Bid Publish Date
09-Oct-2026, 6:32 pm
Bid End Date
21-Oct-2026, 10:00 am
EMD
₹2,54,408
Value
₹1,27,20,400
Progress
North Eastern Electric Power Corporation Limited invites bids for Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z, Stack SPM Analyser based on triboelectric technology, Supply of SO2 calibration gas cylinder, Supply of NO NO2 calibration gas cylinder, Supply N2 zero gas cylinder 10 litre aluminium cylinder, Installation and commissioning of the complete OCEMS, 1st year Comprehensive Annual Maintenance Contract, 2nd year Comprehensive Annual Maintenance Contract, 3rd year Comprehensive Annual Maintenance Contract. Quantity: 18. Submission Deadline: 21-10-2026 10: 00: 00. Submit your proposal before the deadline.
Quantity
18
Category
Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
63
OEM Avg. Turnover
107
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z , Stack SPM Analyser based on triboelectric technology , Supply of SO2 calibration gas cylinder , Supply of NO NO2 calibration gas cylinder , Supply N2 zero gas cylinder 10 litre aluminium cylinder , Installation and commissioning of the complete OCEMS , 1st year Comprehensive Annual Maintenance Contract , 2nd year Comprehensive Annual Maintenance Contract , 3rd year Comprehensive Annual Maintenance Contract
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
6
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
98
Delivery Locations
1
Delivery Cities
Sepahijala
Delivery Pincodes
799131
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Goutam Debnath | 799131,Tripura Gas Based Power Station NEEPCO, Monarchak, PO-Dhanpur, Sonamura, Sepahijala District, Tripura | Sepahijala | Tripura | 799131 | 1 | 98 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z
For continuous measurement of SO2 NO NO2 and Nox complete with EM060S light emitter RE060 Auto receiver PS152 power supply 15 m optical fibre cable triggering unit and solenoid valves WT256 Webtransfer with IM016 for data storage reporting and real time data transmission to CPCB and SPCB 3 kVA UPS with 15 minute backup output modules and suitable flanges
Stack SPM Analyser based on triboelectric technology
Stack SPM Analyser based on triboelectric technology
Supply of SO2 calibration gas cylinder
Supply of SO2 calibration gas cylinder 10 litre aluminium cylinder with double stage regulator
Supply of NO NO2 calibration gas cylinder
Supply of NO NO2 calibration gas cylinder 10 litre aluminium cylinder with double stage regulator
Supply N2 zero gas cylinder 10 litre aluminium cylinder
Supply N2 zero gas cylinder 10 litre aluminium cylinder with double stage regulator
Installation and commissioning of the complete OCEMS
Installation and commissioning of the complete OCEMS at the Main Stack
1st year Comprehensive Annual Maintenance Contract
1st year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit
2nd year Comprehensive Annual Maintenance Contract
2nd year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit
3rd year Comprehensive Annual Maintenance Contract
3rd year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Continuous Measurement System using insitu non sampling UV DOAS technology Model AR602Z | For continuous measurement of SO2 NO NO2 and Nox complete with EM060S light emitter RE060 Auto receiver PS152 power supply 15 m optical fibre cable triggering unit and solenoid valves WT256 Webtransfer with IM016 for data storage reporting and real time data transmission to CPCB and SPCB 3 kVA UPS with 15 minute backup output modules and suitable flanges | 1 | set | goutamdebnath | 98 | |
| 2 | Stack SPM Analyser based on triboelectric technology | Stack SPM Analyser based on triboelectric technology | 1 | no | goutamdebnath | 98 | |
| 3 | Supply of SO2 calibration gas cylinder | Supply of SO2 calibration gas cylinder 10 litre aluminium cylinder with double stage regulator | 1 | set | goutamdebnath | 98 | |
| 4 | Supply of NO NO2 calibration gas cylinder | Supply of NO NO2 calibration gas cylinder 10 litre aluminium cylinder with double stage regulator | 1 | set | goutamdebnath | 98 | |
| 5 | Supply N2 zero gas cylinder 10 litre aluminium cylinder | Supply N2 zero gas cylinder 10 litre aluminium cylinder with double stage regulator | 1 | set | goutamdebnath | 98 | |
| 6 | Installation and commissioning of the complete OCEMS | Installation and commissioning of the complete OCEMS at the Main Stack | 1 | job | goutamdebnath | 98 | |
| 7 | 1st year Comprehensive Annual Maintenance Contract | 1st year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit | 4 | nos | ajitdubey.neepco | 365 | |
| 8 | 2nd year Comprehensive Annual Maintenance Contract | 2nd year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit | 4 | nos | ajitdubey.neepco | 365 | |
| 9 | 3rd year Comprehensive Annual Maintenance Contract | 3rd year AMC after expiry of the warranty period With spares and consumables including quarterly visits and half yearly calibration against standard gases Billing will be done after quarterly visit | 4 | nos | ajitdubey.neepco | 365 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer