TenderDekho Logo
Closed GEM

Procurement Opportunity: LED 20 or 22 W Tube Light Fitting,LED Street lgiht 70 watt for lighting pole,LED 50 watt flood ligh in SOUTH ANDAMAN, ANDAMAN & NICOBAR

Bid Publish Date

23-Dec-2025, 1:25 pm

Bid End Date

13-Jan-2026, 2:00 pm

EMD

₹1,03,000

Value

₹74,54,777

Progress

Issue23-Dec-2025, 1:25 pm
Technical01-Dec-2026, 9:13 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

28488

Category

Sodium hypochlorite solution 10 percent to 12 percent

Bid Type

Two Packet Bid

Categories 136

AGITATORS SPECTROSCOPIC EQUIPMENT AD FILM PARTICLE BOARD WIND MILL ENERGY PROJECT PLATFORM SCALE ANGLE ANIMAL WATERING MACHINES BATHROOM SET AMMONIA ALUM PURE BARITONE HORNS PAINTING COPPER COIL BULB RING STANDALONE AC PIR FABRICS AND LEATHER MATERIALS SECURITY HARDWARE ALUM POWER CABLE COMPRESSOR AIR CYLINDERS GRATING TOWEL AIR COOLED ENGINE DESERT COOLER ELECTRICAL PRODUCTS SENSOR BIOCIDE WIRING ASSEMBLY AMPS BACTERICIDE COMPRESSED BOARD HARDWARE AND FASTENERS GEYSER FAULT ANALYSIS AUTOMOTIVE CLEANERS FERROUS ALLOY SUPPLY WOODEN BOARD WOODEN PRODUCT DISCRETE COMPONENTS XLPE CABLE ELBOW COPPER ALLOY WOOD SUPPLY FLANGE BLOOD PRESSURE MEASURING INSTRUMENT ACCESSORIES FLAP CLEANING COMPOUNDS DIAMONDS COPPER SHEET MILITARY VEHICLE PANEL CAPACITOR LIGHT AND BULBS SOCKET STETHOSCOPE PAINT SUPPLY WINDOW BRACKET GI PIPE HIGH TENSION PANEL LED LUMINARIES DC MOTOR HYDRAULIC BRAKE WATER STORAGE AND SUPPLY WOODEN PLANK GINNING OIL SWITCH GEAR TUBE LIGHT DOORS FITMENT BIDET WOODEN FURNITURE FALL PROTECTION LANYARD PLY WOOD FORESTRY PRODUCTS STEEL DOOR ARCHERY BOWS LED LIGHT PNEUMATIC ALLOY BRAN OIL NON FERRIC ALUM ELECTRICAL CONDENSER NUTS VERTICAL COOLER TUBE WOVEN FABRIC SCBA BOX RODS VALVE ENAMELING PAINTS AND ACCESSORIES WIRE WORM GEAR PLYWOOD TURBINE PUMPS COMMUNICATION PROTOCOL EXHAUST SYSTEM FLUORESCENT LAMP PAINTS AND PRIMERS TUBES AND PIPES BLEACHING POWDER CLEANING CONSUMABLES COMPLETION EQUIPMENTS CABINET GAS BURNERS MESH LIGHTING ANGLE COCK TRANSITION METALS BATHROOM TISSUE DISPENSER FIRE BREATHING APPARATUS PLASTIC AMP SWITCH BLEACHES VALVE PARTS AND ACCESSORIES FLOAT VALVES BACTERIAL REMOVAL CHEMICALS HYDRAULIC PEB PAINTS BUFFER DOOR FAN LUBRICANT TEE LIME POLYMERASE CHAIN REACTION PCR CONTAINER STRING INSTRUMENTS VENETIAN BLIND PHENOL FORMALDEHYDE RESIN BARREL GALVANIZED IRON PIPE PAINTING MATERIAL

Indian Army announces a tender for LED 20 or 22 W Tube Light Fitting, LED Street lgiht 70 watt for lighting pole, LED 50 watt flood ligh in SOUTH ANDAMAN, ANDAMAN & NICOBAR. Quantity: 28488. Submission Deadline: 13-01-2026 14: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8658117.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 194 Items Sign in for GEM prices

#1

LED 20 or 22 W Tube Light Fitting

LED 20 or 22 W Tube Light Fitting

449 nos Delivery: 45 days
#2

LED Street lgiht 70 watt for lighting pole

LED Street lgiht 70 watt for lighting pole

8 each Delivery: 45 days
#3

LED 50 watt flood light

LED 50 watt flood light

6 nos Delivery: 45 days
#4

MCB TPN 63 Amps AC 415 Volts 50 c or s breaking capacity 10 KA C Series

MCB TPN 63 Amps AC 415 Volts 50 c or s breaking capacity 10 KA C Series

10 nos Delivery: 45 days
#5

2ft x 2 ft LED 24 Watts panel light

2ft x 2 ft LED 24 Watts panel light

26 nos Delivery: 45 days
#6

PTMT Ball Cock body with rod and Ball 25mm

PTMT Ball Cock body with rod and Ball 25mm

120 each Delivery: 45 days
#7

MCB SP 6 Amps AC 230 Volts 50 c or s breaking capacity 10 KA C Series

MCB SP 06 Amps AC 230 Volts 50 cor s breaking capacity 10 KA C Series

30 nos Delivery: 45 days
#8

PVC Float Valve 20 mm

PVC Float Valve 20 mm

236 each Delivery: 45 days
#9

Call bell multi music 240V

Call bell multi music 240V

40 nos Delivery: 45 days
#10

Capacitor 2 and falf Mfd AC Single phase 230or 440 Volts 50Hz for ceiling fan

Capacitor 2 and falf Mfd AC Single phase 230or 440 Volts 50Hz for ceiling fan

384 nos Delivery: 45 days
#11

20A and 10A Combined unit Box with 2 Fixing Hole

20A and 10A Combined unit Box with 2 Fixing Hole

111 each Delivery: 45 days
#12

3 Pin Plug 16 Amp

3 Pin Plug 16 Amp

20 each Delivery: 45 days
#13

Penta 6A2 IN1 SS Comb With box

Penta 6A2 IN1 SS Comb With box

157 each Delivery: 45 days
#14

Plug top 3 pin 5or 6 AmpsPoly carbonateor Bakelite AC 230V 50 Hz

Plug top 3 pin 5or 6 AmpsPoly carbonateor Bakelite AC 230V 50 Hz

20 nos Delivery: 45 days
#15

Penta 6 AMP switch SP one way

Penta 6 AMP switch SP one way

120 each Delivery: 45 days
#16

Lamp holder Anguler type Poly carbonate or Bakelite or PVC for retro fit lamp base B22 type AC 230V 50 Hz

Lamp holder Anguler type Poly carbonate or Bakelite or PVC for retro fit lamp base B22 type AC 230V 50 Hz

20 nos Delivery: 45 days
#17

Lamp holder Battern type Poly carbonate Bakelite PVC for retro-fit lamp base B22 type AC230v 50 Hz

Lamp holder Battern type Poly carbonate Bakelite PVC for retro-fit lamp base B22 type AC230v 50 Hz

20 nos Delivery: 45 days
#18

Fan speed regulator electronic stepped type multy socket type AC 230V Single pole 50Hz

Fan speed regulator electronic stepped type multy socket type AC 230V Single pole 50Hz

429 nos Delivery: 45 days
#19

LED flood light 200 watt luminaire 120 Watts

LED flood light 200 watt luminaire 120 Watts

8 nos Delivery: 45 days
#20

LED Steert light 45 watt luminaire 120 Watts

LED Steert light 45 watt luminaire 120 Watts

10 nos Delivery: 45 days
#21

LED Steert light 35 watt luminaire 120 Watts

LED Steert light 35 watt luminaire 120 Watts

24 nos Delivery: 45 days
#22

LED bulb 7 Watts

LED bulb 7 Watts

200 nos Delivery: 45 days
#23

LED bulb 9 Watts

LED bulb 9 Watts

200 nos Delivery: 45 days
#24

LED bulb 12 Watts

LED bulb 12 Watts

200 nos Delivery: 45 days
#25

Calcium Hypo Chloride in grnular with 65 to 70 percent available chlorine

Calcium Hypo Chloride in grnular with 65 to 70 percent available chlorine the material should be free from dust and other visible impurties in sealed plastic or HDPE bags test certificate from manufacturer or NABL accredited lab is required bearing date of manufaturer and expiry

3,402 kgs Delivery: 45 days
#26

Alum Non ferric Cystal Type

Alum Non ferric Cystal Type

11,410 kgs Delivery: 45 days
#27

Bleaching Powder

Bleaching Powder

400 kgs Delivery: 45 days
#28

Lime grade in C in dust form

Lime grade in C in dust form

500 kgs Delivery: 45 days
#29

Sodium hypochlorite solution 10 percent to 12 percent

Sodium hypochlorite solution 10 percent to 12 percent

2,850 ltrs Delivery: 45 days
#30

COPPER SULPHATE

COPPER SULPHATE

200 kgs Delivery: 45 days
#31

MCB SP 10 AMP

MCB SP 10 AMP

23 nos Delivery: 45 days
#32

MCB SP 16 AMP

MCB SP 16 AMP

23 nos Delivery: 45 days
#33

MCB SPN 40 AMP

MCB SPN 40 AMP

23 nos Delivery: 45 days
#34

LED tube light 2 FT long 10 watt

LED tube light 2 FT long 10 watt

30 nos Delivery: 45 days
#35

MCB SP 20 AMP

MCB SP 20 AMP

14 nos Delivery: 45 days
#36

plastic LED bulk head light 10 watt

plastic LED bulk head light 10 watt

20 nos Delivery: 45 days
#37

Lukeran steel barrel for lubricant grade A

Lukeran steel barrel for lubricant grade A

8 nos Delivery: 45 days
#38

Water storeage tank 1000 litter

Water storeage tank 1000 litter

6 nos Delivery: 45 days
#39

Insulation tape 15 mm of 6 MTR

Insulation tape 15 mm of 6 MTR

200 nos Delivery: 45 days
#40

4 MFD Capacitor

4 MFD Capacitor

10 nos Delivery: 45 days
#41

6 MFD Capacitor

6 MFD Capacitor

10 nos Delivery: 45 days
#42

45 plus 6 MFD Capacitor

45 plus 6 MFD Capacitor

5 nos Delivery: 45 days
#43

50 plus 6 MFD Capacitor

50 plus 6 MFD Capacitor

5 nos Delivery: 45 days
#44

55 plus 6 MFD Capacitor

55 plus 6 MFD Capacitor

5 nos Delivery: 45 days
#45

Artic Board

Artic Board

10 nos Delivery: 45 days
#46

Universal Board DC double sensor auto restart function outdoors fan controlled fan motor universal PCB for DC motor

Universal Board DC double sensor auto restart function outdoors fan controlled fan motor universal PCB for DC motor

10 nos Delivery: 45 days
#47

Bib tap cast copper alloy brass 15mmdia

Bib tap cast copper alloy brass 15mmdia

60 each Delivery: 45 days
#48

Seat cover Plastic white for EVC with hinges

Seat cover Plastic white for EVC with hinges

44 each Delivery: 45 days
#49

Decorative rod 20 or 25mm dia x 3 mtr

Decorative rod 20 or 25mm dia x 3 mtr

27 nos Delivery: 45 days
#50

PVC connection 450 mm long with brass nuts

PVC connection 450 mm long with brass nuts

20 each Delivery: 45 days
#51

600 mm connection pipe with nuts

600 mm connection pipe with nuts

30 each Delivery: 45 days
#52

Stop valve cast copper 15 mm dia

Stop valve cast copper 15 mm dia

5 nos Delivery: 45 days
#53

Bib cock CP 15 mm dia with flange

Bib cock CP 15 mm dia with flange

34 nos Delivery: 45 days
#54

PVC low level flushing cistern with complete accessories 10 litre capacity

PVC low level flushing cistern with complete accessories 10 litre capacity

35 each Delivery: 45 days
#55

PVC Mirror cabinet of size n exc 450mm in width n exc 550 mm in length

PVC Mirror cabinet of size n exc 450mm in width n exc 550 mm in length

8 nos Delivery: 45 days
#56

CP grating 100 mm dia ISI marked M

CP grating 100 mm dia ISI marked M

21 each Delivery: 45 days
#57

Decorative brackets for drapery rods

Decorative brackets for drapery rods

7 nos Delivery: 45 days
#58

CP Jet Spray 450mm long for 15mm dia

CP Jet Spray 450mm long for 15mm dia

17 each Delivery: 45 days
#59

CP Health foucet with 1mm flexible tube

CP Health foucet with 1mm flexible tube

68 nos Delivery: 45 days
#60

Wash hand basin 1st quality oval shape 650 x 450 mm

Wash hand basin 1st quality oval shape 650 x 450 mm

5 nos Delivery: 45 days
#61

Shower rose CP 125 mm

Shower rose CP 125 mm

32 each Delivery: 45 days
#62

Angle cock CP 15 mm dia with flange

Angle cock CP 15 mm dia with flange

42 each Delivery: 45 days
#63

Pillar cock CP medium weight fancy type of 15 mm

Pillar cock CP medium weight fancy type of 15 mm

40 each Delivery: 45 days
#64

Floor door stopper of aluminium 140 mm

Floor door stopper of aluminium 140 mm

70 each Delivery: 45 days
#65

Aluminium anodised curtain rod 20mm dia 3 mtr Long

Aluminium anodised curtain rod 20mm dia 3 mtr Long

30 each Delivery: 45 days
#66

CP grating 125 mm ISI marked

CP grating 125 mm ISI marked

19 each Delivery: 45 days
#67

Waste coupling 40 mm CP for stainless steel kitchen sink

Waste coupling 40 mm CP for stainless steel kitchen sink

19 nos Delivery: 45 days
#68

PVC Waste pipe for urinal 32 mm dia

PVC Waste pipe for urinal 32 mm dia

23 each Delivery: 45 days
#69

Aluminium anodised bow handle 150 mm long

Aluminium anodised bow handle 150 mm long

20 each Delivery: 45 days
#70

Aluminium anodised Tower Bolt 200mm

Aluminium anodised Tower Bolt 200mm

20 each Delivery: 45 days
#71

Aluminium anodised Tower Bolt 150mm

Aluminium anodised Tower Bolt 150mm

20 each Delivery: 45 days
#72

Aluminium bracket 20mm curtain rod tubing T and L type

Aluminium bracket 20mm curtain rod tubing T and L type

41 each Delivery: 45 days
#73

CI Bracket for Wash Hand Basin

CI Bracket for Wash Hand Basin

10 each Delivery: 45 days
#74

Hydraulic door closer brass type

Hydraulic door closer brass type

16 each Delivery: 45 days
#75

Nails wire 1inch

Nails wire 1inch

500 grm Delivery: 45 days
#76

Nails wire one and half inch

Nails wire one and half inch

500 grm Delivery: 45 days
#77

Nails two inch

Nails two inch

500 grm Delivery: 45 days
#78

Nails two and half inch

Nails two and half inch

500 grm Delivery: 45 days
#79

Nails 3 inch

Nails 3 inch

500 grm Delivery: 45 days
#80

SS Plate Rack 24inch X 30 inch

SS Plate Rack 24inch X 30 inch

8 nos Delivery: 45 days
#81

SS Plate Rack 30 inch X36 inch

SS Plate Rack 30 inch X36 inch

9 nos Delivery: 45 days
#82

CP Nipple 1 inch

CP Nipple 1 inch

20 nos Delivery: 45 days
#83

CP Nipple one and half inch

CP Nipple one and half inch

19 nos Delivery: 45 days
#84

CP Nipple two inch

CP Nipple two inch

20 nos Delivery: 45 days
#85

Self screw 1 inch

Self screw 1 inch

3 box Delivery: 45 days
#86

Self screw one and half inch

Self screw one and half inch

3 box Delivery: 45 days
#87

Self screw 2 inch

Self screw 2 inch

3 box Delivery: 45 days
#88

Self screw 4 inch

Self screw 4 inch

1 box Delivery: 45 days
#89

Splindle for Concealed stop cock

Splindle for Concealed stop cock

19 nos Delivery: 45 days
#90

Splindle for Bib cock

Splindle for Bib cock

21 nos Delivery: 45 days
#91

Washer

Washer

1 pkt Delivery: 45 days
#92

Sink Coupling 3 inch

Sink Coupling 3 inch

15 nos Delivery: 45 days
#93

Sink Coupling 4 inch

Sink Coupling 4 inch

14 nos Delivery: 45 days
#94

Flushing cistern kit

Flushing cistern kit

11 nos Delivery: 45 days
#95

Waste pipe for sink 32mm

Waste pipe for sink 32mm

44 nos Delivery: 45 days
#96

Waste pipe for hand wash basin

Waste pipe for hand wash basin

64 nos Delivery: 45 days
#97

Sink single bowl

Sink single bowl

2 nos Delivery: 45 days
#98

Plastic road stud

Plastic road stud

30 nos Delivery: 45 days
#99

CP Sink cock

CP Sink cock

5 nos Delivery: 45 days
#100

Bib cock 2 in 1

Bib cock 2 in 1

13 nos Delivery: 45 days
#101

Two way bib cock 15mm

Two way bib cock 15mm

3 nos Delivery: 45 days
#102

Angle CP cock 2 in 1

Angle CP cock 2 in 1

11 nos Delivery: 45 days
#103

Butt hings MS 100mm

Butt hings MS 100mm

12 nos Delivery: 45 days
#104

Aluminium wire cloth 0.45mm dia

Aluminium wire cloth 0.45mm dia

1 roll Delivery: 45 days
#105

Hasp and staple 100 mm

Hasp and staple 100 mm

7 nos Delivery: 45 days
#106

Alloy butt hings 100mm

Alloy butt hings 100mm

14 nos Delivery: 45 days
#107

Tephlon tape

Tephlon tape

8 nos Delivery: 45 days
#108

Self screw 1 inch

Self screw 1 inch

2 box Delivery: 45 days
#109

Self screw one and half inch

Self screw one and half inch

2 box Delivery: 45 days
#110

Looking mirror 24x16 inch

Looking mirror 24x16 inch

7 nos Delivery: 45 days
#111

Looking mirror 24x24 inch

Looking mirror 24x24 inch

7 nos Delivery: 45 days
#112

SS jet spray with 1 mtr tube

SS jet spray with 1 mtr tube

2 nos Delivery: 45 days
#113

CP centre hole basin mixture suitable for dia 15 mm gi pipe

CP centre hole basin mixture suitable for dia 15 mm gi pipe

22 nos Delivery: 45 days
#114

Soap dish

Soap dish

19 nos Delivery: 45 days
#115

Toilet paper holder with flap

Toilet paper holder with flap

19 nos Delivery: 45 days
#116

Tower rack 24 inch

Tower rack 24 inch

14 nos Delivery: 45 days
#117

Towel ring round type

Towel ring round type

24 nos Delivery: 45 days
#118

CP or SS grating 100 Round

CP or SS grating 100 Round

20 nos Delivery: 45 days
#119

CP or SS grating 150 or 125 mm round

CP or SS grating 150 or 125 mm round

15 nos Delivery: 45 days
#120

CP or SS grating with hole 100 round

CP or SS grating with hole 100 round

17 nos Delivery: 45 days
#121

CP or SS grating with hole 150 or 125mm round

CP or SS grating with hole 150 or 125mm round

20 nos Delivery: 45 days
#122

Spreder for urinal suitable for dia 15 mm gi pipe

Spreder for urinal suitable for dia 15 mm gi pipe

4 nos Delivery: 45 days
#123

Glass shelf corner

Glass shelf corner

31 nos Delivery: 45 days
#124

Glass shelf 15 or 18 inch long

Glass shelf 15 or 18 inch long

23 nos Delivery: 45 days
#125

Cp extension nipple length 1 inch sixe half inch

Cp extension nipple length 1 inch sixe half inch

14 nos Delivery: 45 days
#126

Cp extension nipple length one inch size half inch

Cp extension nipple length one inch size half inch

14 nos Delivery: 45 days
#127

CP OR Brass Shower Rose 75 MM OR 100 MM

CP OR Brass Shower Rose 75 MM OR 100 MM

25 nos Delivery: 45 days
#128

CP OR Brass Shower Rose 100 MM OR 150MM

CP OR Brass Shower Rose 100 MM OR 150MM

28 nos Delivery: 45 days
#129

Wall Grip 8 NOS

Wall Grip 8 NOS

11 nos Delivery: 45 days
#130

Wall Grip 10 NOS

Wall Grip 10 NOS

11 nos Delivery: 45 days
#131

CPVC Fitting Tee 1

CPVC Fitting Tee 1

24 nos Delivery: 45 days
#132

CPVC Fitting Tee 3 OR 4

CPVC Fitting Tee 3 OR 4

24 nos Delivery: 45 days
#133

CPVC Fitting Elbow 1

CPVC Fitting Elbow 1

21 nos Delivery: 45 days
#134

CPVC Fitting Elbow 3 OR 4

CPVC Fitting Elbow 3 OR 4

26 nos Delivery: 45 days
#135

CPVC Fitting Socket 1

CPVC Fitting Socket 1

23 nos Delivery: 45 days
#136

CPVC Fitting Socket 3 OR 4

CPVC Fitting Socket 3 OR 4

23 nos Delivery: 45 days
#137

CPVC Fitting Union Socket 1

CPVC Fitting Union Socket 1

23 nos Delivery: 45 days
#138

CPVC Fitting Union Socket 3 OR 4

CPVC Fitting Union Socket 3 OR 4

21 nos Delivery: 45 days
#139

CPVC Fitting Brass Tee 1 X 3 OR 4

CPVC Fitting Brass Tee 1 X 3 OR 4

10 nos Delivery: 45 days
#140

CPVC Fitting Brass Tee 3 OR 4

CPVC Fitting Brass Tee 3 OR 4

23 nos Delivery: 45 days
#141

CPVC Fitting Brass Elbow 3 OR 4

CPVC Fitting Brass Elbow 3 OR 4

21 nos Delivery: 45 days
#142

CPVC Fitting Brass Elbow 1 OR 2 X 3 OR 4

CPVC Fitting Brass Elbow 1 OR 2 X 3 OR 4

23 nos Delivery: 45 days
#143

CPVC Fitting MTA 1

CPVC Fitting MTA 1

12 nos Delivery: 45 days
#144

CPVC Fitting MTA 3 OR 4

CPVC Fitting MTA 3 OR 4

12 nos Delivery: 45 days
#145

CPVC Fitting FTA 1

CPVC Fitting FTA 1

12 nos Delivery: 45 days
#146

CPVC Fitting FTA 3 OR 4

CPVC Fitting FTA 3 OR 4

12 nos Delivery: 45 days
#147

CPVC Fitting Tank Connector 1

CPVC Fitting Tank Connector 1

24 nos Delivery: 45 days
#148

CPVC Fitting BLL Value 1

CPVC Fitting BLL Value 1

20 nos Delivery: 45 days
#149

Sloar Road Light Stud With Shank

Sloar Road Light Stud With Shank

15 nos Delivery: 45 days
#150

Shower Rose CP 125 MM Suitable For Dia 15 MM GI Pipe

Shower Rose CP 125 MM Suitable For Dia 15 MM GI Pipe

26 nos Delivery: 45 days
#151

Aluminium Wire Mesh 3 Feet

Aluminium Wire Mesh 3 Feet

34 sqm Delivery: 45 days
#152

Aluminium Wire Mesh 4 Feet

Aluminium Wire Mesh 4 Feet

56 sqm Delivery: 45 days
#153

Snake Guard 4 Feet Long

Snake Guard 4 Feet Long

301 nos Delivery: 45 days
#154

Door Stopper 140 MM Make

Door Stopper 140 MM Make

110 nos Delivery: 45 days
#155

Door Stopper 140 MM Brass Coated Moduler

Door Stopper 140 MM Brass Coated Moduler

91 nos Delivery: 45 days
#156

Sliding Bolt 150MM

Sliding Bolt 150MM

20 nos Delivery: 45 days
#157

Sliding Bolt 200MM

Sliding Bolt 200MM

20 nos Delivery: 45 days
#158

Door Hings 75MM

Door Hings 75MM

58 nos Delivery: 45 days
#159

Door Hings 100MM

Door Hings 100MM

53 nos Delivery: 45 days
#160

Door Hings 150MM

Door Hings 150MM

30 nos Delivery: 45 days
#161

Tower Bolt 75MM

Tower Bolt 75MM

20 nos Delivery: 45 days
#162

Tower Bolt 100MM

Tower Bolt 100MM

20 nos Delivery: 45 days
#163

Tower Bolt 150MM

Tower Bolt 150MM

20 nos Delivery: 45 days
#164

Tower Bolt 200MM

Tower Bolt 200MM

20 nos Delivery: 45 days
#165

Curtain Rods 3.60 MTR Lenght 25MM Dia

Curtain Rods 3.60 MTR Lenght 25MM Dia

165 nos Delivery: 45 days
#166

Curtain Brackets Normal

Curtain Brackets Normal

227 nos Delivery: 45 days
#167

Door Bandle Aluminium 150MM

Door Bandle Aluminium 150MM

57 nos Delivery: 45 days
#168

Aluminium Window Handle Right OR Left

Aluminium Window Handle Right OR Left

45 nos Delivery: 45 days
#169

CP Wall mixture

CP Wall mixture

30 nos Delivery: 45 days
#170

CP Sink mixture

CP Sink mixture

28 nos Delivery: 45 days
#171

Knob drawer 25 mm brass

Knob drawer 25 mm Brass

13 each Delivery: 45 days
#172

Fevicol SR 098

Fevicol SR 098

5 each Delivery: 45 days
#173

Screw wood steel 35 mm ISI marked

Screw wood steel 35 mm ISI marked

4 pkt Delivery: 45 days
#174

Screw wood steel 25 mm ISI marked

Screw wood steel 25 mm ISI marked

5 pkt Delivery: 45 days
#175

Screw wood steel 20 mm ISI marked

Screw wood steel 20 mm ISI marked

1 pkt Delivery: 45 days
#176

French Polish in 1 ltr pack

French Polish in 1 ltr pack

10 each Delivery: 45 days
#177

Thinner

Thinner

10 ltr Delivery: 45 days
#178

Synthetic enamel paint Black colour 1 st quality in 1 ltr pack

Synthetic enamel paint Black colour 1st quality in 1 ltr pack

15 each Delivery: 45 days
#179

Sand Paper No 100

Sand Paper No 100

11 each Delivery: 45 days
#180

Varnish in 1 litre container

Varnish in 1 litre container

17 nos Delivery: 45 days
#181

Sand Paper No 80

Sand Paper No 80

11 each Delivery: 45 days
#182

Sand Paper No 60

Sand Paper No 60

12 each Delivery: 45 days
#183

Sand Paper No 200

Sand Paper No 200

22 each Delivery: 45 days
#184

Sand Paper No 40

Sand Paper No 40

27 each Delivery: 45 days
#185

CP Knob 40mm

CP Knob 40mm

220 each Delivery: 45 days
#186

Paint brush 25 mm

Paint brush 25 mm

25 each Delivery: 45 days
#187

Plywood 2400 x 1200 x 12 mm BWR

Plywood 2400 x 1200 x 12 mm BWR

48 nos Delivery: 45 days
#188

Timber beeding 200 mm x 15 mm

Timber beeding 200 mm x 15 mm

127 ft Delivery: 45 days
#189

Pannel pin 20 mm

Pannel pin 20 mm

5 kgs Delivery: 45 days
#190

Pannel pin 15 mm

Pannel pin 15 mm

3 kgs Delivery: 45 days
#191

Plywood 4mmx 8 ft x 4ft x 4mm one side teak face

Plywood 4mmx 8 ft x 4ft x 4mm one side teak face

5 nos Delivery: 45 days
#192

Paint brush 75 mm

Paint brush 75 mm

10 nos Delivery: 45 days
#193

Pre laminated particle board 8ft x 4ft x18 or 19mm exterior grade

Pre laminated particle board 8ft x 4ft x18 or 19mm exterior grade

33 nos Delivery: 45 days
#194

Pre laminated particle board 8ft x 4ft x 9 mm exterior grade

Pre laminated particle board 8ft x4ft x9 mm exterior grade

22 nos Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
M/S HARDMEN TRADERS   Under PMA
-12-01-2026 21:13:36
2
NAUTICAL INNOVATIONS   Under PMA
-12-01-2026 19:01:34
3
SUN TRADERS   Under PMA
-12-01-2026 20:45:01
4
VARDHMAN TRADERS   Under PMA
-12-01-2026 18:08:06