Progress
Bharat Heavy Electricals Limited (BHEL) invites bids for the CONTROL VALVES PACKAGE for the HINDALCO-LAPANGA PROJECT as per Annexure-2A. Location: SAMBALPUR, ODISHA. Scope: Supply of Goods under the bid; BOQ items indicated as per annexure with zero listed items in the current data. Bidder must meet OEM turnover criteria and submit standard KYC and financial documents. The procurement includes an option clause allowing ±25% quantity variation at contract, with delivery timing calculated from the last original delivery order date and extended period, with a minimum 30 days extra time.
Product/service: CONTROL VALVES PACKAGE as per Annexure-2A
Quantity: up to 25% option quantity variation
Estimated value: Not disclosed in data
Standards/Compliance: IS 550 or other standards not specified in data
Delivery: period calculated from last date of original delivery order; minimum extension 30 days
Warranty/AMC: Not specified in data
Option clause allows ±25% quantity change during contract
Delivery period calculated from last original delivery date with minimum 30 days extension
GeM GST invoice upload and GST payment screenshot required
OEM turnover criteria applies; three-year turnover data required
No liquidation or bankruptcy; bidder undertakings required
GST-compliant invoicing on GeM; no explicit advance or milestone terms provided in data
Delivery begins from the last date of the original delivery order; extended delivery time follows (quantity/original quantity) × original delivery period, minimum 30 days
Contract termination rights exist for non-delivery, misrepresentation, or bankruptcy; LD terms not detailed in data
OEM turnover must meet the minimum average annual turnover over the last 3 years
Not under liquidation or similar proceedings
Ability to supply goods only (no installation/maintenance scope stated)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ENOCH CONTROLS PRIVATE LIMITED Under PMA | Make : Enoch Model : Enoch Series 12000 Title : CONTROL VALVES PACKAGE FOR HINDALCO-LAPANGA (BOQ AS PER ANNEXURE-2A) PROJECT | 06-04-2026 14:13:44 | |
| 2 | KSB MIL CONTROLS LIMITED Under PMA | Make : KSB Model : MIL 41000 Title : CONTROL VALVES PACKAGE FOR HINDALCO-LAPANGA (BOQ AS PER ANNEXURE-2A) PROJECT | 01-04-2026 17:41:35 | |
| 3 | R K CONTROL INSTRUMENTS PRIVATE LIMITED Under PMA | Make : RK CONTROL INSTRUMENTS Model : RK-SERIES 10 VALVE PACKAGE Title : CONTROL VALVES PACKAGE FOR HINDALCO-LAPANGA (BOQ AS PER ANNEXURE-2A) PROJECT | 29-03-2026 22:36:00 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | KSB MIL CONTROLS LIMITED(MII) Under PMA | Item Categories : CONTROL VALVES PACKAGE FOR HINDALCO-LAPANGA (BOQ AS PER ANNEXURE-2A) PROJECT |
Please sign in or create an account to view contract details and download result documents.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
Min. Avg. Annual Turnover
68
OEM Avg. Turnover
68
Past Performance
70 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CONTROL VALVES PACKAGE FOR HINDALCO-LAPANGA (BOQ AS PER ANNEXURE-2A) PROJECT
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
14-Apr-2026, 7:30 am
Opening Date
14-Apr-2026, 8:00 am
Extended Deadline
06-Apr-2026, 7:30 am
Opening Date
06-Apr-2026, 8:00 am
Extended Deadline
02-Apr-2026, 8:30 am
Opening Date
02-Apr-2026, 9:00 am
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate (certified by Bank)
undertaking of non-liquidation/bankruptcy
GST invoice and GST portal payment screenshot (GeM upload)
Key insights about ODISHA tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, and EFT mandate; ensure OEM turnover meets the last three-year average; provide undertaking against liquidation; submit GST invoice and GST payment proof on GeM; comply with the 25% optional quantity clause and delivery time rules.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, and an undertaking asserting no liquidation or bankruptcy. Also prepare OEM authorization, financials, and prior project experience if available to support turnover criteria.
Delivery starts from the last date of the original order; additional time equals (increased quantity / original quantity) × original delivery period, with a minimum of 30 days; the buyer can extend to the original delivery period under the option clause.
Submit GST invoice on GeM with the screenshot of GST portal confirming GST payment; no explicit advance payment terms provided; follow standard GeM payment processing and supplier compliance for tax documents.
The OEM must demonstrate minimum average annual turnover over the last three financial years ending 31st March of the previous year; exact amount is not disclosed in data, but it is a mandatory criterion.
Yes. The buyer may terminate for material breach, failure to deliver on time, bankruptcy, or misrepresentation; termination rights are explicit, with conditions tied to delivery and performance.
Scope is limited to the supply of goods only; installation or after-sales service is not specified; bidders should confirm any OEM warranties and compliance with Annexure-2A requirements.
The option clause permits up to 25% increase or decrease in quantity at contract time and during currency, enabling flexible fulfillment; delivery timing adjusts accordingly based on the extended quantity.