TenderDekho Logo
Closed GEM

Open Tender for Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform in KAMRUP, ASSAM

Bid Publish Date

27-May-2026, 2:44 pm

Bid End Date

06-Jun-2026, 3:00 pm

EMD

₹36,300

Location

Progress

RA
Issue27-May-2026, 2:44 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

1458

Category

Curtain Rod 20 MM

Bid Type

Two Packet Bid

Categories 85

Indian Army announces a tender for Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931, Copper alloy Taps/Stop Valves (V2) Conform in KAMRUP, ASSAM. Quantity: 1458. Submission Deadline: 06-06-2026 15: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 16

GeM-Bidding-9355187.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

CATALOG-Specification-3

CATALOG Specification

CATALOG-Specification-4

CATALOG Specification

CATALOG-Specification-5

CATALOG Specification

CATALOG-Specification-6

CATALOG Specification

CATALOG-Specification-7

CATALOG Specification

CATALOG-Specification-8

CATALOG Specification

CATALOG-Specification-9

CATALOG Specification

CATALOG-Specification-10

CATALOG Specification

CATALOG-Specification-11

CATALOG Specification

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 113 Items Sign in for GEM prices

#1

CP Towel Rail 450 mm

CP Towel Rail 450 mm

12 nos Delivery: 90 days
#2

Barrel Nipple 20 mm x 200 mm

Barrel Nipple 20 mm x 200 mm

4 nos Delivery: 90 days
#3

Beveled edge mirror 600 x 450 mm

Beveled edge mirror 600 x 450 mm

2 nos Delivery: 90 days
#4

Bib cock brass 15mm

Bib cock brass 15mm

21 nos Delivery: 90 days
#5

Bib Cock Brass 20 mm

Bib Cock Brass 20 mm

3 nos Delivery: 90 days
#6

Bracket and funnel 20 mm for curtain Rod

Bracket and funnel 20 mm for curtain Rod

3 prs Delivery: 90 days
#7

Butt hinges MS 100mm

Butt hinges MS 100mm

46 nos Delivery: 90 days
#8

Butt hinges MS 75 mm

Butt hinges MS 75 mm

16 nos Delivery: 90 days
#9

Cloth Malmal

Cloth Malmal

15 rm Delivery: 90 days
#10

Cover for Water Tank 1000 Ltrs

Cover for Water Tank 1000 Ltrs

16 nos Delivery: 90 days
#11

CP Bathroom Glass Shelf Straight with railing 15 mm

CP Bathroom Glass Shelf Straight with railing 15 mm

7 nos Delivery: 90 days
#12

CP Bib Cock 20 mm

CP Bib Cock 20 mm

9 nos Delivery: 90 days
#13

CP Bib Cock Fancy Type 15 mm

CP Bib Cock Fancy Type 15 mm

5 nos Delivery: 90 days
#14

CP Shower Rose 15 mm inlet 100 mm dia

CP Shower Rose 15 mm inlet 100 mm dia

16 nos Delivery: 90 days
#15

CP Soap Dish

CP Soap Dish

27 nos Delivery: 90 days
#16

CP Stop cock Male 15 mm

CP Stop cock Male 15 mm

10 nos Delivery: 90 days
#17

CP Stop cock Male 20 mm

CP Stop cock Male 20 mm

10 nos Delivery: 90 days
#18

CP Toilet Paper Holder

CP Toilet Paper Holder

3 nos Delivery: 90 days
#19

CP Towel Rail 600 mm

CP Towel Rail 600 mm

4 nos Delivery: 90 days
#20

CP Towel Ring

CP Towel Ring

12 nos Delivery: 90 days
#21

Curtain Rod 20 MM

Curtain Rod 20 MM

6 rm Delivery: 90 days
#22

Door handle 200 mm Alu

Door handle 200 mm Alu

6 nos Delivery: 90 days
#23

Emery Paper 100

Emery Paper 100

10 nos Delivery: 90 days
#24

Emery Paper 120

Emery Paper 120

8 nos Delivery: 90 days
#25

Emery Paper 60

Emery Paper 60

8 nos Delivery: 90 days
#26

Emery Paper 80

Emery Paper 80

8 nos Delivery: 90 days
#27

Fevicol SH 1 Kg

Fevicol SH 1 Kg

2 kgs Delivery: 90 days
#28

French Polish

French Polish

2 ltrs Delivery: 90 days
#29

Gate Valve 20 mm

Gate Valve 20 mm

10 nos Delivery: 90 days
#30

GI Bend 15 mm ISI marked

GI Bend 15 mm ISI marked

4 nos Delivery: 90 days
#31

GI Elbow 15 mm ISI

GI Elbow 15 mm ISI

20 nos Delivery: 90 days
#32

GI Elbow 20 mm ISI

GI Elbow 20 mm ISI

32 nos Delivery: 90 days
#33

GI Elbow reducing 15 x 20 mm ISI Marked

GI Elbow reducing 15 x 20 mm ISI Marked

19 nos Delivery: 90 days
#34

GI Elbow reducing 20 x 25 mm ISI Marked

GI Elbow reducing 20 x 25 mm ISI Marked

9 nos Delivery: 90 days
#35

GI Nipple 15 mm x 50mm

GI Nipple 15 mm x 50mm

13 nos Delivery: 90 days
#36

GI Nipple 15 mm x 75mm

GI Nipple 15 mm x 75mm

10 nos Delivery: 90 days
#37

GI Nipple 15 x 100 mm long

GI Nipple 15 x 100 mm long

3 nos Delivery: 90 days
#38

GI Nipple 15 x 300 mm

GI Nipple 15 x 300 mm

6 nos Delivery: 90 days
#39

GI Nipple 20 mm dia x 300 mm long ISI Marked

GI Nipple 20 mm dia x 300 mm long ISI Marked

11 nos Delivery: 90 days
#40

GI Nipple 20 mm dia x 50 mm long ISI Marked

GI Nipple 20 mm dia x 50 mm long ISI Marked

10 nos Delivery: 90 days
#41

GI Nipple 20 x 150 mm ISI Marked

GI Nipple 20 x 150 mm ISI Marked

15 nos Delivery: 90 days
#42

GI Plug 15 mm

GI Plug 15 mm

45 nos Delivery: 90 days
#43

GI Plug 20 mm

GI Plug 20 mm

30 nos Delivery: 90 days
#44

GI Plug 25 MM

GI Plug 25 MM

1 nos Delivery: 90 days
#45

GI Socket 15 mm

GI Socket 15 mm

16 nos Delivery: 90 days
#46

GI Socket 25 mm

GI Socket 25 mm

5 nos Delivery: 90 days
#47

GI Tee 15 mm

GI Tee 15 mm

7 nos Delivery: 90 days
#48

GI Tee 20 mm ISI Marked

GI Tee 20 mm ISI Marked

11 nos Delivery: 90 days
#49

GI Tee 20 x 20 x 25 mm ISI Marked

GI Tee 20 x 20 x 25 mm ISI Marked

12 nos Delivery: 90 days
#50

GI Tee 20 x20 x 15 mm

GI Tee 20 x20 x 15 mm

11 nos Delivery: 90 days
#51

GI Tubing pipe 15 mm dia med grade ISI

GI Tubing pipe 15 mm dia med grade ISI

57 rm Delivery: 90 days
#52

GI Tubing pipe 20 mm dia med grade ISI Marked

GI Tubing pipe 20 mm dia med grade ISI Marked

52 rm Delivery: 90 days
#53

GI Union 40 mm

GI Union 40 mm

1 nos Delivery: 90 days
#54

GI Union socket 15mm

GI Union socket 15mm

11 nos Delivery: 90 days
#55

GI Union socket 20 mm

GI Union socket 20 mm

10 nos Delivery: 90 days
#56

GI Union Socket 25 mm

GI Union Socket 25 mm

3 nos Delivery: 90 days
#57

GI Wire mesh 0 point 36mm x 15 Mtr Long 1 Mtr Wide

GI Wire mesh 0 point 36mm x 15 Mtr Long 1 Mtr Wide

62 kgs Delivery: 90 days
#58

Glass 3 mm Frosted

Glass 3 mm Frosted

3 sqmtr Delivery: 90 days
#59

Glass Pain 3 MM Thick

Glass Pain 3 MM Thick

3 sqmtr Delivery: 90 days
#60

Glass Putty 250 Gram

Glass Putty 250 Gram

3 pkts Delivery: 90 days
#61

Glass shelf Straight with CP Railing 20 inch

Glass shelf Straight with CP Railing 20 inch

3 nos Delivery: 90 days
#62

Hand Shower With hook and Tube 1 point 5 Mtr

Hand Shower With hook and Tube 1 point 5 Mtr

3 nos Delivery: 90 days
#63

Headless Nails 17 mm

Headless Nails 17 mm

3 kgs Delivery: 90 days
#64

Headless Nails 20 mm

Headless Nails 20 mm

3 kgs Delivery: 90 days
#65

Headless Nails 25 mm

Headless Nails 25 mm

3 kgs Delivery: 90 days
#66

Kitchen rack 24 x 30 x 10 inch

Kitchen rack 24 x 30 x 10 inch

5 nos Delivery: 90 days
#67

Kitchen Sink with Drain Board 1145 x 510 mm 45 inch x20 inch

Kitchen Sink with Drain Board 1145 x 510 mm 45 inch x20 inch

2 nos Delivery: 90 days
#68

Kitchen Sink with single Bowl 19x16 inch

Kitchen Sink with single Bowl 19x16 inch

3 nos Delivery: 90 days
#69

Kitchen Sink with single bowl 24x18 inch

Kitchen Sink with single bowl 24x18 inch

1 nos Delivery: 90 days
#70

Looking Mirror Glass 450 x 600 mm x 3 mm

Looking Mirror Glass 450 x 600 mm x 3 mm

22 nos Delivery: 90 days
#71

M Seal 1 Kg Pack

M Seal 1 Kg Pack

22 nos Delivery: 90 days
#72

Paint Brush Size 75 mm

Paint Brush Size 75 mm

4 nos Delivery: 90 days
#73

Paint Brush Small size 12 or 10 mm

Paint Brush Small size 12 or 10 mm

2 nos Delivery: 90 days
#74

Pillar Cock 15 mm Sleek

Pillar Cock 15 mm Sleek

25 nos Delivery: 90 days
#75

Plywood 7 x 3 12 mm 7 ply commercial BWR Grade

Plywood 7 x 3 12 mm 7 ply commercial BWR Grade

36 sqft Delivery: 90 days
#76

Plywood 8 ft x 4 ft 4 mm Commercial BWR Grade

Plywood 8 ft x 4 ft 4 mm Commercial BWR Grade

52 sqft Delivery: 90 days
#77

Pre Laminated Particle Board 18 or 20 mm thick 8 x 4 mm

Pre Laminated Particle Board 18 or 20 mm thick 8 x 4 mm

61 sqft Delivery: 90 days
#78

PVC Bib Cock Long Body 15 mm

PVC Bib Cock Long Body 15 mm

25 nos Delivery: 90 days
#79

PVC Bib Cock 15 mm

PVC Bib Cock 15 mm

47 nos Delivery: 90 days
#80

PVC Bib Cock 20 mm

PVC Bib Cock 20 mm

3 nos Delivery: 90 days
#81

PVC Connection Pipe 600 mm

PVC Connection Pipe 600 mm

12 nos Delivery: 90 days
#82

PVC connection premium 18 with Brass CP Nut

PVC connection premium 18 with Brass CP Nut

12 nos Delivery: 90 days
#83

PVC Flush Cistern Smart Type 5 Ltrs

PVC Flush Cistern Smart Type 5 Ltrs

2 nos Delivery: 90 days
#84

PVC Grating 100 or 125 mm

PVC Grating 100 or 125 mm

8 nos Delivery: 90 days
#85

PVC PTMTStop Cock Ext Thread 15 mm

PVC PTMTStop Cock Ext Thread 15 mm

4 nos Delivery: 90 days
#86

PVC Seat Cover for Toilet EWC

PVC Seat Cover for Toilet EWC

9 nos Delivery: 90 days
#87

Roofing Fabric PBS Roll 1mm thick 20 Mtr Long 1 Mtr Wide

Roofing Fabric PBS Roll 1mm thick 20 Mtr Long 1 Mtr Wide

27 roll Delivery: 90 days
#88

S S Grating 4 inch

S S Grating 4 inch

2 nos Delivery: 90 days
#89

S S Grating 6 inch

S S Grating 6 inch

3 nos Delivery: 90 days
#90

Sliding Door bolt 300 mm with hasp

Sliding Door bolt 300 mm with hasp

3 nos Delivery: 90 days
#91

SS Screw 25 mm

SS Screw 25 mm

1 pkts Delivery: 90 days
#92

SS Screw 40 mm

SS Screw 40 mm

3 pkts Delivery: 90 days
#93

Stop Valve Brass 20 mm

Stop Valve Brass 20 mm

5 nos Delivery: 90 days
#94

Synthetic Enamel Black Paint 1 Litre Pack

Synthetic Enamel Black Paint 1 Litre Pack

9 nos Delivery: 90 days
#95

Synthetic Enamel Smoke or dove Grey Paint 1 Litre Pack

Synthetic Enamel Smoke or dove Grey Paint 1 Litre Pack

5 ltrs Delivery: 90 days
#96

Thinner 1 Litre

Thinner 1 Litre

6 nos Delivery: 90 days
#97

Touch Wood 1 Litre Glossy

Touch Wood 1 Litre Glossy

3 nos Delivery: 90 days
#98

Tower Bolt 100 mm

Tower Bolt 100 mm

6 nos Delivery: 90 days
#99

Universal Door Stopper

Universal Door Stopper

6 nos Delivery: 90 days
#100

Wash Hand basin 550x400 mm

Wash Hand basin 550x400 mm

1 nos Delivery: 90 days
#101

Wash Hand basin Small 450 X 300 MM

Wash Hand basin Small 450 X 300 MM

3 nos Delivery: 90 days
#102

Waste Coupling for kitchen stainless steel sink outer plastic covered inner stainless steel 100 mm

Waste Coupling for kitchen stainless steel sink outer plastic covered inner stainless steel 100 mm

13 nos Delivery: 90 days
#103

Waste Fitting for size 32 mm for wash basin

Waste Fitting for size 32 mm for wash basin

4 nos Delivery: 90 days
#104

Water Storage Tank 5000 Ltrs

Water Storage Tank 5000 Ltrs

1 nos Delivery: 90 days
#105

Water Tank 1000 Ltrs

Water Tank 1000 Ltrs

9 nos Delivery: 90 days
#106

Water Tank 500 Ltrs

Water Tank 500 Ltrs

16 nos Delivery: 90 days
#107

WHB Flat Face 590 x 490 x 185mm

WHB Flat Face 590 x 490 x 185mm

5 nos Delivery: 90 days
#108

White Cement 1 Kg Bag

White Cement 1 Kg Bag

21 nos Delivery: 90 days
#109

Cover for Water Tank 500 Ltrs

Cover for Water Tank 500 Ltrs

36 nos Delivery: 90 days
#110

CP Bib Cock Long Body 20 mm

CP Bib Cock Long Body 20 mm

3 nos Delivery: 90 days
#111

Kitchen Rack 24 x 36 x 10 inch

Kitchen Rack 24 x 36 x 10 inch

2 nos Delivery: 90 days
#112

Synthetic Enamel White paint 1 Litre Pack

Synthetic Enamel White paint 1 Litre Pack

4 nos Delivery: 90 days
#113

Synthetic Enamel Ogor light OG paint 1 Ltr pack

Synthetic Enamel Ogor light OG paint 1 Ltr pack

2 nos Delivery: 90 days

Technical Specifications 11 Items

Item #1 Details

View Catalog
Category Specification Requirement
Specification Governing Specification Conforming to IS 8931
Type Item Type 3 Bib tap
Type Dimension As per table 4 of the governing specification
Type Nominal Size of bore of pipe to which taps and valves are fitted(in mm) 15
Material Material of body, body components, nozzle , bonnet and back nuts Die cast brass
Material Material of inlet tubes Copper tubes
Material Material of flanges Brass rods
Material Material of diverter and diverter components NA
Material Material of spindle, glands, washer plate, nuts, screw and pin Forged brass
Material Material of circlip, wire locks Stainless steel
Material Material of 'O' ring , gasket, and seat washer Acrylonitrille butadiene rubber (ABR)
Material Material of Knob and knob components Brass rods
Generic Aerating device fitted with tap No
Generic Flow straightening device fitted with tap No
Warranty Warranty (in months) 6

Reverse Auction Schedule

Completed

Start

10-Jun-2026, 7:00 pm

End

11-Jun-2026, 7:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1SILIGURI SALES AGENCY(MII)   Under PMA Winner ₹11,12,919Item Categories : Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform
L2BAJAJ TRADING CO. (MII)   Under PMA₹11,24,715Item Categories : Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform
L3TAPAN KR. CHOWDHURY (MII)   Under PMA₹11,26,519Item Categories : Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform

🎉 L1 Winner

SILIGURI SALES AGENCY(MII)   Under PMA

Final Price: ₹11,12,919