Bid Publish Date
20-Aug-2025, 1:41 pm
Bid End Date
06-Sep-2025, 2:00 pm
Location
Progress
Quantity
9
Category
S and C of UG BDE Ops Room
Bid Type
Two Packet Bid
Armed Forces Tribunal invites bids for S and C of UG BDE Ops Room, S and C of Retaining wall and drain, S and F of Plumping Items, S and F of Sanitary Fitting, S and F of Internal and External Electrification, S and F of Fire alarm, Supply and Installation of 30 KVA genr set, S and C of Soakage Well, S and F of Air conditioning and Humidity control System in KINNAUR, HIMACHAL PRADESH. Quantity: 9. Submission Deadline: 06-09-2025 14: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
S and C of UG BDE Ops Room , S and C of Retaining wall and drain , S and F of Plumping Items , S and F of Sanitary Fitting , S and F of Internal and External Electrification , S and F of Fire alarm , Supply and Installation of 30 KVA genr set , S and C of Soakage Well , S and F of Air conditioning and Humidity control System
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
S and C of UG BDE Ops Room
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and C of Retaining wall and drain
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and F of Plumping Items
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and F of Sanitary Fitting
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and F of Internal and External Electrification
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and F of Fire alarm
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
Supply and Installation of 30 KVA genr set
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and C of Soakage Well
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
S and F of Air conditioning and Humidity control System
ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | S and C of UG BDE Ops Room | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 2 | S and C of Retaining wall and drain | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 3 | S and F of Plumping Items | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 4 | S and F of Sanitary Fitting | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 5 | S and F of Internal and External Electrification | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 6 | S and F of Fire alarm | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 7 | Supply and Installation of 30 KVA genr set | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 8 | S and C of Soakage Well | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 | |
| 9 | S and F of Air conditioning and Humidity control System | ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT | 1 | nos | plcdr426 | 365 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
06-Sep-2025, 2:00 pm
Opening Date
06-Sep-2025, 2:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS