TenderDekho Logo
Closed GEM

Indian Army Stabilizer Water Dispenser Heat Pillar Washing Machine Cloth Stand Procurement Chamba Himachal Pradesh 2026

Bid Publish Date

26-Sep-2026, 10:25 am

Bid End Date

06-Oct-2026, 11:00 am

Value

₹2,99,250

Progress

RA
Issue26-Sep-2026, 10:25 am
Reverse Auction18-Oct-2026, 4:00 pm
AwardPending

Tender Overview

The Indian Army through the Department Of Military Affairs invites bids for a multi-item procurement list including Stabilizers, Water Dispenser, Water Dispenser Bottle, Heat Pillar, Washing Machine, Cloth Stand in CHAMBA, HIMACHAL PRADESH - 176207. Estimated value is ₹299,250. The scope appears to cover supply of diverse household and utility appliances under a single contract, with a 6-item BOQ that implies a bulk residential/office equipment refresh for military installations. The tender emphasizes compliance with detailed design drawings post-award, and a potential quantity adjustment up to 25%. A key differentiator is the requirement for data sheet alignment and pre-approval of drawings, signaling stringent technical conformity and post-award design validation.

Technical Specifications & Requirements

  • Data Sheet submission with bid; product data must match supplied specifications.
  • Experience: bidder or OEM must have supplied similar category products to central/state government or PSUs for at least 3 years prior to bid opening, with contracts to back claims.
  • Installation, commissioning, testing, and configuration are part of the deliverables.
  • Option clauses allow quantity fluctuations up to 25% and extended delivery timelines calculated as (additional quantity / original quantity) × original delivery period, with a minimum of 30 days.
  • Buyer reserves right to modify delivery period if drawings are delayed; LD is not charged for buyer-approved delays.
  • Payment and detailed terms align with standard government procurement, including vendor code creation prerequisites.

Terms & Eligibility

  • Delivery: period starts after final delivery order date and may be extended by option clause with correct calculation.
  • EMD: not explicitly stated; bidders must comply with standard vendor code and data sheet matching.
  • Documents: include PAN, GSTIN, cancelled cheque, EFT mandate; OEM authorization and experience contracts recommended.
  • Eligibility: positive evidence of regular manufacture/supply to government bodies for 3 years; no liquidation or bankruptcy.
  • Data Sheet alignment and product mismatch risk—non-conforming bids rejected.
  • Installation, commissioning, testing, and configuration mandated; post-award approval required for Detailed Design Drawings within 5 days and modification list within 7 days.

Key Specifications

  • Product names: Stabilizer, Water Dispenser, Water Dispenser Bottle, Heat Pillar, Washing Machine, Cloth Stand

  • Estimated value: ₹299,250

  • Delivery terms: 25% quantity option, minimum 30 days extra delivery

  • Design drawings: approval within 5 days of award, modifications within 7 days

  • Experience: 3 years govt/PSU supply

  • Data Sheet alignment required; mismatch may lead to bid rejection

Terms & Conditions

  • Delivery quantity may vary by up to 25% at contract signing and during currency

  • Approval of Detailed Design Drawings required within 5 days post-award

  • 3 years govt/PSU experience required with relevant contracts

Important Clauses

Payment Terms

Not explicitly stated; follow standard vendor code and EFT for government orders

Delivery Schedule

Delivery begins from last date of original delivery order; option quantity affects timelines with 30-day minimum

Penalties/Liquidated Damages

LD terms not specified; delays due to buyer approval may not attract LD

Bidder Eligibility

  • 3 years of regular supply to Central/State Govt or PSU for similar products

  • Financial stability and no liquidation or bankruptcy

  • Data Sheet consistency with offered products

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

18-Oct-2026, 4:00 pm

End

19-Oct-2026, 4:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

67

Category

Stabilizer

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Stabilizer , Water Dispenser , Water Dispenser Bottle , Heat Pillar , Washing Machine , Cloth Stand

Delivery Details

Max Delivery Days

20

Delivery Locations

1

Delivery Cities

Chamba

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-ChambaChamba--120-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9949728.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Stabilizer

Stabilizer

1 nos Delivery: 20 days
#2

Water Dispenser

Water Dispenser

10 nos Delivery: 20 days
#3

Water Dispenser Bottle

Water Dispenser Bottle

25 nos Delivery: 20 days
#4

Heat Pillar

Heat Pillar

9 nos Delivery: 20 days
#5

Washing Machine

Washing Machine

4 nos Delivery: 20 days
#6

Cloth Stand

Cloth Stand

18 nos Delivery: 20 days

Categories 5

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque

4

EFT Mandate certified by Bank

5

Data Sheet of offered products

6

Experience contracts/awards for 3 years minimum with central/state govt or PSU

7

OEM authorizations (if applicable)

Frequently Asked Questions

Key insights about HIMACHAL PRADESH tender market

How to bid for Indian Army tender in Chamba Himachal Pradesh 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and Data Sheet alignment with offered products. Demonstrate at least 3 years govt/PSU supply experience, and provide OEM authorizations if applicable. Ensure design drawings are approved within 5 days of award, with modification lists within 7 days.

What documents are required for the Chamba procurement of water dispensers?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, and Data Sheet of offered products. Provide contracts demonstrating 3 years of govt/PSU supply and OEM authorization if you are a reseller. Ensure GST compliance and vendor code creation proofs.

What standards or certifications are mandated for the stabilizer and washing machine items?

Tender requires data sheet alignment; specific standards are not listed. Suppliers should ensure the Data Sheet matches product specifications and be prepared to supply hardware and safety details for government inspection. OEM authorizations may be necessary for non-manufacturers.

When is the delivery period adjusted if the order quantity changes?

Delivery periods adjust with an option clause up to 25% additional quantity. Extended time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; delays due to design approvals may shift timelines without LD.

What are the eligibility criteria for the India Army procurement in 2026?

Applicants must show at least 3 years of govt/PSU supply experience for similar items, maintain financial stability (no liquidation), provide data sheets, and complete vendor code creation with PAN and GSTIN. OEM authorizations strengthen eligibility for non-manufacturers.

What is the required data for the product data sheet submission?

Submit a comprehensive Data Sheet matching the offered product specifications, including model numbers, capacities, power ratings, certifications, and installation requirements. Any mismatch can lead to bid rejection, so ensure alignment with the approved drawings.

What installation and commissioning requirements are specified in the bid?

Contract requires installation, commissioning, testing, and configuration. Detailed Design Drawings must be approved within 5 days of award; modifications must be provided within 7 days. On-time delivery depends on drawing approvals and post-approval execution readiness.

What is the estimated contract value and item scope for this tender?

Estimated value is ₹299,250 for six items including Stabilizer, Water Dispenser, Water Dispenser Bottle, Heat Pillar, Washing Machine, and Cloth Stand. The BOQ includes 6 items with unspecified quantities; contract may allow up to 25% quantity variation.

Advertisement