Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Aerial, Und
N/A
NAGPUR, MAHARASHTRA
Bid Publish Date
25-Jun-2026, 10:55 am
Bid End Date
06-Jul-2026, 11:00 am
Location
Progress
Quantity
2
POWERGRID invites bids for leasing connectivity fiber between IB-MAC, Vijayawada, with two distinct paths in Andhra Pradesh. The project involves Link-I at SriNilayam Apartment, H.No.1-230, Sai Nagar, Poranki-521137 and Link-II at Pantakaluva Road, NTR Marg, Kanuru, Vijayawada 520007. Both paths require rapid deployment with a 1-week delivery timeline. The contract references an amended SLA and an ITB/ATC attachment, plus a Vendor Grievance mechanism via the POWERGRID portal. The BOQ shows no line items, indicating a service-level leasing agreement rather than conventional procurement. This tender emphasizes connectivity provisioning and SLA adherence over hardware procurement, suitable for telecom/ISP vendors with turnkey fiber networking capabilities. Geographic focus is Vijayawada, Andhra Pradesh, under PowerGrid’s regional network expansion program. Unique aspects include IP-restriction compliance (same IP bidders may face rejection) and access to the Vendor Grievance Portal for post-award issues. The opportunity targets vendors capable of rapid, secure link provisioning with documented SLA governance and performance monitoring.
Fiber leasing for IB-MAC Vijayawada connectivity
Delivery timelines: 1 Week for both Link-I and Link-II
Link-I location details with Lat/Long
Link-II location details
Amended SLA and ITB/ATC attachments
Vendor grievance mechanism via VGP
IP-based bidder eligibility restriction
1-week delivery for both connectivity links
Amended SLA governs service performance
IP address-based bidder eligibility check
Not specified in provided data; refer to ITB/ATC attachments for payment milestones and security deposits
Delivery for Link-I and Link-II must be completed within 1 week of order placement per tender terms
Not specified in provided data; SLA documents will define performance penalties and penalties for delays
Vendors capable of rapid fiber leasing and provisioning in Vijayawada region
Compliance with IP-based eligibility checks to avoid rejection
Possession of necessary licenses/certifications for telecom fiber deployment
Tender Category
Service
Bid To RA
No
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
N/A
NAGPUR, MAHARASHTRA
N/A
BANGALORE, KARNATAKA
N/A
GANDHI NAGAR, GUJARAT
N/A
NAGPUR, MAHARASHTRA
N/A
GANDHI NAGAR, GUJARAT
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates in fiber leasing / telecom connectivity
Financial statements / balance sheets
EMD/Security deposit documentation as per ATC
Technical bid documents and compliance certificates
OEM authorizations (if applicable for equipment/links)
ATC, SLA attachments and ITB documents
Bidders must submit GST, PAN, experience certificates, and financial statements along with EMD as per ATC. Review ITB/ATC and SLA attachments for compliance, deliverables, and the 1-week installation timelines for both links. Access the VGP for grievance handling post-award.
Required documents include GST registration, PAN card, experience certificates in telecom fiber services, financial statements, EMD/security deposit, technical bid, OEM authorizations if needed, and SLA/ATC compliance evidence. Ensure submission aligns with ITB/ATC attachments.
Technical scope covers fiber leasing connectivity for Link-I and Link-II in Vijayawada with 1-week delivery timelines. Attach SLA amendments, ITB/ATC documents, and ensure IP-based eligibility checks are satisfied to avoid rejection.
Delivery for both Link-I and Link-II connections is required within 1 week of order placement, as specified in the buyer terms and SLA attachments. Timely deployment is critical for contract alignment and performance monitoring.
Payment terms are defined in the ITB/ATC and SLA documents, including milestones and security deposits. Vendors should prepare a financial package reflecting SLA-based payments and any advance/retention terms as specified by POWERGRID.
Submit post-award grievances via POWERGRID’s Vendor Grievance Portal (VGP) at the provided URL. Include contract details, issue category, and supporting documents. The portal facilitates timely resolution of payment or performance concerns under the ISI framework.
📍 BANGALORE, KARNATAKA
📍 BANGALORE, KARNATAKA
Powergrid Teleservices Limited
📍 North Goa, GOA
Powergrid Teleservices Limited
📍 North Goa, GOA
Bharat Sanchar Nigam Limited Portal(bsnl)
📍 KAMRUP, ASSAM
Sign up now to access all documents
Main Document
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS