TenderDekho Logo
Active GEM

Government Tender Published for Supply of Armoured Power cable Copper material,Supply of Armoured OFC,Supply of armoured signal Cab in GONDA, UTTAR PRADESH

Bid Publish Date

26-Aug-2026, 1:21 pm

Bid End Date

16-Sep-2026, 1:00 pm

Location

GONDA , UTTAR PRADESH

Progress

Issue26-Aug-2026, 1:21 pm
AwardPending

Public procurement opportunity for Bharat Petroleum Corporation Ltd Supply of Armoured Power cable Copper material, Supply of Armoured OFC, Supply of armoured signal Cable, Supply of FLP JB with Glands, Laying of Cable, Supply, installation and commissioning of GI Pole, Supply and Laying ofPVC conduits, Soil Excavation, Rcc for foundation of Light pole, Steel Reinforcement, PCC below foundation of light pole, Supply Fabrication and Erection of FLP JB Steel Stand in GONDA, UTTAR PRADESH. Quantity: 15019 issued by. Submission Deadline: 16-09-2026 13: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

15019

Category

Supply of Armoured Power cable Copper material

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

16

OEM Avg. Turnover

33

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Armoured Power cable Copper material , Supply of Armoured OFC , Supply of armoured signal Cable , Supply of FLP JB with Glands , Laying of Cable , Supply, installation and commissioning of GI Pole , Supply and Laying ofPVC conduits , Soil Excavation , Rcc for foundation of Light pole , Steel Reinforcement , PCC below foundation of light pole , Supply Fabrication and Erection of FLP JB Steel Stand

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Gonda

Delivery Pincodes

271001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Niraj Kumar Chaudhary271001,Janki Nagar, Bahraich Road , GondaGondaUttar Pradesh2710013000120-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9809069.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

Supply of Armoured Power cable Copper material

Supply of Armoured Power cable 3C x 1.5 sqmm Copper material

3,000 m Delivery: 120 days
#2

Supply of Armoured OFC

Supply of Armoured OFC 6 Core

3,000 m Delivery: 120 days
#3

Supply of armoured signal Cable

Supply of armoured Cat 6 Cable

500 m Delivery: 120 days
#4

Supply of FLP JB with Glands

Supply of FLP JB with Glands

20 no Delivery: 120 days
#5

Laying of Cable

Laying of Cable

3,000 m Delivery: 120 days
#6

Supply, installation and commissioning of GI Pole

Supply, installation and commissioning of 5 meter GI Pole

30 no Delivery: 120 days
#7

Supply and Laying ofPVC conduits

Supply and Laying of 25 mm PVC conduits 2 mm thick

3,000 m Delivery: 120 days
#8

Soil Excavation

Excavation Depth upto 0.5 M normal soil

460 m3 Delivery: 120 days
#9

Rcc for foundation of Light pole

Rcc (1 1.5 3) for foundation of Light pole

8 m3 Delivery: 120 days
#10

Steel Reinforcement

Steel Reinforcement

500 kg Delivery: 120 days
#11

PCC below foundation of light pole

PCC (1 4 8) below foundation of light pole

1 m3 Delivery: 120 days
#12

Supply Fabrication and Erection of FLP JB Steel Stand

Supply, Fabrication and Erection of FLP JB Steel Stand

1,500 kg Delivery: 120 days

Categories 40

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer