TenderDekho Logo
Active GEM

Open Tender for Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z,Stack SPM A

Bid Publish Date

09-Oct-2026, 6:32 pm

Bid End Date

21-Oct-2026, 10:00 am

EMD

₹2,54,408

Value

₹1,27,20,400

Progress

Issue09-Oct-2026, 6:32 pm
AwardPending

North Eastern Electric Power Corporation Limited invites bids for Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z, Stack SPM Analyser based on triboelectric technology, Supply of SO2 calibration gas cylinder, Supply of NO NO2 calibration gas cylinder, Supply N2 zero gas cylinder 10 litre aluminium cylinder, Installation and commissioning of the complete OCEMS, 1st year Comprehensive Annual Maintenance Contract, 2nd year Comprehensive Annual Maintenance Contract, 3rd year Comprehensive Annual Maintenance Contract. Quantity: 18. Submission Deadline: 21-10-2026 10: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

18

Category

Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

63

OEM Avg. Turnover

107

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z , Stack SPM Analyser based on triboelectric technology , Supply of SO2 calibration gas cylinder , Supply of NO NO2 calibration gas cylinder , Supply N2 zero gas cylinder 10 litre aluminium cylinder , Installation and commissioning of the complete OCEMS , 1st year Comprehensive Annual Maintenance Contract , 2nd year Comprehensive Annual Maintenance Contract , 3rd year Comprehensive Annual Maintenance Contract

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

6

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

98

Delivery Locations

1

Delivery Cities

Sepahijala

Delivery Pincodes

799131

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Goutam Debnath799131,Tripura Gas Based Power Station NEEPCO, Monarchak, PO-Dhanpur, Sonamura, Sepahijala District, TripuraSepahijalaTripura799131198-

Authority Records

MINISTRY OF POWERNORTH EASTERN ELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10013170.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Tripura Gas Based Power Project

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z

For continuous measurement of SO2 NO NO2 and Nox complete with EM060S light emitter RE060 Auto receiver PS152 power supply 15 m optical fibre cable triggering unit and solenoid valves WT256 Webtransfer with IM016 for data storage reporting and real time data transmission to CPCB and SPCB 3 kVA UPS with 15 minute backup output modules and suitable flanges

1 set Delivery: 98 days
#2

Stack SPM Analyser based on triboelectric technology

Stack SPM Analyser based on triboelectric technology

1 no Delivery: 98 days
#3

Supply of SO2 calibration gas cylinder

Supply of SO2 calibration gas cylinder 10 litre aluminium cylinder with double stage regulator

1 set Delivery: 98 days
#4

Supply of NO NO2 calibration gas cylinder

Supply of NO NO2 calibration gas cylinder 10 litre aluminium cylinder with double stage regulator

1 set Delivery: 98 days
#5

Supply N2 zero gas cylinder 10 litre aluminium cylinder

Supply N2 zero gas cylinder 10 litre aluminium cylinder with double stage regulator

1 set Delivery: 98 days
#6

Installation and commissioning of the complete OCEMS

Installation and commissioning of the complete OCEMS at the Main Stack

1 job Delivery: 98 days
#7

1st year Comprehensive Annual Maintenance Contract

1st year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit

4 nos Delivery: 365 days
#8

2nd year Comprehensive Annual Maintenance Contract

2nd year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit

4 nos Delivery: 365 days
#9

3rd year Comprehensive Annual Maintenance Contract

3rd year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit

4 nos Delivery: 365 days

Categories 65

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement