TenderDekho Logo
Active GEM

Procurement Opportunity: Supply of GSKT.METALIC, 3 by 4 Inch, 316 SS,Supply of GSKT.METALIC, 1 Inch, 316 SS,Supply of GSKT.M in JHAJJAR, HARYANA

Bid Publish Date

05-Oct-2026, 4:26 pm

Bid End Date

16-Oct-2026, 3:00 pm

EMD

₹1,00,000

Value

₹45,32,970

Progress

Issue05-Oct-2026, 4:26 pm
AwardPending

Hindustan Petroleum Corporation Ltd announces a tender for Supply of GSKT. METALIC, 3 by 4 Inch, 316 SS, Supply of GSKT. METALIC, 1 Inch, 316 SS, Supply of GSKT. METALIC, 2 Inch, 316 SS, Supply of GSKT. METALIC, 3 Inch, 316 SS, Supply of GSKT. METALIC, 4 Inch, 316 SS, Supply of GSKT. METALIC, 6 Inch, 316 SS, Supply of GSKT. METALIC, 8 Inch, 316 SS, Supply of GSKT, METALIC. 10 Inch, 316 SS, Supply of GSKT, METALIC. 12 Inch, 316 SS, Supply of GSKT, METALIC. 14 Inch, 316 SS, Supply of GSKT, METALIC. 16 Inch, 316 SS, Supply of GSKT. METALIC. 18 Inch, 316 SS, Supply of GSKT. METALIC. 20 Inch, 316 SS, Supply of GSKT. METALIC. 24 Inch, 316 SS, SPLY OF NUT BOLT 12X70, SPLY OF NUT BOLT 16X110, SPLY OF NUT BOLT 20X110, SPLY OF NUT BOLT 22X150, SPLY OF NUT BOLT 24X150, SPLY OF NUT BOLT 28X160, Champion Gasket 3mm Thickness, Grade 54, Differential Pressure Gauge, Range upto 0 to 2 KG per Sq. CM, Glycerin filled Dial pressure gauge, range 0 to 25 Kg per Sq. Cm, Glycerin filled Dial pressure gauge, range 0 to 10 point 6 Kg Per Sq. Cm, Rubber Beading for tank Pontoons in JHAJJAR, HARYANA. Quantity: 8740. Submission Deadline: 16-10-2026 15: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

8740

Category

Supply of GSKT.METALIC, 3 by 4 Inch, 316 SS

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

7

OEM Avg. Turnover

7

Past Performance

40 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of GSKT.METALIC, 3 by 4 Inch, 316 SS , Supply of GSKT.METALIC, 1 Inch, 316 SS , Supply of GSKT.METALIC, 2 Inch , 316 SS , Supply of GSKT.METALIC, 3 Inch, 316 SS , Supply of GSKT.METALIC, 4 Inch , 316 SS , Supply of GSKT.METALIC ,6 Inch, 316 SS , Supply of GSKT.METALIC ,8 Inch, 316 SS , Supply of GSKT, METALIC.10 Inch, 316 SS , Supply of GSKT, METALIC.12 Inch, 316 SS , Supply of GSKT, METALIC.14 Inch, 316 SS , Supply of GSKT, METALIC.16 Inch, 316 SS , Supply of GSKT. METALIC.18 Inch, 316 SS , Supply of GSKT. METALIC.20 Inch, 316 SS , Supply of GSKT. METALIC.24 Inch, 316 SS , SPLY OF NUT BOLT 12X70 , SPLY OF NUT BOLT 16X110 , SPLY OF NUT BOLT 20X110 , SPLY OF NUT BOLT 22X150 , SPLY OF NUT BOLT 24X150 , SPLY OF NUT BOLT 28X160 , Champion Gasket 3mm Thickness, Grade 54 , Differential Pressure Gauge, Range upto 0 to 2 KG per Sq. CM , Glycerin filled Dial pressure gauge, range 0 to 25 Kg per Sq. Cm , Glycerin filled Dial pressure gauge, range 0 to 10 point 6 Kg Per Sq. Cm , Rubber Beading for tank Pontoons

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

27

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Jhajjar

Delivery Pincodes

124505

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dinesh Chand Meena124505,HINDUSTAN PETROLEUM CORPORATION LIMITED BAHADURGARH POL TERMINAL VILLAGE-ASAUDHA, DISTT- JHAJJAR BAHADURGARH, HARYANA-124505JhajjarHaryana12450550730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9958657.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

Supply of GSKT.METALIC, 3 by 4 Inch, 316 SS

Supply of GSKT.METALIC, 3 by 4 Inch, 316 SS

50 each Delivery: 730 days
#2

Supply of GSKT.METALIC, 1 Inch, 316 SS

Supply of GSKT.METALIC, 1 Inch, 316 SS

200 each Delivery: 730 days
#3

Supply of GSKT.METALIC, 2 Inch , 316 SS

Supply of GSKT.METALIC, 2 Inch , 316 SS

50 each Delivery: 730 days
#4

Supply of GSKT.METALIC, 3 Inch, 316 SS

Supply of GSKT.METALIC, 3 Inch, 316 SS

50 each Delivery: 730 days
#5

Supply of GSKT.METALIC, 4 Inch , 316 SS

Supply of GSKT.METALIC, 4 Inch , 316 SS

50 each Delivery: 730 days
#6

Supply of GSKT.METALIC ,6 Inch, 316 SS

Supply of GSKT.METALIC ,6 Inch, 316 SS

150 each Delivery: 730 days
#7

Supply of GSKT.METALIC ,8 Inch, 316 SS

Supply of GSKT.METALIC ,8 Inch, 316 SS

50 each Delivery: 730 days
#8

Supply of GSKT, METALIC.10 Inch, 316 SS

Supply of GSKT, METALIC.10 Inch, 316 SS

150 each Delivery: 730 days
#9

Supply of GSKT, METALIC.12 Inch, 316 SS

Supply of GSKT, METALIC.12 Inch, 316 SS

200 each Delivery: 730 days
#10

Supply of GSKT, METALIC.14 Inch, 316 SS

Supply of GSKT, METALIC.14 Inch, 316 SS

50 each Delivery: 730 days
#11

Supply of GSKT, METALIC.16 Inch, 316 SS

Supply of GSKT, METALIC.16 Inch, 316 SS

50 each Delivery: 730 days
#12

Supply of GSKT. METALIC.18 Inch, 316 SS

Supply of GSKT. METALIC.18 Inch, 316 SS

50 each Delivery: 730 days
#13

Supply of GSKT. METALIC.20 Inch, 316 SS

Supply of GSKT. METALIC.20 Inch, 316 SS

50 each Delivery: 730 days
#14

Supply of GSKT. METALIC.24 Inch, 316 SS

Supply of GSKT. METALIC.24 Inch, 316 SS

100 each Delivery: 730 days
#15

SPLY OF NUT BOLT 12X70

SPLY OF NUT BOLT 12X70

500 each Delivery: 730 days
#16

SPLY OF NUT BOLT 16X110

SPLY OF NUT BOLT 16X110

500 each Delivery: 730 days
#17

SPLY OF NUT BOLT 20X110

SPLY OF NUT BOLT 20X110

500 each Delivery: 730 days
#18

SPLY OF NUT BOLT 22X150

SPLY OF NUT BOLT 22X150

500 each Delivery: 730 days
#19

SPLY OF NUT BOLT 24X150

SPLY OF NUT BOLT 24X150

500 each Delivery: 730 days
#20

SPLY OF NUT BOLT 28X160

SPLY OF NUT BOLT 28X160

500 each Delivery: 730 days
#21

Champion Gasket 3mm Thickness, Grade 54

Champion Gasket 3mm Thickness, Grade 54

200 kg Delivery: 730 days
#22

Differential Pressure Gauge, Range upto 0 to 2 KG per Sq. CM

Differential Pressure Gauge, Range upto 0 to 2 KG per Sq. CM

20 each Delivery: 730 days
#23

Glycerin filled Dial pressure gauge, range 0 to 25 Kg per Sq. Cm

Glycerin filled Dial pressure gauge, range 0 to 25 Kg per Sq. Cm

70 each Delivery: 730 days
#24

Glycerin filled Dial pressure gauge, range 0 to 10 point 6 Kg Per Sq. Cm

Glycerin filled Dial pressure gauge, range 0 to 10 point 6 Kg Per Sq. Cm

200 each Delivery: 730 days
#25

Rubber Beading for tank Pontoons

Rubber Beading for tank Pontoons

4,000 meter Delivery: 730 days

Categories 24

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement