TenderDekho Logo
Closed GEM

NTPC Tamil Nadu Energy Company Ltd 2000TPH PCRD/CCRD Complete Assembly Tender Tamil Nadu 2026

Bid Publish Date

22-Sep-2026, 11:03 am

Bid End Date

03-Oct-2026, 6:00 pm

Location

TIRUVALLUR , TAMIL NADU

Progress

Issue22-Sep-2026, 11:03 am
AwardPending

Key Highlights

  • • Precisely named product assemblies: 2000TPH PCRD COMPLETE ASSY W/O MOTOR & SLIPRING and 2000TPH CCRD COMPLETE ASSY W/O MOTOR & SLIPRING
  • • Option clause allows +/-25% quantity adjustment at contract award and during currency at contracted rates
  • • Delivery period adjustments: (increased quantity / original quantity) × original delivery period with minimum 30 days
  • • ATC document uploaded by buyer; bidders must review for technical and contractual obligations

Tender Overview

Organization: NTPC Tamilnadu Energy Company Ltd. Procurement: 2000TPH: PCRD COMPLETE ASSY W/O MOTOR & SLIPRING and 2000TPH: CCRD COMPLETE ASSY W/O MOTOR & SLIPRING under the Contracts And Materials department. Location: Tamil Nadu. Estimated Value: Not disclosed; EMD: Not disclosed. Delivery flexibility: Purchaser may increase/decrease quantity up to 25%; extended delivery time equations apply with a minimum of 30 days. Context: high-capacity refinery/thermal plant assemblies require bulk manufacturing for PCRD/CCRD complete assemblies without drive components. Key differentiator: option clause enabling quantity fluctuation within contract at contracted rates. Unique aspect: BOQ shows zero items, suggesting a single-line or bundled scope via ATC-documented terms. The ATC document is referenced but not included here. This tender appears positioned for specialized equipment assemblies and standard compliance through purchaser-defined option mechanics. Keywords: tender in Tamil Nadu, NTPC Tamilnadu procurement.

Technical Specifications & Requirements

  • Product/service names: PCRD COMPLETE ASSEMBLY WITHOUT MOTOR & SLIPRING, CCRD COMPLETE ASSEMBLY WITHOUT MOTOR & SLIPRING (2000TPH each).
  • Quantity scope: Up to 25% quantity variation at contract award; possible extension during currency of contract.
  • Delivery terms: Delivery period adjustments based on option clause; calculated as (increased quantity / original quantity) × original delivery period, with minimum 30 days.
  • Standards/Testing: Not specified in data; ATC referenced but not provided.
  • BOQ status: 0 items; no detailed itemization available.
  • Vendor scope: Likely suppliers of machined assemblies for heavy-duty process units; installation motors/sliprings excluded.

Terms, Conditions & Eligibility

  • Option Clause: Quantity may be increased/decreased by up to 25% during/after contract; extended delivery timeline follows formula.
  • Delivery timeline: Calculations anchored to last delivery order date; additional time minimum 30 days.
  • ATC reference: Buyer uploaded ATC document; relevant terms to be reviewed prior bid submission.
  • BOQ: No items listed; bidders must rely on ATC for scope interpretation and acceptance.
  • EMD/Financials: Not disclosed in provided data; bidders should prepare standard EMD as per ATC and procurement norms.

Key Specifications

  • Product: PCRD COMPLETE ASSEMBLY WITHOUT MOTOR & SLIPRING (2000TPH)

  • Product: CCRD COMPLETE ASSEMBLY WITHOUT MOTOR & SLIPRING (2000TPH)

  • Quantity scope: +/- 25% per option clause

  • Delivery: minimum 30 days for extended period; calculation as described

  • BOQ: 0 items; relies on ATC for detailed specs

Terms & Conditions

  • Option clause enabling quantity variation up to 25% during contract

  • Delivery period adjustments computed by a defined formula with 30-day minimum

  • ATC document governs technical and contractual obligations for submission

Important Clauses

Payment Terms

Not specified in data; bidders should review ATC for milestones and payment schedule.

Delivery Schedule

Delivery commencement linked to the last date of original delivery order; extended time rules apply per option clause.

Penalties/Liquidated Damages

Not disclosed in provided data; to be clarified in ATC.

Bidder Eligibility

  • Proven experience in supplying large-scale turbine/process assemblies (PCRD/CCRD) without drive components

  • Demonstrated capability to manage bulk quantity variations up to 25%

  • Compliance with NTPC Tamilnadu Energy Company Ltd procurement procedures as per ATC

Advertisement

Authority & Contact

Department

Contracts and Materials

Office Name

Chennai

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

4

Category

M5590221455: 2000TPH: PCRD COMPLETE ASSY W/O MOTOR & SLIPRING

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

M5590221455: 2000TPH: PCRD COMPLETE ASSY W/O MOTOR & SLIPRING , M5590221456: 2000TPH: CCRD COMPLETE ASSY W/O MOTOR & SLIPRING

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Thiruvallur

Delivery Pincodes

600103

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kamal Gupta600103,NTPC Tamilnadu Energy Company Ltd. Vallur Thermal Power Project, PO Vellivoyal Chavadi, Ponneri Taluk, Thiruvallur District, Chennai 600103ThiruvallurTamil Nadu6001032120-

Authority Records

MINISTRY OF POWERNTPC TAMILNADU ENERGY COMPANY LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9852097.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar PCRD/CCRD assembly supply

4

Financial statements (last 2-3 years)

5

EMD submission as per ATC (amount not disclosed in data)

6

Technical bid documents demonstrating capability to supply 2000TPH assemblies

7

OEM authorization or manufacturer credentials (if applicable)

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for NTPC Tamil Nadu PCRD CCRD assemblies tender in Tamil Nadu 2026?

Bidders should review the ATC uploaded by NTPC, prepare GMP-compliant technical bid for PCRD CCRD assemblies (2000TPH) without motors/sliprings, submit GST, PAN, experience certificates, and financials, and ensure EMD as per ATC guidelines, plus adhere to option clause allowing +/-25% quantity changes.

What documents are required for NTPC Tamil Nadu procurement bid 2000TPH?

Required documents include GST certificate, PAN card, experience certificates for similar assemblies, financial statements, EMD documents, and OEM authorizations if applicable. Technical bid must demonstrate capability to supply 2000TPH PCRD/CCRD assemblies without drive components.

What are the delivery terms for the NTPC TN 2000TPH assemblies tender?

Delivery starts after the original delivery order date; extended delivery time follows the formula: (increased quantity / original quantity) × original period, with a mandatory minimum of 30 days. Option clause permits further extension within defined limits.

What is the role of ATC in NTPC Tamil Nadu PCRD CCRD tender?

ATC contains specific commercial and technical terms not fully shown here. Bidders must review the uploaded ATC to confirm scope, milestones, payment terms, EMD, and any brand/OEM requirements tied to the 2000TPH PCRD/CCRD assemblies.

What standards or testing requirements are specified for the NTPC TN tender?

No explicit standards are listed in the data; the ATC document is the source for testing, compliance, and quality requirements. Bidders should verify if ISO/IEC or industry-specific standards apply when preparing the technical bid.

How will quantity fluctuations impact contract value in NTPC Tamil Nadu tender?

Quantity may swing by up to 25%, with rates held constant at contract values. The extended delivery timeline follows a defined calculation, ensuring supply continuity while adjusting for larger or smaller orders within the same price framework.

What is the procurement location and organization for the 2000TPH assemblies?

The procurement is organized by NTPC Tamilnadu Energy Company Ltd under the Contracts and Materials department, with activities centered in Tamil Nadu. Bidders must align with state/regional procurement norms and portal submission guidelines.

Where can bidders view the full ATC and official terms for this NTPC tender?

The official ATC document is uploaded by the buyer in the tender portal. Bidders should access the portal, locate the ATC link referenced in the tender notice, and review all clauses prior to bid submission to ensure compliance.

Advertisement

Explore More Opportunities

Quick Access