Progress
Quantity
1
Bid Type
Two Packet Bid
Central Transmission Utility Of India Limited seeks an Independent Engineer (milestone/deliverable-based) for the Transmission System for Evacuation of Power from Potential Renewable Energy Zone in Khavda Area of Gujarat Under Phase V (8GW) Part C. The assignment is located in GURGAON, HARYANA and involves oversight of the power evacuation infrastructure for a major renewable energy corridor. The bid carries an EMD of ₹704,000. The scope is defined through RFP documents on the GeM portal, with ATC terms taking precedence over standard GeM GTC/SLA. The appointed EIC will report to the designated Manager, PMP (as per Buyer ATC). This procurement emphasizes milestone-based deliverables and technical oversight of complex transmission works, requiring robust project management and compliance capabilities. Key differentiators include alignment with Phase V (8GW) targets and the Khavda area’s grid integration requirements.
Independent Engineer for Transmission System oversight
Khavda Renewable Energy Zone, Gujarat; Phase V (8GW) Part C
Milestone/Deliverable based engagement
RFP ATC terms govern; GeM GTC/SLA superseded
Milestone-based contract with defined deliverables
EMD ₹704000; submission as per RFP ATC
RFP documents supersede GeM terms; EIC identified
Payment to be released based on milestone achievements as defined in the RFP; EMD ₹704000 to be deposited in specified mode.
Delivery milestones to be specified in the RFP; adherence required with project timelines and acceptance criteria.
LD/penalty terms to be as per RFP provisions; details to be provided in tender documents.
Experience in independent engineer roles for large-scale transmission projects
Demonstrated capability in milestone/deliverable-based consulting assignments
Financial stability as per RFP requirements and approved turnover
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Transmission System for Evacuation of Power from Potential Renewable Energy Zone in Khavda Area of Gujarat Under Phase V (8GW) Part C; Energy (Oil, Gas, Pow..
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
Permanent Account Number (PAN) card
Experience certificates for similar NEA/Transmission EPC/IE roles
Financial statements or turnover proof as required by RFP
EMD submission document (₹704000) as per payment terms
Technical bid documents demonstrating relevant consulting capabilities
OEM authorisations or consultancy firm credentials if applicable
Extended Deadline
22-May-2026, 3:00 pm
Opening Date
22-May-2026, 3:30 pm
Extended Deadline
18-May-2026, 3:00 pm
Opening Date
18-May-2026, 3:30 pm
Key insights about HARYANA tender market
Bidders must submit as per RFP ATC, including EMD ₹704000 and technical bid proving experience in transmission engineering. Ensure GeM portal submission follows the RFP documents, and provide the EIC details and organizational credentials. Final acceptance depends on milestone-based deliverables outlined in the RFP.
Submit GST, PAN, experience certificates in similar transmission projects, financial statements, EMD document of ₹704000, technical compliance certificates, and any OEM authorizations. All documents must align with the RFP ATC terms superseding GeM GTC.
Milestones are defined in the RFP documents; milestones govern payment and acceptance. The IE must demonstrate timely achievement of each milestone per the project schedule and provide progress reports to the Engineer-In-Charge, Shri Rakesh Ranjan Sharma.
Standards are specified in the RFP ATC; ensure compliance with any IS or national standards cited therein. Maintain required certifications for consulting in large-scale transmission projects and provide compliance evidence in the technical bid.
EMD of ₹704000 must be submitted as per RFP ATC requirements; payment mode and submission deadline are specified in the tender documentation and ATC file on GeM.
The Engineer-In-Charge is Shri Rakesh Ranjan Sharma; the IE coordinates with PMP and provides technical oversight, milestone verification, and acceptance decisions for the transmission system for evacuation from the Khavda renewable zone.
The procurement is for an Independent Engineer for the Khavda area in Gujarat under Phase V (8GW) with oversight from CTUIL, while the contract is processed via the GeM-based RFP and ATC terms.
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS