Bid Publish Date
18-Oct-2026, 6:53 pm
Bid End Date
02-Nov-2026, 7:00 pm
Location
Progress
The opportunity is a procurement tender from the Urban Development And Environment Department for an Outdoor/Indoor Fountain in RAISEN, MADHYA PRADESH (464551). Although the exact quantity, BOQ items, and estimated value are not disclosed, the contract includes an option to adjust quantities by up to 25%, with extension logic tied to original delivery timelines. Bidders must ensure compliance with mandatory certifications and material testing requirements. The tender emphasizes ISO 9001 certification for the bidder or OEM and requires submission of specified certificates. The unique aspect is the option-based delivery adjustment and the lab-based acceptance criterion for materials, which affects acceptance and payment milestones.
EMD amount not disclosed in provided data; prepare per ATC
Delivery period extends with option clause, minimum 30 days
ISO 9001 certification mandatory for bidder or OEM
Material Test Certificate required; buyer lab results govern acceptance
Not explicitly stated; bidders should align with standard government payment practices and terms suggested in ATC
Delivery begins after last date of original delivery order; option clause allows up to 25% quantity variation with calculated extended delivery time, minimum 30 days
Not specified in available data; ensure compliance with standard L.D. provisions in ATC
Must hold ISO 9001 certification (bidder or OEM)
Must submit Material Test Certificate with supply
Must upload all required certificates as per Bid Document/ATC/Corrigendum
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
9
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Outdoor / Indoor Fountain (Q3)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Raisen
Delivery Pincodes
464551
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Awadhesh Bahadur Singh | 464551,NAGAR PALIKA RAISEN NEAR MAHAMAYA CHOCK WARD NO 07 RAISEN | Raisen | Madhya Pradesh | 464551 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
02-Nov-2026, 1:30 pm
Opening Date
03-Nov-2026, 1:30 pm
Extended Deadline
31-Oct-2026, 1:30 pm
Opening Date
01-Nov-2026, 1:30 pm
Discover companies most likely to bid on this tender
GST registration
PAN card
ISO 9001 certification (bidder or OEM)
Material Test Certificate to accompany supply
OEM authorization (if applicable)
Technical bid documents (as per ATC)
Any certificates or documents requested in Bid document/ATC/Corrigendum
Key insights about MADHYA PRADESH tender market
Bidders must be ISO 9001 certified (bidder or OEM) and submit a Material Test Certificate with the bid. Ensure all certificates are uploaded per ATC/Corrigendum. The tender allows up to 25% quantity variation and requires compliance with the delivery time formula, minimum 30 days.
Required documents include GST registration, PAN, ISO 9001 certificate, Material Test Certificate, OEM authorization if applicable, and technical bid documents as per ATC. Upload all certificates with the bid; incomplete submissions may lead to rejection.
Delivery starts after the original delivery order date; quantity can vary up to 25% during contract, with extended delivery time calculated as (Additional quantity ÷ Original quantity) × Original period, minimum 30 days. Ensure readiness for site delivery and installation schedules.
The bidder or OEM must have ISO 9001 certification. A Material Test Certificate must accompany the supply, and the buyer’s lab results will be the sole criterion for acceptance, making quality assurance critical before shipment.
The purchaser can increase or decrease the quantity by up to 25% at award and during the currency at contracted rates. Bidders should price flexibly to accommodate scale-up or down without major renegotiation, factoring in delivery-time adjustments.
The ATC document outlines bidder-specific terms. Compliance with ATC is mandatory; non-compliance may result in bid rejection. Ensure all terms are incorporated into the bid and certificates match ATC requirements.
Material acceptance relies on the buyer’s lab testing; the Material Test Certificate is mandatory, and lab results will determine item acceptance. Prepare materials meeting ISO 9001 quality management expectations and perform pre-shipment testing.
If the original delivery period is under 30 days, the extended time due to quantity variation equals the original delivery period, ensuring a predictable timeline. Bidders should plan around this for production and logistics readiness.