Bid Publish Date
19-May-2026, 10:31 am
Bid End Date
03-Jun-2026, 1:00 pm
EMD
₹2,12,000
Value
₹2,11,97,584
Location
Progress
Quantity
24024
Category
Erection of 250 KVA TF
Bid Type
Two Packet Bid
A tender has been published for Uttar Pradesh Power Corporation Limited (uppcl) Supply of LT PCV Cable, Supply of MS Channel, Supply of Stone Pad, Supply of Holding clamp, Supply of M. S. Angle, Supply of M. S. Channel, Supply of Clamp, Supply of M. S. Top Channel, Supply of LT Fuse Set, Supply of Danger Board, Supply of Barbed Wire, Supply of Number Plate, Supply of Copper L-Piece, Supply of Al Leg Long Barrel, Supply of Henley Type Tailless Unit, Safe Carriage of 25 KVA TF, Safe Carriage of 250 KVA TF, Safe Carriage of PCC Pole, Safe Carriage of ACSR Weasel Conductor, Safe Carriage of LT XLPE Cable, Safe Carriage of Disc Insulator, Safe Carriage of Disc Fitting, Safe Carriage of Pin Insulator, Safe Carriage of Pin with nut, Safe Carriage of TPMO, Safe Carriage of Fuse Set, Safe Carriage of Stay Set, Safe Carriage of Earthing rod of Pole, Erection of 25 KVA TF, Erection of 250 KVA TF, Erection of PCC Pole, Erection of Pipe Earthing, Erection of Plinth, Erection of Fencing, Erection of LT PCV Cable, Erection of MS Channel, Erection of M. S. Angle, Erection of M. S. Channel, Erection of M. S. Top Channel, Erection of LT Fuse Set, Erection of Danger Board, Erection of Barbed Wire, Erection of Number Plate, Erection of Copper L-Piece, Erection of Al Leg Long Barrel, Erection of Henley Type Tailless Unit, Erection of ACSR Weasel Conductor, Erection of LT XLPE Cable, Erection of 11 KV TPMO, Erection of FUSE Set, Erection of Stay Set Complete, Recieved back charges for Carraige of TF from site to store. in ETAH, UTTAR PRADESH. Quantity: 24024 by. Submission Deadline: 03-06-2026 13: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of LT PCV Cable , Supply of MS Channel , Supply of Stone Pad , Supply of Holding clamp , Supply of M.S. Angle , Supply of M.S. Channel , Supply of Clamp , Supply of M.S. Top Channel , Supply of LT Fuse Set , Supply of Danger Board , Supply of Barbed Wire , Supply of Number Plate , Supply of Copper L-Piece , Supply of Al Leg Long Barrel , Supply of Henley Type Tailless Unit , Safe Carriage of 25 KVA TF , Safe Carriage of 250 KVA TF , Safe Carriage of PCC Pole , Safe Carriage of ACSR Weasel Conductor , Safe Carriage of LT XLPE Cable , Safe Carriage of Disc Insulator , Safe Carriage of Disc Fitting , Safe Carriage of Pin Insulator , Safe Carriage of Pin with nut , Safe Carriage of TPMO , Safe Carriage of Fuse Set , Safe Carriage of Stay Set , Safe Carriage of Earthing rod of Pole , Erection of 25 KVA TF , Erection of 250 KVA TF , Erection of PCC Pole , Erection of Pipe Earthing , Erection of Plinth , Erection of Fencing , Erection of LT PCV Cable , Erection of MS Channel , Erection of M.S. Angle , Erection of M.S. Channel , Erection of M.S. Top Channel , Erection of LT Fuse Set , Erection of Danger Board , Erection of Barbed Wire , Erection of Number Plate , Erection of Copper L-Piece , Erection of Al Leg Long Barrel , Erection of Henley Type Tailless Unit , Erection of ACSR Weasel Conductor , Erection of LT XLPE Cable , Erection of 11 KV TPMO , Erection of FUSE Set , Erection of Stay Set Complete , Recieved back charges for Carraige of TF from site to store.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of LT PCV Cable
LT PCV Cable 4x16 Sqmm Armoured Cable
Supply of LT PCV Cable
LT PVC Cable 3.5x70/35 Sq mm
Supply of LT PCV Cable
LT PVC Cable 3.5x150/70 Sq mm
Supply of MS Channel
MS Channel (Dropper) 100x50x2028 mm
Supply of Stone Pad
Stone Pad 300x300x75 mm
Supply of Holding clamp
Holding clamp for top channel TPMO & Fuse set with nut & Bolt
Supply of M.S. Angle
M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base
Supply of M.S. Channel
M.S. Channel 125x65x1300 mm T-off
Supply of Clamp
Clamp for LT T-off with bolt & nuts
Supply of M.S. Top Channel
M.S. Top Channel 125x65x2240 mm
Supply of LT Fuse Set
LT Fuse Set
Supply of Danger Board
Danger Board
Supply of Barbed Wire
Barbed Wire G.I.
Supply of Number Plate
Number Plate
Supply of Copper L-Piece
Copper L-Piece 50x225x10 mm (LS)
Supply of Copper L-Piece
Copper L-Piece 62x225x12 mm (LS)
Supply of Al Leg Long Barrel
Al Leg Long Barrel of size (LS)
Supply of Henley Type Tailless Unit
Henley Type Tailless Unit for 250 KVA
Safe Carriage of 25 KVA TF
Safe Carriage of 11/0.4 KV TF 25 KVA & following materials from Electricity Store Center Soron/Etah / Aligarh to the site of work, including loading & unloading at both ends, Traspotation upto the work side. The rates shall be inclusive of all labour charges, T&P and all incidental expenses required for complete execution of the work.
Safe Carriage of 250 KVA TF
11/0.4 KV TF 250 KVA
Safe Carriage of PCC Pole
PCC Pole 8.5 Metre
Safe Carriage of ACSR Weasel Conductor
ACSR Weasel Conductor
Safe Carriage of LT XLPE Cable
LT XLPE Cable AL 3.5x400 Sqmm
Safe Carriage of LT XLPE Cable
LT XLPE Cable AL 1x400 Sqmm
Safe Carriage of LT XLPE Cable
LT XLPE Cable AL 1x240 Sqmm
Safe Carriage of Disc Insulator
11 KV Disc Insulator Type 4500 Kg.
Safe Carriage of Disc Fitting
11 KV Disc Fitting
Safe Carriage of Pin Insulator
11 KV Pin Insulator
Safe Carriage of Pin with nut
11 KV Pin with nut
Safe Carriage of TPMO
11 KV TPMO
Safe Carriage of Fuse Set
11 KV FUSE Set
Safe Carriage of Stay Set
Stay Set Complete
Safe Carriage of Earthing rod of Pole
Earthing of Pole by MS Earthing rod of 20x2500 mm and 6 SWG earthing wire etc.
Erection of 25 KVA TF
Installation of new 25 kVA, 110.4 kV transformer complete in all respects
Erection of 250 KVA TF
Installation of new 250 kVA, 110.4 kV transformer complete in all respects
Erection of PCC Pole
Erection of double support with complete HT/LT fittings on 8.5 m PCC poles, including earthing, grouting, and muffing of poles as per RESPO norms
Erection of Pipe Earthing
Installation of pipe earthing body and neutral up to 60 feet depth or minimum water level, as per RESPO norms
Erection of Plinth
Construction and installation of plinth for 250 kVA transformer, complete in all respects
Erection of Fencing
Construction and installation of 6 feet high fencing for 250 kVA transformer including civil works for 4x4 m area complete in all respects
Erection of LT PCV Cable
Laying & Fixing of LT PCV Cable 4x16 Sqmm Armoured Cable
Erection of LT PCV Cable
Laying & Fixing of 3.5x70/35 Sq mm
Erection of LT PCV Cable
Laying & Fixing of LT PVC Cable 3.5x150/70 Sq mm
Erection of MS Channel
Erection & Installation of MS Channel (Dropper) 100x50x2028 mm
Erection of M.S. Angle
Erection & Installation of M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base
Erection of M.S. Channel
Erection & Installation of M.S. Channel 125x65x1300 mm T-off
Erection of M.S. Top Channel
Erection & Installation of M.S. Top Channel 125x65x2240 mm
Erection of LT Fuse Set
Fixing of LT Fuse Set
Erection of Danger Board
Fixing of Danger Board
Erection of Barbed Wire
Laying & Fixing of Barbed Wire G.I.
