TenderDekho Logo
Closed GEM

Government Tender Published for Motor Protection Circuit Breaker,Motor Protection Circuit Breaker,Motor Protection Circuit Breaker, in BHOPAL, MADHYA PRADESH

Bid Publish Date

01-Dec-2025, 12:23 pm

Bid End Date

26-Dec-2025, 4:00 pm

Progress

Issue01-Dec-2025, 12:23 pm
Technical26-12-2025 15:02:29
Financial
Award20-Apr-2026, 6:11 pm
Explore all 4 tabs to view complete tender details

Quantity

30543

Category

Motor Protection Circuit Breaker

Bid Type

Two Packet Bid

Categories 38

A tender has been published for Indian Space Research Organization Motor Protection Circuit Breaker, CABLE DUCTS WITH COVER, Cable Ties, Miniature Circuit Breakers, Single Phase Preventer, Power Contactor, Cable End Lugs, TERMINAL lugs Pin Type, TERMINAL lugs Ring Type, Cage Clamp Terminal connector, End covers, Shorting links, Partition plates, Zack marker strip, DIN Rails, Cables, Toggle Switch, Emergency Stop switch with box, Emergency Stop switch without box, Steel wire Reinforced PVC flexible pipe in BHOPAL, MADHYA PRADESH. Quantity: 30543 by. Submission Deadline: 26-12-2025 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Motor Protection Circuit Breaker , CABLE DUCTS WITH COVER , Cable Ties , Miniature Circuit Breakers , Single Phase Preventer , Power Contactor , Cable End Lugs , TERMINAL lugs Pin Type , TERMINAL lugs Ring Type , Cage Clamp Terminal connector , End covers , Shorting links , Partition plates , Zack marker strip , DIN Rails , Cables , Toggle Switch , Emergency Stop switch with box , Emergency Stop switch without box , Steel wire Reinforced PVC flexible pipe

Authority Records

SPACE DEPARTMENTINDIAN SPACE RESEARCH ORGANIZATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8613623.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 67 Items Sign in for GEM prices

#1

Motor Protection Circuit Breaker

4.0-6.3 Amps

15 nos Delivery: 45 days
#2

Motor Protection Circuit Breaker

2.5-4.0 Amps

15 nos Delivery: 45 days
#3

Motor Protection Circuit Breaker

1.6-2.5 Amps

15 nos Delivery: 45 days
#4

CABLE DUCTS WITH COVER

25 mm X 25 mm

60 nos Delivery: 45 days
#5

CABLE DUCTS WITH COVER

40 mm X 40mm

60 nos Delivery: 45 days
#6

CABLE DUCTS WITH COVER

60 mm X 60mm

40 nos Delivery: 45 days
#7

Cable Ties

96.0mm x 2.5 mm

1,000 nos Delivery: 45 days
#8

Cable Ties

102.0mm x 3.6 mm

1,000 nos Delivery: 45 days
#9

Cable Ties

160.0mm x 2.6mm

1,000 nos Delivery: 45 days
#10

Cable Ties

250.0mm x 4.8 mm

1,000 nos Delivery: 45 days
#11

Cable Ties

300.0mm x 4.8 mm

1,000 nos Delivery: 45 days
#12

Cable Ties

400.0mm x 7.6 mm

1,000 nos Delivery: 45 days
#13

Miniature Circuit Breakers

32 Amps

10 nos Delivery: 45 days
#14

Miniature Circuit Breakers

25 Amps

10 nos Delivery: 45 days
#15

Miniature Circuit Breakers

16 Amps

15 nos Delivery: 45 days
#16

Miniature Circuit Breakers

10 Amps

20 nos Delivery: 45 days
#17

Miniature Circuit Breakers

6 Amps

20 nos Delivery: 45 days
#18

Single Phase Preventer

Single Phase Preventer

4 nos Delivery: 45 days
#19

Power Contactor

Power Contactor

40 nos Delivery: 45 days
#20

Cable End Lugs

18 AWG

4,500 nos Delivery: 45 days
#21

Cable End Lugs

20 AWG

4,500 nos Delivery: 45 days
#22

Cable End Lugs

24 AWG

4,500 nos Delivery: 45 days
#23

Cable End Lugs

26 AWG

3,000 nos Delivery: 45 days
#24

TERMINAL lugs Pin Type

1.5 Sq mm

1,000 nos Delivery: 45 days
#25

TERMINAL lugs Pin Type

2.5 Sq mm

1,000 nos Delivery: 45 days
#26

TERMINAL lugs Pin Type

4.0 Sq mm

700 nos Delivery: 45 days
#27

TERMINAL lugs Ring Type

1.5 Sq mm

700 nos Delivery: 45 days
#28

TERMINAL lugs Ring Type

2.5 Sq mm

700 nos Delivery: 45 days
#29

TERMINAL lugs Ring Type

4.0 Sq mm

700 nos Delivery: 45 days
#30

Cage Clamp Terminal connector

0.08 to 1.5 Sqmm

1,000 nos Delivery: 45 days
#31

End covers

0.08 to 1.5 Sqmm

50 nos Delivery: 45 days
#32

Shorting links

0.08 to 1.5 Sqmm

50 sets Delivery: 45 days
#33

Partition plates

0.08 to 1.5 Sqmm

50 nos Delivery: 45 days
#34

Cage Clamp Terminal connector

0.08 to 2.5 Sqmm

300 nos Delivery: 45 days
#35

End covers

0.08 to 2.5 Sqmm

50 nos Delivery: 45 days
#36

Shorting links

0.08 to 2.5 Sqmm

50 sets Delivery: 45 days
#37

Partition plates

0.08 to 2.5 Sqmm

50 nos Delivery: 45 days
#38

Cage Clamp Terminal connector

0.08 to 4.0 Sqmm

300 nos Delivery: 45 days
#39

End covers

0.08 to 4.0 Sqmm

50 nos Delivery: 45 days
#40

Shorting links

0.08 to 4.0 Sqmm

50 sets Delivery: 45 days
#41

Partition plates

0.08 to 4.0 Sqmm

50 nos Delivery: 45 days
#42

Zack marker strip

horizontally 1-10

30 sets Delivery: 45 days
#43

Zack marker strip

horizontally 11-20

30 sets Delivery: 45 days
#44

Zack marker strip

horizontally 21-30

30 sets Delivery: 45 days
#45

Zack marker strip

horizontally 31-40

30 sets Delivery: 45 days
#46

Zack marker strip

horizontally 41-50

30 sets Delivery: 45 days
#47

Zack marker strip

horizontally 51-60

30 sets Delivery: 45 days
#48

Zack marker strip

horizontally 61-70

30 sets Delivery: 45 days
#49

Zack marker strip

horizontally 1-10

20 sets Delivery: 45 days
#50

Zack marker strip

horizontally 11-20

20 sets Delivery: 45 days
#51

Zack marker strip

horizontally 21-30

20 sets Delivery: 45 days
#52

Zack marker strip

horizontally 31-40

20 sets Delivery: 45 days
#53

Zack marker strip

horizontally 41-50

20 sets Delivery: 45 days
#54

Zack marker strip

horizontally 51-60

20 sets Delivery: 45 days
#55

Zack marker strip

horizontally 61-70

20 sets Delivery: 45 days
#56

DIN Rails

35 x 15 x 1.5 mm

10 mtrs Delivery: 45 days
#57

DIN Rails

35 x 7.5 x 1.5 mm

10 mtrs Delivery: 45 days
#58

DIN Rails

32 x 7.5 x 1.5 mm

10 mtrs Delivery: 45 days
#59

Cables

1 Core X 1.0 Sq. mm

5 bundles Delivery: 45 days
#60

Cables

1 Core X 1.5 Sq. mm

5 bundles Delivery: 45 days
#61

Cables

1 Core X 2.5 Sq. mm

5 bundles Delivery: 45 days
#62

Cables

1 Core X 4.0 Sq. mm

4 bundles Delivery: 45 days
#63

Toggle Switch

Double Pole Double Throw

40 nos Delivery: 45 days
#64

Toggle Switch

Double Pole Triple Throw

30 nos Delivery: 45 days
#65

Emergency Stop switch with box

Emergency Stop switch with box

50 nos Delivery: 45 days
#66

Emergency Stop switch without box

Emergency Stop switch without box

50 nos Delivery: 45 days
#67

Steel wire Reinforced PVC flexible pipe

Steel wire Reinforced PVC flexible pipe

300 mtrs Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
G K ENTERPRISES   Under PMA
-26-12-2025 15:02:29
2
M/S ENTERPRISING MARKETING ENGINEERS   Under PMA
-25-12-2025 15:25:46

Financial Results

Rank Seller Price Item
L1
M/S ENTERPRISING MARKETING ENGINEERS(MII)   Under PMA
Item Categories : Motor Protection Circuit Breaker,Motor Protection Circuit Breaker,Motor Protection Circuit Breaker,

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.