release notes.
  • Banking/eligibility: No explicit EMD mentioned here; typical bidders must meet IOCL vendor qualification standards and provide OEM authorizations and serviceability certificates.
  • After‑sales: Strong service network requirement in INDIA; installation, commissioning, training and troubleshooting support must be demonstrated with regional centers.
  • Payment terms: Not specified; bidders should anticipate standard IOCL procurement payment cycles with warranty and service commitments.

Key Specifications

    • Product names: VLV/GT/WEDGE components in A216 WCB, A217 C5, A351CF3M/CF3M SS316L, A182 F5/F316L, etc.
    • Quantities/values: Not disclosed; 15 items in BOQ with N/A quantities
    • EMD/Estimated value: Not disclosed in data
    • Certifications/Standards: OEM warranties; third‑party inspection; IBR/IGC/NACE/Radiography where applicable
    • Delivery: Goods only; deliver to consignee locations; option clause allows ±25% quantity variation

Terms & Conditions

  • Option clause permits 25% quantity variation at contract placement and during currency

  • Third‑party IOCL inspection required; TPI charges included in bid

  • OEM warranty certificates must be provided at delivery; after‑sales service network in INDIA required

Important Clauses

Payment Terms

Not explicitly stated; bidders should align with IOCL standard terms and provide clear payment schedule with delivery milestones.

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time calculated by formula with minimum 30 days; option to extend up to original delivery period.

Penalties/Liquidated Damages

Not specified in excerpt; bidders should assume standard IOCL LD terms if applicable and confirm during bid submission.

Bidder Eligibility

  • Experience in supplying valve/flange/stainless steel fittings to large refineries or similar scale projects

  • Financial capability to handle procurement of multi‑grade stainless steel components

  • Authorized OEM support and service network within INDIA; evidence of service centres

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

VLV,GT,WEDGE,A216 WCB,13 percent Cr,FLG,150,6IN , VLV,GT,WEDGE,A216 WCB,13percent Cr,FLG,150,8IN , VLV,GT,WEDGE,A217 C5,13percent Cr,FL,150,6IN , VLV,GT,WEDGE,A217 C5 plus STLTD,FLG,150,2IN , VLV,GT,WEDGE,A217 C5,13percent Cr,FLG,600,6IN , VLV,GT,A182GR.F5,13percent ,STLD,SW,800,0.75 IN , VLV,GT,A182GR.F5,13percent,STLD,SW,800,0.5 IN , VLV,GLB,A182 F5,13percen tCR plus ST,SW,800,0.75IN , VLV,GT,A351CF3M,A182 F316L,FLG,150,12IN , VLV,GT,SS,A351,CF3M,SS316LFL,150,8IN , VLV,GT,FLG,SS,A351GRCF3M,SS316,150,6IN , VLV GT A351CF3M A182F316L FL 150 4IN , VLV,GLB,SS,A351CF3M,SS316L,FL,150,6IN , VLV,GLB,SS,A351CF3M,SS316L,FL,150,3IN , VLV CHK SWING A351CF3M 316L FL 150 6IN

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8570987.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#10

VLV,GT,WEDGE,A216 WCB,13 percent Cr,FLG,150,6IN

VLV,GT,WEDGE,A216 WCB,13 percent Cr,FLG,150,6IN

79 ea Delivery: 120 days
#20

VLV,GT,WEDGE,A216 WCB,13percent Cr,FLG,150,8IN

VLV,GT,WEDGE,A216 WCB,13percent Cr,FLG,150,8IN

70 ea Delivery: 120 days
#30

VLV,GT,WEDGE,A217 C5,13percent Cr,FL,150,6IN

VLV,GT,WEDGE,A217 C5,13percent Cr,FL,150,6IN

1 ea Delivery: 120 days
#40

VLV,GT,WEDGE,A217 C5 plus STLTD,FLG,150,2IN

VLV,GT,WEDGE,A217 C5 plus STLTD,FLG,150,2IN

2 ea Delivery: 120 days
#50

VLV,GT,WEDGE,A217 C5,13percent Cr,FLG,600,6IN

VLV,GT,WEDGE,A217 C5,13percent Cr,FLG,600,6IN

1 ea Delivery: 120 days
#60

VLV,GT,A182GR.F5,13percent ,STLD,SW,800,0.75 IN

VLV,GT,A182GR.F5,13percent ,STLD,SW,800,0.75 IN

6 ea Delivery: 120 days
#70

VLV,GT,A182GR.F5,13percent,STLD,SW,800,0.5 IN

VLV,GT,A182GR.F5,13percent,STLD,SW,800,0.5 IN

6 ea Delivery: 120 days
#80

VLV,GLB,A182 F5,13percen tCR plus ST,SW,800,0.75IN

VLV,GLB,A182 F5,13percen tCR plus ST,SW,800,0.75IN

2 ea Delivery: 120 days
#90

VLV,GT,A351CF3M,A182 F316L,FLG,150,12IN

VLV,GT,A351CF3M,A182 F316L,FLG,150,12IN

2 ea Delivery: 120 days
#100

VLV,GT,SS,A351,CF3M,SS316LFL,150,8IN

VLV,GT,SS,A351,CF3M,SS316LFL,150,8IN

2 ea Delivery: 120 days
#110

VLV,GT,FLG,SS,A351GRCF3M,SS316,150,6IN

VLV,GT,FLG,SS,A351GRCF3M,SS316,150,6IN

2 ea Delivery: 120 days
#120

VLV GT A351CF3M A182F316L FL 150 4IN

VLV GT A351CF3M A182F316L FL 150 4IN

5 ea Delivery: 120 days
#130

VLV,GLB,SS,A351CF3M,SS316L,FL,150,6IN

VLV,GLB,SS,A351CF3M,SS316L,FL,150,6IN

2 ea Delivery: 120 days
#140

VLV,GLB,SS,A351CF3M,SS316L,FL,150,3IN

VLV,GLB,SS,A351CF3M,SS316L,FL,150,3IN

1 ea Delivery: 120 days
#150

VLV CHK SWING A351CF3M 316L FL 150 6IN

VLV CHK SWING A351CF3M 316L FL 150 6IN

3 ea Delivery: 120 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply of valve/flange/stainless steel fittings

4

Audited financial statements for last 3 years

5

EMD/Security deposit documents as applicable

6

OEM authorization letters or direct OEM support certificates

7

Technical bid documents including compliance to IOCL specs

8

Service centre details and after‑sales support plan

9

Quality certifications (ISO 9001 or equivalent, if specified)

Technical Results

S.No Seller Item Date Status
1
FLOWJET VALVES PRIVATE LIMITED   Under PMA
-24-11-2025 19:05:31
2
JINDAL FORGING PRIVATE LIMITED   Under PMA
-24-11-2025 10:06:41
3
LIBRA VALVES INDIA PRIVATE LIMITED   Under PMA
-18-11-2025 16:18:16
4
MICON VALVES (INDIA) PRIVATE LIMITED   Under PMA
-18-11-2025 16:15:11
5
Norflow Controls   Under PMA
-24-11-2025 18:59:33
6
OCEAN VALVES MANUFACTURING COMPANY   Under PMA
-21-11-2025 15:14:40

Contract / Result Documents 3

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for IOCL tender in Bongaigaon for valve and flange components?

Bid submission requires OEM authorizations, GST, PAN, experience certificates, and financial statements. Include OEM warranty certificates, third‑party inspection readiness, and service center details. Ensure the bid covers testing/inspection charges and complies with IOCL’s option clause for 25% quantity variation.

What documents are required for IOCL Bongaigaon procurement of VLV/GT parts?

Submit GST, PAN, 3 years financials, experience certificates for similar supply, OEM authorization, technical compliance documents, and service network details. Include OEM warranty and evidence of post‑sales support in INDIA. Insurance and EMD submissions may be required per IOCL terms.

What standards and certifications are needed for A351CF3M stainless components?

Bidders must provide OEM warranty, third‑party inspection readiness, and possible IS/IEC conformity where specified. Ensure compliance with IOCL technical specifications and provide radiography/IBR/NACE tests where applicable. Include material grade documentation for A351CF3M and SS316L.

When is the delivery timeline and how does the option clause affect it?

Delivery starts from the last date of original delivery order; quantity variation up to 25% is allowed, with extended time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days. IOCL may extend up to the original delivery period.

What is the OEM warranty requirement for IOCL procurement of valves?

OEM warranty certificates must be submitted at delivery. The seller guarantees rectification during the warranty period and demonstrates an established India service network for installation, commissioning, and maintenance.

What third‑party inspection requirements exist for IOCL tender submissions?

Goods are subject to stage wise and final inspection by IOCL approved TPI agencies. TPI charges are included in quoted prices; arrange timely inspection and submit release notes; no time extensions for delays in TI approvals.

What after‑sales service documentation is required for IOCL Bongaigaon bids?

Provide details of service centres near consignee destinations, installation and commissioning plans, training provisions, and troubleshooting support. Include a regional maintenance plan and response times to service requests in INDIA.

What is included in the bid price for IOCL pipe fittings procurement?

Bid price must include all facilities for testing, destructive testing if required, travel, and third‑party inspection costs. Ensure IOCL requires no additional payment beyond the quoted price for TPI and inspection services.