Erection of Number Plate
Fixing of Number Plate
Erection of Copper L-Piece
Erection & Installation of Copper L-Piece 50x225x10 mm LS
Erection of Copper L-Piece
Erection & Installation of Copper L-Piece 62x225x12 mm LS
Erection of Al Leg Long Barrel
Erection & Installation of Al Leg Long Barrel of size LS
Erection of Henley Type Tailless Unit
Erection & Installation of Henley Type Tailless Unit for 250 KVA
Erection of ACSR Weasel Conductor
Laying sagging stringing, binding and jumpering ACSR Weasel conductor
Erection of LT XLPE Cable
Laying & Fixing of LT XLPE Cable AL 3.5x400 Sqmm
Erection of LT XLPE Cable
Laying & Fixing of LT XLPE Cable AL 1x400 Sqmm
Erection of LT XLPE Cable
Laying & Fixing of LT XLPE Cable AL 1x240 Sqmm
Erection of 11 KV TPMO
Erection & Installation of 11 KV TPMO
Erection of FUSE Set
Erection & Installation of 11 KV FUSE Set
Erection of Stay Set Complete
Erection & Installation of Stay Set Complete in all respect
Recieved back charges for Carraige of TF from site to store.
Transformer 10 KVA
Recieved back charges for Carraige of TF from site to store.
Transformer 16 KVA
Recieved back charges for Carraige of TF from site to store.
Transformer 100 KVA
Recieved back charges for Carraige of TF from site to store.
Transformer 160 KVA
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of LT PCV Cable | LT PCV Cable 4x16 Sqmm Armoured Cable | 540 | mtr | con3eddsoron | 60 | |
| 2 | Supply of LT PCV Cable | LT PVC Cable 3.5x70/35 Sq mm | 1,280 | mtr | con3eddsoron | 60 | |
| 3 | Supply of LT PCV Cable | LT PVC Cable 3.5x150/70 Sq mm | 760 | mtr | con3eddsoron | 60 | |
| 4 | Supply of MS Channel | MS Channel (Dropper) 100x50x2028 mm | 27 | nos | con3eddsoron | 60 | |
| 5 | Supply of Stone Pad | Stone Pad 300x300x75 mm | 54 | nos | con3eddsoron | 60 | |
| 6 | Supply of Holding clamp | Holding clamp for top channel TPMO & Fuse set with nut & Bolt | 270 | nos | con3eddsoron | 60 | |
| 7 | Supply of M.S. Angle | M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base | 54 | nos | con3eddsoron | 60 | |
| 8 | Supply of M.S. Channel | M.S. Channel 125x65x1300 mm T-off | 27 | nos | con3eddsoron | 60 | |
| 9 | Supply of Clamp | Clamp for LT T-off with bolt & nuts | 27 | nos | con3eddsoron | 60 | |
| 10 | Supply of M.S. Top Channel | M.S. Top Channel 125x65x2240 mm | 27 | nos | con3eddsoron | 60 | |
| 11 | Supply of LT Fuse Set | LT Fuse Set | 129 | nos | con3eddsoron | 60 | |
| 12 | Supply of Danger Board | Danger Board | 27 | nos | con3eddsoron | 60 | |
| 13 | Supply of Barbed Wire | Barbed Wire G.I. | 108 | kg | con3eddsoron | 60 | |
| 14 | Supply of Number Plate | Number Plate | 27 | nos | con3eddsoron | 60 | |
| 15 | Supply of Copper L-Piece | Copper L-Piece 50x225x10 mm (LS) | 252 | nos | con3eddsoron | 60 | |
| 16 | Supply of Copper L-Piece | Copper L-Piece 62x225x12 mm (LS) | 252 | nos | con3eddsoron | 60 | |
| 17 | Supply of Al Leg Long Barrel | Al Leg Long Barrel of size (LS) | 1,512 | nos | con3eddsoron | 60 | |
| 18 | Supply of Henley Type Tailless Unit | Henley Type Tailless Unit for 250 KVA | 63 | nos | con3eddsoron | 60 | |
| 19 | Safe Carriage of 25 KVA TF | Safe Carriage of 11/0.4 KV TF 25 KVA & following materials from Electricity Store Center Soron/Etah / Aligarh to the site of work, including loading & unloading at both ends, Traspotation upto the work side. The rates shall be inclusive of all labour charges, T&P and all incidental expenses required for complete execution of the work. | 27 | nos | con3eddsoron | 60 | |
| 20 | Safe Carriage of 250 KVA TF | 11/0.4 KV TF 250 KVA | 63 | nos | con3eddsoron | 60 | |
| 21 | Safe Carriage of PCC Pole | PCC Pole 8.5 Metre | 54 | nos | con3eddsoron | 60 | |
| 22 | Safe Carriage of ACSR Weasel Conductor | ACSR Weasel Conductor | 540 | mtr | con3eddsoron | 60 | |
| 23 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 3.5x400 Sqmm | 945 | mtr | con3eddsoron | 60 | |
| 24 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 1x400 Sqmm | 1,260 | mtr | con3eddsoron | 60 | |
| 25 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 1x240 Sqmm | 3,150 | mtr | con3eddsoron | 60 | |
| 26 | Safe Carriage of Disc Insulator | 11 KV Disc Insulator Type 4500 Kg. | 162 | nos | con3eddsoron | 60 | |
| 27 | Safe Carriage of Disc Fitting | 11 KV Disc Fitting | 162 | nos | con3eddsoron | 60 | |
| 28 | Safe Carriage of Pin Insulator | 11 KV Pin Insulator | 81 | nos | con3eddsoron | 60 | |
| 29 | Safe Carriage of Pin with nut | 11 KV Pin with nut | 81 | nos | con3eddsoron | 60 | |
| 30 | Safe Carriage of TPMO | 11 KV TPMO | 90 | nos | con3eddsoron | 60 | |
| 31 | Safe Carriage of Fuse Set | 11 KV FUSE Set | 90 | nos | con3eddsoron | 60 | |
| 32 | Safe Carriage of Stay Set | Stay Set Complete | 54 | nos | con3eddsoron | 60 | |
| 33 | Safe Carriage of Earthing rod of Pole | Earthing of Pole by MS Earthing rod of 20x2500 mm and 6 SWG earthing wire etc. | 156 | nos | con3eddsoron | 60 | |
| 34 | Erection of 25 KVA TF | Installation of new 25 kVA, 110.4 kV transformer complete in all respects | 27 | nos | con3eddsoron | 60 | |
| 35 | Erection of 250 KVA TF | Installation of new 250 kVA, 110.4 kV transformer complete in all respects | 63 | nos | con3eddsoron | 60 | |
| 36 | Erection of PCC Pole | Erection of double support with complete HT/LT fittings on 8.5 m PCC poles, including earthing, grouting, and muffing of poles as per RESPO norms | 27 | nos | con3eddsoron | 60 | |
| 37 | Erection of Pipe Earthing | Installation of pipe earthing body and neutral up to 60 feet depth or minimum water level, as per RESPO norms | 126 | nos | con3eddsoron | 60 | |
| 38 | Erection of Plinth | Construction and installation of plinth for 250 kVA transformer, complete in all respects | 63 | nos | con3eddsoron | 60 | |
| 39 | Erection of Fencing | Construction and installation of 6 feet high fencing for 250 kVA transformer including civil works for 4x4 m area complete in all respects | 63 | nos | con3eddsoron | 60 | |
| 40 | Erection of LT PCV Cable | Laying & Fixing of LT PCV Cable 4x16 Sqmm Armoured Cable | 540 | mtr | con3eddsoron | 60 | |
