TenderDekho Logo
Closed GEM

Hindustan Petroleum Corporation Ltd RTU Supply MSS-11 Substation Tender 2025 - MSS-11 RTU Config Testing & Commissioning

Bid Publish Date

07-Nov-2025, 11:20 am

Bid End Date

20-Nov-2025, 12:00 pm

Generate Docs

Progress

Issue07-Nov-2025, 11:20 am
Technical20-11-2025 10:43:20
Financial
Award11-Apr-2026, 5:27 pm
Explore all 4 tabs to view complete tender details

Quantity

2

Category

Supply of Remote Terminal Unit for MSS-11 Substation. Refer attached document Annexure-1 RTU Confi

Bid Type

Two Packet Bid

Key Highlights

  • Detailed option clause enabling ±25% quantity variation during contract.

Categories 14

Tender Overview

Hindustan Petroleum Corporation Ltd seeks Remote Terminal Unit (RTU) supply for the MSS-11 Substation with associated configuration, testing, and commissioning as per Annexure-1. The tender scope focuses on RTU procurement and integration under HPCL’s grid automation initiative. The buyer reserves an option to increase or decrease quantity by up to 25% of bid quantity at contract placement and during the currency of the contract at contracted rates. Delivery timeframe will adjust based on the extended period formula, with a minimum extension of 30 days. The opportunity is positioned within HPCL’s electrical infrastructure modernization and requires robust RTU functionality linked to MSS-11 control schemes. Unique clause emphasizes flexible quantity handling and schedule adjustments in response to project needs.

Technical Specifications & Requirements

  • No technical specifications are published in the tender summary; reference is made to Annexure-1 for RTU configuration, testing, and commissioning of the RTU panel at MSS-11.
  • The scope includes supply of RTU hardware compatible with MSS-11, and integration support for field testing and commissioning activities as described in Annexure-1.
  • No BOQ items available; bidders should rely on Annexure-1 for exact bill of quantities, interface protocols, communication standards, and panel layout.
  • Bidder should anticipate interface with existing MSS-11 infrastructure and adhere to project-specific testing procedures outlined in the ATC amendment.
  • Given missing explicit standards, bidders must confirm OEM compatibility and propose fault-tolerant, remote communication capabilities aligned with typical MSS substation automation practices.

Terms, Conditions & Eligibility

  • Quantity adjustments allowed up to 25% of bid quantity at contract award and during the currency of contract.
  • Extended delivery period calculation: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
  • Deliveries may be extended to match original delivery period when exercising the option clause.
  • Bidder compliance with these option clause terms is mandatory.
  • Specific EMD, payment terms, and detailed eligibility criteria are to be defined in the final contract and accompanying ATC documents.

Key Specifications

  • Product/service names: Remote Terminal Unit (RTU) for MSS-11 Substation

  • Quantities: Not specified in BOQ; subject to Annexure-1 details

  • Estimated value: Not disclosed

  • Experience requirements: Prior RTU/SCADA deployment experience implied by annexure

  • Quality/standards: Not specified in tender text; confirm OEM compatibility and interoperability

  • Delivery/installation: Commissioning included per Annexure-1

  • Warranty/AMC: Not specified in tender data

Terms & Conditions

  • Quantity adjustment up to 25% during contract and currency

  • Delivery period extensions follow a calculated formula with 30-day minimum

  • Annexure-1 governs RTU configuration, testing and commissioning

Important Clauses

Payment Terms

Not specified in tender summary; to be defined in contract and ATC documents, align with HPCL standard procurement payments

Delivery Schedule

Delivery period extends from the last date of original delivery order; extended period follows option clause formula with minimum 30 days

Penalties/Liquidated Damages

Not detailed in provided data; to be defined in final contract/ATC

Bidder Eligibility

  • Demonstrated RTU/SCADA deployment experience relevant to substation automation

  • Financial stability as evidenced by recent financial statements

  • Ability to comply with Annexure-1 RTU configuration, testing and commissioning requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Remote Terminal Unit for MSS-11 Substation. Refer attached document Annexure-1 RTU Confi , Testing and Commissioning of RTU Panel at MSS-11.

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8550000.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for RTU/SCADA deployments

4

Financial Statements (last 2-3 years)

5

EMD/Security Deposit documents (as per contract terms)

6

Technical Compliance Certificates (OEM authorizations, if applicable)

7

OEM Authorization/Dealership Certificates (where required)

8

Past project completion certificates relevant to RTU/SCADA at substations

9

Any ATC/ATC amendments referenced in Buyer Uploaded ATC document

Corrigendum Updates

1 Update
#1

Update

17-Nov-2025

Extended Deadline

20-Nov-2025, 12:00 pm

Opening Date

20-Nov-2025, 12:30 pm

Technical Results

S.No Seller Item Date Status
1
SCHNEIDER ELECTRIC INFRASTRUCTURE LIMITED   Under PMA
Make : Schneider electric Model : T500 Title : Supply of Remote Terminal Unit for MSS-11 Substation. Refer attached document Annexure-1 RTU Confi20-11-2025 10:43:20

Financial Results

Rank Seller Price Item
L1
SCHNEIDER ELECTRIC INFRASTRUCTURE LIMITED   Under PMA
Item Categories : Supply of Remote Terminal Unit for MSS-11 Substation. Refer attached document Annexure-1 RTU Confi,

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the RTU MSS-11 tender in HPCL 2025

Bidders should review Annexure-1 for RTU configuration, testing and commissioning scope. Prepare GST, PAN, experience certificates, financial statements, and OEM authorizations. Ensure capability for MSS-11 panel integration and submit EMD as prescribed in ATC. Verify option clause permits 25% quantity variation.

What documents are required for HPCL RTU procurement bid 2025

Required documents include GST registration, PAN, up-to-date financial statements, experience certificates for RTU deployments, EMD/security deposit, OEM authorization where applicable, and technical bid documents. Ensure copies of past RTU/SCADA project completion certificates are included to demonstrate capability.

What are the delivery terms for HPCL MSS-11 RTU supply

Delivery starts from the last date of the original delivery order. If the option clause is exercised, the delivery period extends per the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension.

What standards or interoperability requirements apply to HPCL RTU

The tender references Annexure-1 for RTU configuration; while explicit standards are not listed, bidders should propose OEM-compatible RTU hardware with reliable MSS-11 interoperability, and confirm compatibility with typical substation automation protocols and testing procedures.

How is the 25% quantity adjustment applied in HPCL RTU bid

The buyer may increase or decrease quantity by up to 25% at contract placement and during the contract period at contracted rates. The extension calculation uses the increased-to-original quantity ratio with a minimum 30-day extension, ensuring schedule flexibility.

What documents confirm eligibility for HPCL RTU procurement

Eligibility is demonstrated through past RTU/SCADA deployment experience, financial stability (recent statements), GST and PAN validity, OEM authorizations if required, and technical bid alignment with Annexure-1 RTU configuration, testing and commissioning requirements.

Where can I find RTU configuration details for MSS-11

RTU configuration details, testing and commissioning scope are specified in Annexure-1 of the tender. Bidders should obtain and review this ATC document to align hardware, interfaces, and commissioning procedures with MSS-11 requirements.