Bid Publish Date
23-Jul-2026, 9:31 am
Bid End Date
03-Aug-2026, 10:00 am
Location
Progress
Quantity
48
Category
DRV PULLEY, 800X1400X160, PD/R-285433, CC-1
Bid Type
Two Packet Bid
The procurement is issued by the Rourkela Steel Plant (SBIIO) under its Steel Authority of India Limited framework for the supply of drive pulleys and heavy duty pulleys used on PC-2D & CC-1 conveyors and for belt widths of 1000 mm, 1200 mm, and 1600 mm. The order covers pulleys along with bearings, sleeves, and plummer blocks as per Drawing No. PDR-285433. Key requirements include submission of documentary evidence of pulley assembly, photos of press-fit operations, and confirmation of interference fit between hub and shaft with tolerance H6/p7. A 12-month warranty from installation or 18 months from supply applies. The engagement requires approval of drawings before manufacturing and adherence to the approved configuration, with potential delivery schedule adjustments if drawing approvals are delayed. The scope is strictly the supply of goods, with GST and invoicing aligned to consignee GSTIN. This tender emphasizes drawing-based manufacturing, quality verification, and post-supply support.
Keywords: tender in Odisha, Rourkela Steel Plant procurement, drive pulley PDR-285433, heavy duty pulley belt widths 1000 1200 1600, IS/ drawings compliant, GST invoice, PLUMMER BLOCKs, press-fit evidence.
Drive pulley for PC-2D & CC-1 conveyors must conform to Drawing No- PDR-285433
Heavy duty pulleys for belt widths 1000 mm, 1200 mm, 1600 mm with bearings, sleeves, plummer blocks installed
Fitting tolerance hub-to-shaft: H6/p7
Documentary evidence of pulley assembly with hydraulic press-fit readings
Warranty: 12 months from installation or 18 months from supply
EMD: not specified in available data; bidders should confirm on GeM portal
Delivery: driven by approved drawings; schedule adjustments possible for drawing delays
Payment terms: GST handling as per actuals; invoicing to consignee GSTIN
GST reimbursement as actuals or applicable rates; invoice in consignees name with consignor GSTIN; GST portal screenshot required
Delivery timeline may be refixed if drawing approval from Indenter is delayed; LD not applicable for buyer delay
Not specified in provided data; procurement requires strict adherence to approved drawings
Experience in supplying drive/heavy duty pulleys with mating components
GST registration and compliant invoicing to consignee GSTIN
Ability to submit approved drawings and documentary assembly evidence
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
DRV PULLEY, 800X1400X160, PD/R-285433, CC-1 , HEAVY DUTY PULLEY FOR 1200 MM WIDTH BELT , HEAVY DUTY PULLEY FOR 1000 MM WIDTH BELT , HEAVY DUTY PULLEY, WITH PLUMMER BLOCK, BE
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
145
Delivery Locations
1
Delivery Cities
Kendujhar
Delivery Pincodes
758037
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mrutyunjaya Swain | 758037,SAIL-RSP BOLANI ORES MINES, BOLANI | Kendujhar | Odisha | 758037 | 2 | 145 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate of bidder
PAN card of bidder
Experience certificates for similar pulley supply
Financial statements or solvency proof
EMD/Security deposit documentation (as applicable by GeM terms)
Technical bid documents including Data Sheet
OEM authorizations or drawings approvals (PDR-285433) where applicable
Bidders must submit GSTIN, PAN, Data Sheet, and technical drawings; provide documentary evidence of pulley assembly per Drawing No. PDR-285433; ensure hub-to-shaft fit tolerance H6/p7 and obtain Indenter approval within 15 days of award. GeM-based submission and compliance with GST invoicing are mandatory.
Required documents include GST certificate, PAN, experience certificates for similar pulley supply, financial statements, EMD documentation, technical bid with Data Sheet, OEM authorizations, and drawings approvals (PDR-285433) for verification and conformity.
Manufacturing must follow Drawing No. PDR-285433; hub-to-shaft interference fit must satisfy H6/p7 tolerances, with press-fit verification photos and gauge readings; pulleys delivered with bearings, sleeves, and plummer blocks in fitted condition.
Detailed Design Drawings must be submitted within 15 days of award; the buyer will approve or issue modifications within 10 days; delays may adjust the delivery schedule with no LD for Buyer delays.
The warranty extends 12 months from the date of installation or 18 months from the date of supply, whichever occurs earlier, ensuring post-supply support and defect resolution.
Invoices must be raised in the consignee name with the consignee GSTIN; upload scanned GST invoice and a GST portal payment screenshot on GeM; GST reimbursement is as per actuals or applicable rates, up to quoted GST percentage.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS