TenderDekho Logo
Active GEM

RINL Vizag Steel Screw & Nut for Guide Clamping Tender Visakhapatnam Andhra Pradesh 2026

Bid Publish Date

03-Oct-2026, 2:33 pm

Bid End Date

17-Oct-2026, 3:00 pm

Generate Docs

Progress

Issue03-Oct-2026, 2:33 pm
Corrigendum13-Oct-2026
AwardPending

Tender Overview

Rashtriya Ispat Nigam Limited (RINL) invites bids for screw for guide clamping and nut for guide clamping to support Vizag Steel operations in Visakhapatnam, Andhra Pradesh. The tender imposes a permissible quantity variation of up to 25% of the bid quantity both at the time of contract and during the contract period, with extension logic tied to original quantities and delivery periods. Bidder must comply with RINL’s ATC restricting scope changes, and offer must align with bidder-provided Make/Model and technical catalogues. Documentation should include test certificates from Govt/Govt-approved labs, NABL, or the bidder’s ISO-certified facility. Delivery schedules are strictly as indicated; deviations are not entertained. Bid evaluation will consider conformity to the ATC and timing commitments. This is a targeted procurement in a specialized category, with no BOQ items available, highlighting the need for precise technical alignment and rigorous supplier qualification.

Technical Specifications & Requirements

  • Product category: Screw for guide clamping; Nut for guide clamping
  • Documentation: Test Certificate (TC) from Govt/Govt-approved Lab OR NABL accredited Lab OR Manufacturer’s own lab if ISO-certified
  • Make/Model disclosure: Bidder must specify exact Make/Model and upload technical catalogues/brochures; deviations will be rejected
  • Delivery: Offers must strictly follow the delivery schedule; no deviations accepted; tentative delivery per LOA/GEM order, with potential rescheduling by RINL-VSP
  • Quality/Compliance: Adherence to the ATC content; no change in scope will be considered; supply alignment with offered specifications
  • Additional terms: The ATC emphasizes conformity to bidder offers as evaluated; non-aligned catalog content may be rejected

Terms, Conditions & Eligibility

  • Delivery extension/quantity option: Up to 25% increase in quantity during contract; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • ATC conformity: Only offers meeting RINL-VSP ATC provisions will be considered; no scope changes
  • Acceptance of schedule: Tentative schedules issued by RINL-VSP to be followed; schedule may be revised due to production/storage needs
  • Documentation for submission: Include Make/Model, technical catalogues, and TC/NABL/ISO-compliant lab certificates
  • Delivery terms: Delivery commences from LOA/GEM order date; extended periods may apply per option clause
  • Vendor qualification: Bidders must comply with all ATC conditions and provide evidence of required lab certifications and ISO status

Key Specifications

  • Product: Screw for guide clamping; Nut for guide clamping

  • Delivery schedule strictly as per LOA/GEM order; no deviation accepted

  • Test Certificate: Govt/Govt approved Lab OR NABL accredited OR Manufacturer’s own lab (ISO-certified company)

  • Make/Model must be specified with technical catalogues uploaded

  • No scope change requests will be entertained

Terms & Conditions

  • 25% quantity variation permitted during contract; extended delivery time calculated with minimum 30 days

  • ATC compliance mandatory; deviations in delivery or scope not allowed

  • Delivery schedule and TC/ISO/NABL certifications required for bid submission

Important Clauses

Delivery Terms

Offers must adhere to the delivery schedule; no deviation accepted; RINL-VSP may revise delivery timelines based on production/storage without financial implications

Test Certificates

TC from Govt/Govt-approved Lab OR NABL accredited Lab OR Manufacturer's own Lab (if ISO-certified) required

Variation in Quantity

Option clause allows up to 25% increase in quantity during contract and currency; delivery period adjusted accordingly

Bidder Eligibility

  • Proven experience in supplying similar clamps components

  • Valid ISO certification or equivalent laboratory accreditation

  • Ability to meet delivery schedule with Make/Model specificity

Advertisement

Tender Data

Bid Details

Quantity

400

Category

SCREW FOR GUIDE CLAMPING

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SCREW FOR GUIDE CLAMPING , NUT FOR GUIDE CLAMPING

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Visakhapatanam

Delivery Pincodes

530031

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Chikkala Madhu Sudana Rao530031,CENTRAL STORES BUILDING VISAKHAPATNAM STEEL PLANTVisakhapatanamAndhra Pradesh530031200120-

Authority Records

MINISTRY OF STEELRASHTRIYA ISPAT NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9942554.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Visakhapatnam Steel Plant

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

13-Oct-2026

Extended Deadline

17-Oct-2026, 9:30 am

Opening Date

18-Oct-2026, 9:30 am

Advertisement

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply

4

Financial statements (last 1-2 years)

5

EMD/Security deposit documentation (as applicable)

6

Technical bid documents and bid-specific catalogues

7

OEM authorizations (if applicable)

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for guide clamp screws tender in Visakhapatnam 2026

Bidders must submit GST, PAN, experience certificates, financial statements, EMD, and technical catalogues. Ensure Make/Model is specified with catalogues, and attach TC from a NABL or ISO-certified lab. Delivery must align with LOA dates, and price must reflect the 25% quantity variation provision.

What documents are required for guide clamp nuts procurement in Vizag

Required documents include GST certificate, PAN, prior supply experience certificates, financial statements, EMD documentation, OEM authorizations (if applicable), and technical bid with Make/Model and product brochures. Lab test certificates must be from NABL or Govt-approved labs or ISO-certified facilities.

What are the delivery terms for RINL Vizag clamp components tender

Delivery must follow the LOA/GEM order date with no deviation. The option clause allows up to 25% quantity variation, and extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What standards and certifications are required for clamp component bids

Bids require Test Certificates from Govt/Govt-approved labs or NABL, or from the manufacturer if the company is ISO-certified. Ensure ISO status is clearly stated and the lab certificate matches the tender's technical scope.

How is the 25% quantity variation applied in this tender

The purchaser may increase quantity up to 25% at contract placement and during the currency of the contract at contracted rates. Delivery extension is proportionate, with a minimum extension of 30 days per the option clause.

What is the role of Make/Model in the Visakhapatnam clamp tender

Bidders must specify exact Make/Model and upload corresponding technical catalogues. Supply of other than offered Make/Model will be rejected, and no contradictions with catalog content will be considered during evaluation.

When will the delivery schedule be finalized for RINL Visakhapatnam

Delivery schedule is tentatively indicated by RINL-VSP and may be revised based on production/storage needs. Final delivery dates depend on LOA, GEM order, and the bidder’s adherence to the stated schedule.

Advertisement