Bid Publish Date
16-Mar-2026, 10:54 am
Bid End Date
18-May-2026, 11:00 am
EMD
₹90,00,000
Location
Progress
Quantity
289
Category
Compute Nodes
Bid Type
Two Packet Bid
Indian Army has released a public tender for Compute Nodes, GPU_AI Accelerator Cluster, Hot NVMe Storage Tier, WORM HSM Forensic Vault, Core Spine Switch, Leaf Switches, TAP_Grid Packet Capture, SOC Fusion and Analytics Servers, Data Diode, SOC Command Center, R3 RF_SDR Kits, I3 HIL Racks, T3 AI_LM Simulation MLOps, Range Conductor, DarkWeb Intel Platform, Faraday Cage RF Isolation, Physical Security, Integration Cabling, 1st Year Critical Spares, Documentation and Training, SIEM Appliance, AIRGAPPED, USB Control over IP, DevLab Tools, Attack Research Kit, Layer 2 Switches, Desktop Computer_ Work Station, Wifi Router, Malware Sandbox cluster, Security and Assessment Testing Tool, Development Lab Tool, SCADA Simulation System, UPS 30 KVA with batteries, UPS 50 KVA with batteries, Raised Platform, Wooden Panelling and Glass Partition Works, Air Conditioner, Smart Rack, UTP Cable roll, Structured Cabling work, Earthing, Display Unit, Furniture, Data Wall with controller, Interactive Panel, Installation, Commissioning and Training, Provision of 05 _ Resident Engginers in INDORE, MADHYA PRADESH. Quantity: 289. Submission Deadline: 18-05-2026 11: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Compute Nodes , GPU_AI Accelerator Cluster , Hot NVMe Storage Tier , WORM HSM Forensic Vault , Core Spine Switch , Leaf Switches , TAP_Grid Packet Capture , SOC Fusion and Analytics Servers , Data Diode , SOC Command Center , R3 RF_SDR Kits , I3 HIL Racks , T3 AI_LM Simulation MLOps , Range Conductor , DarkWeb Intel Platform , Faraday Cage RF Isolation , Physical Security , Integration Cabling , 1st Year Critical Spares , Documentation and Training , SIEM Appliance , AIRGAPPED , USB Control over IP , DevLab Tools, Attack Research Kit , Layer 2 Switches , Desktop Computer_ Work Station , Wifi Router , Malware Sandbox cluster , Security and Assessment Testing Tool , Development Lab Tool , SCADA Simulation System , UPS 30 KVA with batteries , UPS 50 KVA with batteries , Raised Platform , Wooden Panelling and Glass Partition Works , Air Conditioner , Smart Rack , UTP Cable roll , Structured Cabling work , Earthing , Display Unit , Furniture , Data Wall with controller , Interactive Panel , Installation, Commissioning and Training , Provision of 05 _ Resident Engginers
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Compute Nodes
Compute Nodes (Cyber Range + Virtualization)
GPU_AI Accelerator Cluster
GPU/AI Accelerator Cluster (T3 Inference)
Hot NVMe Storage Tier
Hot NVMe Storage Tier
WORM HSM Forensic Vault
WORM + HSM Forensic Vault
Core Spine Switch
Core Spine Switch (100GbE, Hardened)
Leaf Switches
Leaf Switches (25/40GbE)
TAP_Grid Packet Capture
TAP/Grid + Packet Capture
SOC Fusion and Analytics Servers
SOC Fusion & Analytics Servers
Data Diode
Data Diode (One-Way Export)
SOC Command Center
SOC Command Center Fit-Out
R3 RF_SDR Kits
R3 RF/SDR Kits (Faraday Shielded)
I3 HIL Racks
I3 HIL Racks (OT/ICS Twin)
T3 AI_LM Simulation MLOps
T3 AI/LLM Simulation + MLOps
Range Conductor
Range Conductor (Orchestration)
DarkWeb Intel Platform
Dark-Web Intel Platform
Faraday Cage RF Isolation
Faraday Cage / RF Isolation
Physical Security
Physical Security (CCTV + Access Control)
Integration Cabling
Integration, Cabling, FAT/SAT
1st Year Critical Spares
1st Year Critical Spares
Documentation and Training
Documentation & Training
SIEM Appliance , AIRGAPPED
SIEM Appliance , AIRGAPPED
USB Control over IP
USB Control over IP
DevLab Tools, Attack Research Kit
DevLab Tools, Attack Research Kit
Layer 2 Switches
Layer 2 Switches (Manageable)
Desktop Computer_ Work Station
Desktop Computer/ Work Station
Wifi Router
Wifi Router
Malware Sandbox cluster
Malware Sandbox cluster
Security and Assessment Testing Tool
Security & Assessment Testing Tool
Development Lab Tool
Development Lab Tool
SCADA Simulation System
SCADA Simulation System
UPS 30 KVA with batteries
UPS 30 KVA with batteries
UPS 50 KVA with batteries
UPS 50 KVA with batteries
Raised Platform
Raised Platform (150 Square feet)
Wooden Panelling and Glass Partition Works
Wooden Panelling and Glass Partition Works (200 square feet)
Air Conditioner
Air Conditioner
Smart Rack
Smart Rack
UTP Cable roll
UTP Cable roll
Structured Cabling work
Structured Cabling work (Job)
Earthing
Earthing (Job)
Display Unit
Display Unit
Furniture
Furniture (120 set)
Data Wall with controller
Data Wall with controller
Interactive Panel
Interactive Panel
Installation, Commissioning and Training
Installation, Commissioning and Training
Provision of 05 _ Resident Engginers
Provision of 05 x Resident Engginers
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Compute Nodes | Compute Nodes (Cyber Range + Virtualization) | 10 | pieces | fce_projcoordinator | 180 | |
| 2 | GPU_AI Accelerator Cluster | GPU/AI Accelerator Cluster (T3 Inference) | 2 | pieces | fce_projcoordinator | 180 | |
| 3 | Hot NVMe Storage Tier | Hot NVMe Storage Tier | 1 | pieces | fce_projcoordinator | 180 | |
| 4 | WORM HSM Forensic Vault | WORM + HSM Forensic Vault | 1 | pieces | fce_projcoordinator | 180 | |
| 5 | Core Spine Switch | Core Spine Switch (100GbE, Hardened) | 1 | pieces | fce_projcoordinator | 180 | |
| 6 | Leaf Switches | Leaf Switches (25/40GbE) | 2 | pieces | fce_projcoordinator | 180 | |
| 7 | TAP_Grid Packet Capture | TAP/Grid + Packet Capture | 1 | pieces | fce_projcoordinator | 180 | |
| 8 | SOC Fusion and Analytics Servers | SOC Fusion & Analytics Servers | 4 | pieces | fce_projcoordinator | 180 | |
| 9 | Data Diode | Data Diode (One-Way Export) | 1 | pieces | fce_projcoordinator | 180 | |
| 10 | SOC Command Center | SOC Command Center Fit-Out | 1 | pieces | fce_projcoordinator | 180 | |
| 11 | R3 RF_SDR Kits | R3 RF/SDR Kits (Faraday Shielded) | 6 | pieces | fce_projcoordinator | 180 | |
| 12 | I3 HIL Racks | I3 HIL Racks (OT/ICS Twin) | 2 | pieces | fce_projcoordinator | 180 | |
| 13 | T3 AI_LM Simulation MLOps | T3 AI/LLM Simulation + MLOps | 1 | pieces | fce_projcoordinator | 180 | |
| 14 | Range Conductor | Range Conductor (Orchestration) | 1 | pieces | fce_projcoordinator | 180 | |
| 15 | DarkWeb Intel Platform | Dark-Web Intel Platform | 1 | pieces | fce_projcoordinator | 180 | |
| 16 | Faraday Cage RF Isolation | Faraday Cage / RF Isolation | 1 | pieces | fce_projcoordinator | 180 | |
| 17 | Physical Security | Physical Security (CCTV + Access Control) | 1 | pieces | fce_projcoordinator | 180 | |
| 18 | Integration Cabling | Integration, Cabling, FAT/SAT | 1 | pieces | fce_projcoordinator | 180 | |
| 19 | 1st Year Critical Spares | 1st Year Critical Spares | 1 | pieces | fce_projcoordinator | 180 | |
| 20 | Documentation and Training | Documentation & Training | 1 | pieces | fce_projcoordinator | 180 | |
| 21 | SIEM Appliance , AIRGAPPED | SIEM Appliance , AIRGAPPED | 1 | pieces | fce_projcoordinator | 180 | |
| 22 | USB Control over IP | USB Control over IP | 1 | pieces | fce_projcoordinator | 180 | |
| 23 | DevLab Tools, Attack Research Kit | DevLab Tools, Attack Research Kit | 1 | pieces | fce_projcoordinator | 180 | |
| 24 | Layer 2 Switches | Layer 2 Switches (Manageable) | 6 | pieces | fce_projcoordinator | 180 | |
| 25 | Desktop Computer_ Work Station | Desktop Computer/ Work Station | 120 | pieces | fce_projcoordinator | 180 | |
| 26 | Wifi Router | Wifi Router | 4 | pieces | fce_projcoordinator | 180 | |
| 27 | Malware Sandbox cluster | Malware Sandbox cluster | 1 | pieces | fce_projcoordinator | 180 | |
| 28 | Security and Assessment Testing Tool | Security & Assessment Testing Tool | 1 | pieces | fce_projcoordinator | 180 | |
| 29 | Development Lab Tool | Development Lab Tool | 5 | pieces | fce_projcoordinator | 180 | |
| 30 | SCADA Simulation System | SCADA Simulation System | 1 | pieces | fce_projcoordinator | 180 | |
| 31 | UPS 30 KVA with batteries | UPS 30 KVA with batteries | 2 | pieces | fce_projcoordinator | 180 | |
| 32 | UPS 50 KVA with batteries | UPS 50 KVA with batteries | 3 | pieces | fce_projcoordinator | 180 | |
| 33 | Raised Platform | Raised Platform (150 Square feet) | 1 | job | fce_projcoordinator | 180 | |
| 34 | Wooden Panelling and Glass Partition Works | Wooden Panelling and Glass Partition Works (200 square feet) | 1 | job | fce_projcoordinator | 180 | |
| 35 | Air Conditioner | Air Conditioner | 16 | pieces | fce_projcoordinator | 180 | |
| 36 | Smart Rack | Smart Rack | 4 | pieces | fce_projcoordinator | 180 | |
| 37 | UTP Cable roll | UTP Cable roll | 50 | roll | fce_projcoordinator | 180 | |
| 38 | Structured Cabling work | Structured Cabling work (Job) | 1 | job | fce_projcoordinator | 180 | |
| 39 | Earthing | Earthing (Job) | 1 | job | fce_projcoordinator | 180 | |
| 40 | Display Unit | Display Unit | 20 | pieces | fce_projcoordinator | 180 | |
| 41 | Furniture | Furniture (120 set) | 1 | pieces | fce_projcoordinator | 180 | |
| 42 | Data Wall with controller | Data Wall with controller | 1 | pieces | fce_projcoordinator | 180 | |
| 43 | Interactive Panel | Interactive Panel | 4 | pieces | fce_projcoordinator | 180 | |
| 44 | Installation, Commissioning and Training | Installation, Commissioning and Training | 1 | job | fce_projcoordinator | 180 | |
| 45 | Provision of 05 _ Resident Engginers | Provision of 05 x Resident Engginers | 1 | job | fce_projcoordinator | 180 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
18-May-2026, 11:00 am
Opening Date
18-May-2026, 11:30 am
Extended Deadline
04-May-2026, 11:00 am
Opening Date
04-May-2026, 11:30 am
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS