TenderDekho Logo
Closed GEM

Contract Bidding Open For Cement bag 43 grade OPC in polythene bags weighing 50 Kgs,Sand Coarse confirming to IS 383 to 1970 in PITHORAGARH, UTTARAKHAND

Bid Publish Date

13-Jun-2025, 5:37 pm

Bid End Date

04-Jul-2025, 6:00 pm

EMD

₹15,048

Progress

Issue13-Jun-2025, 5:37 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

736

Category

Cement bag 43 grade OPC in polythene bags weighing 50 Kgs

Bid Type

Two Packet Bid

Categories 110

Indian Army announces a tender for Cement bag 43 grade OPC in polythene bags weighing 50 Kgs, Sand Coarse confirming to IS 383 to 1970 in PITHORAGARH, UTTARAKHAND. Quantity: 736. Submission Deadline: 04-07-2025 18: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7963354.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 80 Items Sign in for GEM prices

#1

Cement bag 43 grade OPC in polythene bags weighing 50 Kgs

Cement bag 43 grade OPC in polythene bags weighing 50 Kgs as per specifications and drawings mentioned in technical specification document

42 bags Delivery: 90 days
#2

Sand Coarse confirming to IS 383 to 1970 and 2nd revision

Sand Coarse confirming to IS 383 to 1970 and 2nd revision as per specifications and drawings mentioned in technical specification document

9 cum Delivery: 90 days
#3

Crushed stone aggregate 40mm graded

Crushed stone aggregate 40mm graded as per specifications and drawings mentioned in technical specification document

2 cum Delivery: 90 days
#4

Crushed stone aggregate 20mm graded

Crushed stone aggregate 20mm graded as per specifications and drawings mentioned in technical specification document

3 cum Delivery: 90 days
#5

RR stone

RR stone as per specifications and drawings mentioned in technical specification document

21 cum Delivery: 90 days
#6

Hard core of broken stone aggregate of size 45 to 63 mm

Hard core of broken stone aggregate of size 45 to 63 mm as per specifications and drawings mentioned in technical specification document

2 cum Delivery: 90 days
#7

Supply of pre fabricated structure of FRP Toilet Block of size 3 point 6M x 1 point 8M and 2 point 1 clear height

Supply of pre fabricated structure of FRP Toilet Block of size 3 point 6M x 1 point 8M and 2 point 1 clear height as per specifications and drawings mentioned in technical specification document

1 set Delivery: 90 days
#8

FRP and PUF foam roof curved shape panel as per drg and Technical specification

FRP and PUF foam roof curved shape panel as per drg and Technical specification as per specifications and drawings mentioned in technical specification document

1 set Delivery: 90 days
#9

FRP and PUF foam wall panels as per drg and Technical specification

FRP and PUF foam wall panels as per specifications and drawings mentioned in technical specification document

1 set Delivery: 90 days
#10

FRP and water proof ply wood 24 point 40 mm thick flooring panels as per drg and Technical specification

FRP and water proof ply wood 24 point 40 mm thick flooring panels as per specifications and drawings mentioned in technical specification document

1 set Delivery: 90 days
#11

FRP door of size 700mm x 1800mm including fixing and locking arrangenent as per drg and Technical specification

FRP door of size 700mm x 1800mm including fixing and locking arrangenent as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#12

FRP frame with sliding shutter ventilator of size 600mmx 450mm as per drg and Technical specification

FRP frame with sliding shutter ventilator of size 600mmx 450mm as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#13

5mtr long 8mm galvanized SWR wire for anchoring FRP Toilet block

5mtr long 8mm galvanized SWR wire for anchoring FRP Toilet block as per specifications and drawings mentioned in technical specification document

8 nos Delivery: 90 days
#14

25mm thick 7 point 5cm dia ring and 60cm long steel angle iron 50 x 50 x 6mm for anchoring FRP Toilet block complete all accessories

25mm thick 7 point 5cm dia ring and 60cm long steel angle iron 50 x 50 x 6mm for anchoring FRP Toilet block complete all accessories as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#15

Neoprene gaskets 75mm width with sealent as per tech specifications

Neoprene gaskets 75mm width with sealent as per specifications and drawings mentioned in technical specification document

100 rm Delivery: 90 days
#16

Bolts and nuts and washers of size 12mm dia 100mm long

Bolts and nuts and washers of size 12mm dia 100mm long as per specifications and drawings mentioned in technical specification document

90 nos Delivery: 90 days
#17

Bulk head fitting with Auto rechargable LED BULB 15W

Bulk head fitting with Auto rechargable LED BULB 15W as per specifications and drawings mentioned in technical specification document

1 set Delivery: 90 days
#18

Holder Pendent

Holder Pendent as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#19

Auto rechargable LED BULB 15W

Auto rechargable LED BULB 15W as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#20

MCB 32 Amp SPN

MCB 32 Amp SPN as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#21

Star Screw full thread 25 mm Each packet 200

Star Screw full thread 25 mm Each packet 200 as per specifications and drawings mentioned in technical specification document

3 pkt Delivery: 90 days
#22

Insulation tape half inch x 25 Mtr with ISI mark

Insulation tape half inch x 25 Mtr with ISI mark as per specifications and drawings mentioned in technical specification document

3 roll Delivery: 90 days
#23

Elect Wire Single core copper conductor 1 point 5 Sqmm

Elect Wire Single core copper conductor 1 point 5 Sqmm as per specifications and drawings mentioned in technical specification document

36 rm Delivery: 90 days
#24

Elect Wire two core copper conductor 6 Sqmm

Elect Wire two core copper conductor 6 Sqmm as per specifications and drawings mentioned in technical specification document

50 rm Delivery: 90 days
#25

Modular switch piano and flush type 5 Amp

Modular switch piano and flush type 5 Amp as per specifications and drawings mentioned in technical specification document

5 nos Delivery: 90 days
#26

PVC casing and capping of size 25 mm

PVC casing and capping of size 25 mm as per specifications and drawings mentioned in technical specification document

25 rm Delivery: 90 days
#27

PVC casing and capping of size 25 mm TEE

PVC casing and capping of size 25 mm TEE as per specifications and drawings mentioned in technical specification document

10 nos Delivery: 90 days
#28

PVC casing and capping of size 25 mm Elbow

PVC casing and capping of size 25 mm Elbow as per specifications and drawings mentioned in technical specification document

10 nos Delivery: 90 days
#29

PVC casing and capping of size 25 mm Common

PVC casing and capping of size 25 mm Common as per specifications and drawings mentioned in technical specification document

5 nos Delivery: 90 days
#30

MCB Box 2 way SPN

MCB Box 2 way SPN as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#31

PVC modular switch board 6 x 4 inch

PVC modular switch board 6 x 4 inch as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#32

PVC P Trap 110mm

PVC P Trap 110mm as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#33

PVC Pipe 110mm dia and 6 mtr long

PVC Pipe 110mm dia and 6 mtr long as per specifications and drawings mentioned in technical specification document

7 nos Delivery: 90 days
#34

PVC Socket 110mm dia

PVC Socket 110mm dia as per specifications and drawings mentioned in technical specification document

3 nos Delivery: 90 days
#35

PVC SWR Bend with oval access door 110mm dia

PVC SWR Bend with oval access door 110mm dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#36

PVC SWR Bend plain 110mm dia

PVC SWR Bend plain 110mm dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#37

PVC SWR Tee 110mm dia

PVC SWR Tee 110mm dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#38

PVC Short connection 300 oblique 450mm long

PVC Short connection 300 oblique 450mm long as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#39

Each shelter should have 01 Nos of 500 ltrs HDPE water tanks Triple layer

Each shelter should have 01 Nos of 500 ltrs HDPE water tanks Triple layer as per specifications and drawings mentioned in technical specification document

1 set Delivery: 90 days
#40

PPR Gate valve 32mm outer dia

PPR Gate valve 32mm outer dia as per specifications and drawings mentioned in technical specification document

2 nos Delivery: 90 days
#41

PPR Tank connector inner dia 32 mm

PPR Tank connector inner dia 32 mm as per specifications and drawings mentioned in technical specification document

2 nos Delivery: 90 days
#42

PPR Elbow 32mm dia

PPR Elbow 32mm dia as per specifications and drawings mentioned in technical specification document

5 nos Delivery: 90 days
#43

PPR TEE 32mm dia

PPR TEE 32mm dia as per specifications and drawings mentioned in technical specification document

2 nos Delivery: 90 days
#44

Sealing thread

Sealing thread as per specifications and drawings mentioned in technical specification document

4 roll Delivery: 90 days
#45

PPR Tee Reducer 15x 25 mm inner dia

PPR Tee Reducer 15x 25 mm inner dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#46

PPR Pipe 20mm outer dia with complete fitting

PPR Pipe 20mm outer dia with complete fitting as per specifications and drawings mentioned in technical specification document

30 mtr Delivery: 90 days
#47

PPR Pipe 32mm outer dia with complete fitting

PPR Pipe 32mm outer dia with complete fitting as per specifications and drawings mentioned in technical specification document

30 mtr Delivery: 90 days
#48

PPR Union 32mm dia

PPR Union 32mm dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#49

PPR Socket 32mm dia

PPR Socket 32mm dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#50

PPR Elbow 20mm

PPR Elbow 20mm as per specifications and drawings mentioned in technical specification document

5 nos Delivery: 90 days
#51

PPR Socket 20mm

PPR Socket 20mm as per specifications and drawings mentioned in technical specification document

5 nos Delivery: 90 days
#52

PPR Reducer socket 32mm x 20mm

PPR Reducer socket 32mm x 20mm as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#53

CP Bib cock Long body chromium plated 15 mm dia

CP Bib cock Long body chromium plated 15 mm dia as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#54

CP Pillar Tap 15 mm bore

CP Pillar Tap 15 mm bore as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#55

CP Stock cock of 15mm bore

CP Stock cock of 15mm bore as per specifications and drawings mentioned in technical specification document

6 nos Delivery: 90 days
#56

Vitreous china wash hand basin and white and flat back and size 580 x 400mm including CP waste coupling and PVC waste pipe and complete fixing

Vitreous china wash hand basin and white and flat back and size 580 x 400mm including CP waste coupling and PVC waste pipe and complete fixing as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#57

Bathroom Cabinet with looking mirror for toiletry items of size 300mm x 450mm with arrangements to fix the same with wall shall be provided

Bathroom Cabinet with looking mirror for toiletry items of size 300mm x 450mm with arrangements to fix the same with wall shall be provided as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#58

FRP IWC of standard size in three cabins with S oblique P trap shall be provided with flushing cistern

FRP IWC of standard size in three cabins with S oblique P trap shall be provided with flushing cistern as per specifications and drawings mentioned in technical specification document

3 nos Delivery: 90 days
#59

PPR Wall Clamp dia 25mm

PPR Wall Clamp dia 25mm as per specifications and drawings mentioned in technical specification document

10 nos Delivery: 90 days
#60

100mm dia stainless steel grating

100mm dia stainless steel grating as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#61

SS Soap Dish holder

SS Soap Dish holder as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#62

Silicon tube 200gm

Silicon tube 200gm as per specifications and drawings mentioned in technical specification document

10 nos Delivery: 90 days
#63

Solar Street Light 25W including pole having length 5 mtr long and 75mm dia and complete accessories Warranty for street lighting system including battery min 2 years

Solar Street Light 25W including pole having length 5 mtr long and 75mm dia and complete accessories Warranty for street lighting system including battery min 2 years as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#64

Fd Water Heating Eqpt Solar oblique K Oil Based with 500 ltr tank capacity and made of 2 mm thick stainless steel sheet grade 304 and MS angle and frame legs of size 40 x 40 x 5 mm thick

Fd Water Heating Eqpt Solar oblique K Oil Based with 500 ltr tank capacity and made of 2 mm thick stainless steel sheet grade 304 and MS angle and frame legs of size 40 x 40 x 5 mm thick as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#65

CGI Sheet 3000mm x 900mm x zero point 60mmconfirming to IS 277

CGI Sheet 3000mm x 900mm x zero point 60mmconfirming to IS 277 as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#66

GI Pipe 50mm dia and 2400 long

GI Pipe 50mm dia and 2400 long as per specifications and drawings mentioned in technical specification document

4 nos Delivery: 90 days
#67

Barbed wire 14 SWG and 2mm thick

Barbed wire 14 SWG and 2mm thick as per specifications and drawings mentioned in technical specification document

60 mtr Delivery: 90 days
#68

LAIP 45 x 45 x 6mm and 1830mm long

LAIP 45 x 45 x 6mm and 1830mm long as per specifications and drawings mentioned in technical specification document

5 nos Delivery: 90 days
#69

Silicon Gun for applying silicon tube

Silicon Gun for applying silicon tube as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#70

Drilling Machine portable

Drilling Machine portable as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#71

Mason thread nylon 3mm dia x 100 Mtr long Roll

Mason thread nylon 3mm dia x 100 Mtr long Roll as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#72

Adjustable spanner 10 inch

Adjustable spanner 10 inch as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#73

Screw Driver

Screw Driver as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#74

Self supporting aluminium step ladder 6 feet height

Self supporting aluminium step ladder 6 feet height as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#75

Trawal Brick 250mm

Trawal Brick 250mm as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#76

Shovel hand GS 12 feet 1 point 6 Kg with fibre handle

Shovel hand GS 12 feet 1 point 6 Kg with fibre handle as per specifications and drawings mentioned in technical specification document

2 nos Delivery: 90 days
#77

Measuring tape 5mtr retractable grade AI 16

Measuring tape 5mtr retractable grade AI 16 as per specifications and drawings mentioned in technical specification document

1 nos Delivery: 90 days
#78

Hand gloves rubber

Hand gloves rubber as per specifications and drawings mentioned in technical specification document

25 pair Delivery: 90 days
#79

02 x Mason to be deployed for 01 month to execute the masonry wks required in the job for timely exec of the wk

02 x Mason to be deployed for 01 month to execute the masonry wks required in the job for timely exec of the wk as per specifications and drawings mentioned in technical specification document

2 nos Delivery: 90 days
#80

02 x Plumber to be deployed for 01 month to execute the plumbing wks required in the job for timely exec of the wk

02 x Plumber to be deployed for 01 month to execute the plumbing wks required in the job for timely exec of the wk as per specifications and drawings mentioned in technical specification document

2 nos Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

What are the eligibility requirements for tender GEM/2025/B/6341491?

The eligibility requirements include being a registered entity with valid certification in construction materials supply. Bidders must demonstrate compliance with technical specifications and quality standards outlined in the tender documents to qualify for participation.

What certificates are required to participate in the tender?

Bidders must provide valid certificates of registration, compliance with IS standards, and any other relevant quality assurance documents highlighting their capability to meet the technical and financial requirements specified in the tender.

What is the registration process for potential bidders?

The registration process requires interested bidders to submit an application along with necessary documentation, including proof of eligibility and industrial registration. Bidders must ensure that all submissions are complete and within the required formats, adhering strictly to the instructions provided in the tender documentation.

What formats are accepted for document submission?

Documents should be submitted in standard formats such as PDF or DOCX. It's important for bidders to ensure that all files meet the specified guidelines to avoid disqualification based on submission format issues.

What financial guarantees are needed to secure a bid?

Bidders must submit an Earnest Money Deposit (EMD) alongside their financial proposals. Additionally, performance security requirements must be clearly outlined in the tender response to ensure compliance with payment terms and safeguard the interests of contracting parties.