TenderDekho Logo
Closed GEM

Indian Army Armature Rewinding Labour Tender Gurudaspur Punjab 2025 – AVR Change & Field Coil Rewinding

Bid Publish Date

29-Oct-2025, 1:45 pm

Bid End Date

08-Nov-2025, 2:00 pm

Progress

Issue29-Oct-2025, 1:45 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Category

Armature Rewinding

Bid Type

Single Packet Bid

Categories 10

Tender Overview

The opportunity is issued by the Indian Army, Department Of Military Affairs, for services including armature rewinding, field coil rewinding, rectifier plate replacing, and AVR changes along with related labour charges. Location: GURDASPUR, PUNJAB – 143505. The BOQ lists 5 items but details are not disclosed; no start/end dates or estimated value are provided. The contract scope emphasizes technical capability to execute rewinding and related electrical repairs for defense-related assets. A key differentiator is the explicit option clause allowing up to a 25% quantity increase/decrease at contracted rates, with delivery calculations based on the original and extended periods. This tender requires bidders to adhere to the option clause and ensure timely delivery planning.

Technical Specifications & Requirements

  • Category includes: armature rewinding, field coil rewinding, rectifier plate replacements, AVR changes, and labour charge for related works.
  • 5 BOQ items exist, but specific item descriptions, quantities, and units are not provided.
  • No technical specifications are available in the data; bidders must rely on organizational guidance for scope and workmanship standards.
  • The clause highlights the need for readiness to execute complex rewinding tasks and AVR modifications under field conditions.
  • The absence of explicit start/end dates and estimated value requires bidders to prepare for potential variation in scope and schedule.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% of bid quantity at contract time and during currency.
  • Delivery time adjustments are calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • If original period is under 30 days, the extended time equals the original delivery period; extended duration may be up to the original delivery period.
  • Compliance with this option and related delivery calculations is mandatory for bidders.
  • No start date, end date, EMD, or estimated value details are provided in the data; bidders should anticipate standard army procurement documentation and provide complete, compliant bid packages.

Key Specifications

  • Product/Service names: armature rewinding, field coil rewinding, rectifier plate replacement, AVR change, labour charges

  • Estimated value and quantities: Not disclosed

  • Delivery/installation location: Gurudaspur, Punjab

  • Experience/eligibility: Demonstrated capability in rewinding and AVR work for electrical machinery

  • Quality/standards: Not specified in data; bidders should follow organization-specific standards

  • Warranty/AMC: Not specified in data; bidders should confirm post-work support terms

Terms & Conditions

  • 25% quantity variation at contract placement and during contract currency

  • Delivery period adjustments based on a formula with minimum 30 days

  • Mandatory compliance with option clause for all bidders

  • No explicit start/end dates or EMD value provided; bidders must prepare complete bid package

Important Clauses

Delivery Period Adjustment

Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extended duration may match the original period.

Quantity Variation

Purchaser may increase or decrease bid quantity up to 25% at placement and during currency at contracted rates.

Compliance

Bidders must comply with the option clause and delivery calculations as per buyer terms.

Bidder Eligibility

  • Proven experience in armature rewinding or related electrical repair work

  • Financial capability to undertake potential variation in scope

  • Ability to comply with defense procurement terms and safety requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Armature Rewinding , Field Coil Rewinding , Rectifier Plate replacing , AVR Change , Labour Charge

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8524787.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Armature Rewinding

Armature Rewinding

1 nos Delivery: 10 days
#2

Field Coil Rewinding

Field Coil Rewinding

1 nos Delivery: 10 days
#3

Rectifier Plate replacing

Rectifier Plate replacing

1 nos Delivery: 10 days
#4

AVR Change

AVR Change

1 nos Delivery: 10 days
#5

Labour Charge

Labour Charge

1 nos Delivery: 10 days

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for electrical rewinding/AVR work

4

Financial statements for last 2 fiscals

5

EMD/Security deposit details (if applicable in official terms)

6

Technical bid documents demonstrating capability for armature and field coil rewinding

7

OEM authorizations or certifications relevant to rewinding work

8

Any safety, quality, or compliance certificates relevant to defense service providers

Financial Results

Rank Seller Price Item
L1
S K TRADERS(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Armature Rewinding,Field Coil Rewinding,Rectifier Plate replacing,AVR Change,Labour Charge
L2
KHANNA TRADER (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Armature Rewinding,Field Coil Rewinding,Rectifier Plate replacing,AVR Change,Labour Charge
L3
RUDHRAKSH TRADING CO (MSE)( MSE Social Category:OBC )    Under PMA
Item Categories : Armature Rewinding,Field Coil Rewinding,Rectifier Plate replacing,AVR Change,Labour Charge

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for armature rewinding tender in Gurudaspur Punjab 2025

Bidders must submit GST, PAN, experience certificates, financial statements, and technical bid documents. The procurement allows up to 25% quantity variation at contract. Ensure AVR change, field coil rewinding, rectifier plate replacement capabilities, and compliance with defense safety standards. Prepare OEM authorizations if required.

What documents are required for Indian Army rewinding tender in Punjab

Required documents include GST registration, PAN, prior experience certificates in rewinding, financial statements for last two years, EMD details if applicable, technical compliance documents, and any OEM authorizations demonstrating capability for armature/field coil rewinding and AVR work.

What are the delivery terms for Gurudaspur armature rewinding tender

Delivery terms are governed by the option clause; quantity may vary by up to 25% and delivery period is adjusted by the formula (Increased/Original quantity) × Original period, with a minimum of 30 days. Ensure logistics planning aligns with extended periods if exercised.

What are the eligibility criteria for Indian Army rewinding services

Eligibility includes demonstrated rewinding experience, ability to deliver under defense procurement, financial stability, and compliance with safety regulations. Provide experience certificates and, if required, OEM authorizations and quality certifications to prove capability in armature/field coil rewinding and AVR work.

How to verify required specifications for rectifier plate replacement

Specifications are not detailed in the data; bidders should reference standard defense electrical repair practices and confirm compatibility with existing rectifier components during the AVR/rewinding process. Submit technical notes showing toolsets and procedures used.

When is the bid submission for Gurudaspur Army rewinding tender

Dates are not provided in the data. Bidders should monitor official tender portals and ensure all submission documents (GST, PAN, experience, financials, OEM authorizations) are ready. Prepare for potential extension as per 25% quantity variation clause.

What are payment terms for army rewinding service contracts

Payment terms are not specified in the data. Typical defense tenders require milestone-based payments upon completion of deliverables, with compliance verification. Bidders should seek explicit terms in the final RFP and ensure readiness for escrow or performance guarantees if mandated.

What are the key compliance standards for defense rewinding work

While no standards are listed, bidders should align with general defense workshop safety, electrical safety norms, and any organization-specific internal standards. Include safety certifications and quality control procedures in the technical bid to mitigate compliance risk.