Tender Overview
The Indian Coast Guard, Department of Defence, seeks to procure an AC condenser pump, part number KGEC12-6B3, for installation in South Andaman, Andaman & Nicobar, 744101. The tender lacks explicit quantity and value details, but emphasizes pre-bid formalities and site compliance. A Portblair-registered bidder with serving staff is mandatory. The purchase involves a critical equipment item with confirmation required on compatibility with existing fittings during the pre-bid meeting. An option clause allows up to 25% quantity variation at contracted rates, with delivery timelines tied to the original schedule.
- Organization: Indian Coast Guard
- Location: South Andaman, Andaman & Nicobar, 744101
- Product: AC condenser pump, P/n KGEC12-6B3
- Key differentiator: mandatory pre-bid meeting and site-specific verification of pump specifications
- Unique aspect: modifications/welding for pipeline fitment to be categorized as part of the job
Technical Specifications & Requirements
- Item: AC condenser pump (P/n KGEC12-6B3); no public specifications provided
- Pre-bid meeting: attendance mandatory; certificate to be issued by ship post meeting
- Bidder capability: firm must have a registered office in Portblair with serving staff
- Verification: all pump specifications to be checked during pre-bid meeting; spare items must be compatible with fitted equipment
- Site considerations: AC condenser pump is critical; all details clarified in meeting
- Execution: any pipeline welding/modification required must be categorized with the job
- Delivery: price variation permitted for 25% higher quantity; delivery period begins from last date of original delivery order
- Compliance: bidders must align with the option clause and contract delivery timeline
Terms, Conditions & Eligibility
- EMD/security: not specified in available data
- Attendance: pre-bid meeting mandatory; non-attendance may lead to disqualification
- Office requirement: Portblair registered office with serving staff
- Technical validation: pump specifications to be confirmed at pre-bid; modifications to piping to be documented
- Variation: 25% quantity increase/decrease allowed at contracted rates during/after contract
- Compliance: bidders must comply with all terms stated in the Buyer Added Terms and ATC