Bid Publish Date
17-Aug-2026, 6:38 pm
Bid End Date
01-Sep-2026, 3:00 pm
EMD
₹14,000
Value
₹7,00,000
Location
Progress
N/a invites bids for Stacker (V2) (Q2) in RAIPUR, CHHATTISGARH. Quantity: 1. Submission Deadline: 01-09-2026 15: 00: 00. Submit your proposal before the deadline.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Stacker (V2) (Q2)
Advisory Bank
State Bank of India
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Raipur
Delivery Pincodes
492001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kamal Narayan | 492001,Director Printing and Stationery Block 1 Second Floor Indrawati Bhavan New Raipur | Raipur | Chhattisgarh | 492001 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Generic | Type of Stackers / Function | Fully Electric Function of Lift and Traction |
| Generic | Loading Capacity | Upto 1200 Kgs @ 1.5 Meter Lift Height or Maximum Lift Height whichever is less |
| Performance | Maximum Designed Lift Height in Meters | 4.2 Or higher |
| Service, Warranty, Installation and Commissioning | Training and Demonstration | The installation and demonstration of the machine at the consignee place shall be carried out as part of installation and commissioning |
| Service, Warranty, Installation and Commissioning | Warranty against Manufacturing defect | 1 year from the date of satisfactory commissioning of the machine |
| Service, Warranty, Installation and Commissioning | Post warranty support | Agree to provide all supports and spares etc including CMC / AMC as per independent contract if placed by the buyer for 7 years from the date of commissioning |