| 41 | Erection of LT PCV Cable | Laying & Fixing of 3.5x70/35 Sq mm | 1,280 | mtr | con3eddsoron | 60 | |
| 42 | Erection of LT PCV Cable | Laying & Fixing of LT PVC Cable 3.5x150/70 Sq mm | 760 | mtr | con3eddsoron | 60 | |
| 43 | Erection of MS Channel | Erection & Installation of MS Channel (Dropper) 100x50x2028 mm | 27 | nos | con3eddsoron | 60 | |
| 44 | Erection of M.S. Angle | Erection & Installation of M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base | 54 | nos | con3eddsoron | 60 | |
| 45 | Erection of M.S. Channel | Erection & Installation of M.S. Channel 125x65x1300 mm T-off | 27 | nos | con3eddsoron | 60 | |
| 46 | Erection of M.S. Top Channel | Erection & Installation of M.S. Top Channel 125x65x2240 mm | 27 | nos | con3eddsoron | 60 | |
| 47 | Erection of LT Fuse Set | Fixing of LT Fuse Set | 129 | nos | con3eddsoron | 60 | |
| 48 | Erection of Danger Board | Fixing of Danger Board | 27 | nos | con3eddsoron | 60 | |
| 49 | Erection of Barbed Wire | Laying & Fixing of Barbed Wire G.I. | 108 | kg | con3eddsoron | 60 | |
| 50 | Erection of Number Plate | Fixing of Number Plate | 27 | nos | con3eddsoron | 60 | |
| 51 | Erection of Copper L-Piece | Erection & Installation of Copper L-Piece 50x225x10 mm LS | 252 | nos | con3eddsoron | 60 | |
| 52 | Erection of Copper L-Piece | Erection & Installation of Copper L-Piece 62x225x12 mm LS | 252 | nos | con3eddsoron | 60 | |
| 53 | Erection of Al Leg Long Barrel | Erection & Installation of Al Leg Long Barrel of size LS | 1,512 | nos | con3eddsoron | 60 | |
| 54 | Erection of Henley Type Tailless Unit | Erection & Installation of Henley Type Tailless Unit for 250 KVA | 63 | nos | con3eddsoron | 60 | |
| 55 | Erection of ACSR Weasel Conductor | Laying sagging stringing, binding and jumpering ACSR Weasel conductor | 540 | mtr | con3eddsoron | 60 | |
| 56 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 3.5x400 Sqmm | 945 | mtr | con3eddsoron | 60 | |
| 57 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 1x400 Sqmm | 1,260 | mtr | con3eddsoron | 60 | |
| 58 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 1x240 Sqmm | 3,150 | mtr | con3eddsoron | 60 | |
| 59 | Erection of 11 KV TPMO | Erection & Installation of 11 KV TPMO | 90 | nos | con3eddsoron | 60 | |
| 60 | Erection of FUSE Set | Erection & Installation of 11 KV FUSE Set | 90 | nos | con3eddsoron | 60 | |
| 61 | Erection of Stay Set Complete | Erection & Installation of Stay Set Complete in all respect | 54 | nos | con3eddsoron | 60 | |
| 62 | Recieved back charges for Carraige of TF from site to store. | Transformer 10 KVA | 16 | nos | con3eddsoron | 60 | |
| 63 | Recieved back charges for Carraige of TF from site to store. | Transformer 16 KVA | 11 | nos | con3eddsoron | 60 | |
| 64 | Recieved back charges for Carraige of TF from site to store. | Transformer 100 KVA | 62 | nos | con3eddsoron | 60 | |
| 65 | Recieved back charges for Carraige of TF from site to store. | Transformer 160 KVA | 1 | nos | con3eddsoron | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS