TenderDekho Logo
GEM

Contract Bidding Open For Compute Nodes,GPU_AI Accelerator Cluster,Hot NVMe Storage Tier,WORM HSM Forensic Vault,Core Spine S in INDORE, MADHYA PRADESH

Bid Publish Date

16-Mar-2026, 10:54 am

Bid End Date

18-May-2026, 11:00 am

EMD

₹90,00,000

Generate Docs

Progress

Issue16-Mar-2026, 10:54 am
Corrigendum01-May-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

289

Category

Compute Nodes

Bid Type

Two Packet Bid

Categories 65

Indian Army has released a public tender for Compute Nodes, GPU_AI Accelerator Cluster, Hot NVMe Storage Tier, WORM HSM Forensic Vault, Core Spine Switch, Leaf Switches, TAP_Grid Packet Capture, SOC Fusion and Analytics Servers, Data Diode, SOC Command Center, R3 RF_SDR Kits, I3 HIL Racks, T3 AI_LM Simulation MLOps, Range Conductor, DarkWeb Intel Platform, Faraday Cage RF Isolation, Physical Security, Integration Cabling, 1st Year Critical Spares, Documentation and Training, SIEM Appliance, AIRGAPPED, USB Control over IP, DevLab Tools, Attack Research Kit, Layer 2 Switches, Desktop Computer_ Work Station, Wifi Router, Malware Sandbox cluster, Security and Assessment Testing Tool, Development Lab Tool, SCADA Simulation System, UPS 30 KVA with batteries, UPS 50 KVA with batteries, Raised Platform, Wooden Panelling and Glass Partition Works, Air Conditioner, Smart Rack, UTP Cable roll, Structured Cabling work, Earthing, Display Unit, Furniture, Data Wall with controller, Interactive Panel, Installation, Commissioning and Training, Provision of 05 _ Resident Engginers in INDORE, MADHYA PRADESH. Quantity: 289. Submission Deadline: 18-05-2026 11: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Compute Nodes , GPU_AI Accelerator Cluster , Hot NVMe Storage Tier , WORM HSM Forensic Vault , Core Spine Switch , Leaf Switches , TAP_Grid Packet Capture , SOC Fusion and Analytics Servers , Data Diode , SOC Command Center , R3 RF_SDR Kits , I3 HIL Racks , T3 AI_LM Simulation MLOps , Range Conductor , DarkWeb Intel Platform , Faraday Cage RF Isolation , Physical Security , Integration Cabling , 1st Year Critical Spares , Documentation and Training , SIEM Appliance , AIRGAPPED , USB Control over IP , DevLab Tools, Attack Research Kit , Layer 2 Switches , Desktop Computer_ Work Station , Wifi Router , Malware Sandbox cluster , Security and Assessment Testing Tool , Development Lab Tool , SCADA Simulation System , UPS 30 KVA with batteries , UPS 50 KVA with batteries , Raised Platform , Wooden Panelling and Glass Partition Works , Air Conditioner , Smart Rack , UTP Cable roll , Structured Cabling work , Earthing , Display Unit , Furniture , Data Wall with controller , Interactive Panel , Installation, Commissioning and Training , Provision of 05 _ Resident Engginers

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8858632.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 45 Items Sign in for GEM prices

#1

Compute Nodes

Compute Nodes (Cyber Range + Virtualization)

10 pieces Delivery: 180 days
#2

GPU_AI Accelerator Cluster

GPU/AI Accelerator Cluster (T3 Inference)

2 pieces Delivery: 180 days
#3

Hot NVMe Storage Tier

Hot NVMe Storage Tier

1 pieces Delivery: 180 days
#4

WORM HSM Forensic Vault

WORM + HSM Forensic Vault

1 pieces Delivery: 180 days
#5

Core Spine Switch

Core Spine Switch (100GbE, Hardened)

1 pieces Delivery: 180 days
#6

Leaf Switches

Leaf Switches (25/40GbE)

2 pieces Delivery: 180 days
#7

TAP_Grid Packet Capture

TAP/Grid + Packet Capture

1 pieces Delivery: 180 days
#8

SOC Fusion and Analytics Servers

SOC Fusion & Analytics Servers

4 pieces Delivery: 180 days
#9

Data Diode

Data Diode (One-Way Export)

1 pieces Delivery: 180 days
#10

SOC Command Center

SOC Command Center Fit-Out

1 pieces Delivery: 180 days
#11

R3 RF_SDR Kits

R3 RF/SDR Kits (Faraday Shielded)

6 pieces Delivery: 180 days
#12

I3 HIL Racks

I3 HIL Racks (OT/ICS Twin)

2 pieces Delivery: 180 days
#13

T3 AI_LM Simulation MLOps

T3 AI/LLM Simulation + MLOps

1 pieces Delivery: 180 days
#14

Range Conductor

Range Conductor (Orchestration)

1 pieces Delivery: 180 days
#15

DarkWeb Intel Platform

Dark-Web Intel Platform

1 pieces Delivery: 180 days
#16

Faraday Cage RF Isolation

Faraday Cage / RF Isolation

1 pieces Delivery: 180 days
#17

Physical Security

Physical Security (CCTV + Access Control)

1 pieces Delivery: 180 days
#18

Integration Cabling

Integration, Cabling, FAT/SAT

1 pieces Delivery: 180 days
#19

1st Year Critical Spares

1st Year Critical Spares

1 pieces Delivery: 180 days
#20

Documentation and Training

Documentation & Training

1 pieces Delivery: 180 days
#21

SIEM Appliance , AIRGAPPED

SIEM Appliance , AIRGAPPED

1 pieces Delivery: 180 days
#22

USB Control over IP

USB Control over IP

1 pieces Delivery: 180 days
#23

DevLab Tools, Attack Research Kit

DevLab Tools, Attack Research Kit

1 pieces Delivery: 180 days
#24

Layer 2 Switches

Layer 2 Switches (Manageable)

6 pieces Delivery: 180 days
#25

Desktop Computer_ Work Station

Desktop Computer/ Work Station

120 pieces Delivery: 180 days
#26

Wifi Router

Wifi Router

4 pieces Delivery: 180 days
#27

Malware Sandbox cluster

Malware Sandbox cluster

1 pieces Delivery: 180 days
#28

Security and Assessment Testing Tool

Security & Assessment Testing Tool

1 pieces Delivery: 180 days
#29

Development Lab Tool

Development Lab Tool

5 pieces Delivery: 180 days
#30

SCADA Simulation System

SCADA Simulation System

1 pieces Delivery: 180 days
#31

UPS 30 KVA with batteries

UPS 30 KVA with batteries

2 pieces Delivery: 180 days
#32

UPS 50 KVA with batteries

UPS 50 KVA with batteries

3 pieces Delivery: 180 days
#33

Raised Platform

Raised Platform (150 Square feet)

1 job Delivery: 180 days
#34

Wooden Panelling and Glass Partition Works

Wooden Panelling and Glass Partition Works (200 square feet)

1 job Delivery: 180 days
#35

Air Conditioner

Air Conditioner

16 pieces Delivery: 180 days
#36

Smart Rack

Smart Rack

4 pieces Delivery: 180 days
#37

UTP Cable roll

UTP Cable roll

50 roll Delivery: 180 days
#38

Structured Cabling work

Structured Cabling work (Job)

1 job Delivery: 180 days
#39

Earthing

Earthing (Job)

1 job Delivery: 180 days
#40

Display Unit

Display Unit

20 pieces Delivery: 180 days
#41

Furniture

Furniture (120 set)

1 pieces Delivery: 180 days
#42

Data Wall with controller

Data Wall with controller

1 pieces Delivery: 180 days
#43

Interactive Panel

Interactive Panel

4 pieces Delivery: 180 days
#44

Installation, Commissioning and Training

Installation, Commissioning and Training

1 job Delivery: 180 days
#45

Provision of 05 _ Resident Engginers

Provision of 05 x Resident Engginers

1 job Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

6 Updates
#1

Update

01-May-2026

Extended Deadline

18-May-2026, 11:00 am

Opening Date

18-May-2026, 11:30 am

#2

Update

10-Apr-2026
#3

Update

02-Apr-2026
#4

Update

02-Apr-2026

Extended Deadline

04-May-2026, 11:00 am

Opening Date

04-May-2026, 11:30 am

#5

Update

02-Apr-2026
#6

Update

17-Mar-2026