Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil
Eastern Railway
HOWRAH, WEST BENGAL
Bid Publish Date
24-Feb-2026, 9:49 am
Bid End Date
06-Mar-2026, 9:00 pm
Location
Progress
Quantity
10
Bid Type
Two Packet Bid
Local Self Government Department Kerala invites bids for a Water Purification System with UV/UF (V2) including a Storage Tank and built-in self-contained water cooler. The scope encompasses the Type of Water Purification Technology, Rate of Flow (LPH), mounting method, guaranteed output water quality, and the inclusion of a Water Storage Tank with specified capacity and material. The tender emphasizes a formal test report from a Central Government/NABL/ILAC-accredited lab to prove conformity. A 25% quantity option can be exercised during or after contract award, with delivery time recalculated as (additional quantity / original quantity) × original delivery period, minimum 30 days. The procurement target is governed by mandatory terms on quantity variation, bidder financial health, and turnover requirements.
Water purification technology: UV/UF with optional UV+UF configuration
Flow rate: specify rated LPH per site requirement
Storage tank: included; specify capacity in liters and material
Tank location/type: per site layout; domestic water cooler integration possible
Test report: must be from Central Govt/NABL/ILAC-accredited lab
Mounting: wall or floor mounting as per installation site
Qualification: OEM authorization required for distributors
Delivery time: baseline defined; option to extend with 30-day minimum
25% quantity variation rights during/after contract
3-year govt/PSU supplying experience required
OEM authorization and turnover criteria must be met
Delivery period and payment terms TBD; minimum 30 days for extended period
Not explicitly defined in data; contract may specify staged payments aligned with delivery milestones
Delivery starts from last date of original delivery order; extended delivery time uses (additional/original) × original period with minimum 30 days
Not detailed; standard govt tender practice may apply LDs for late delivery or failure to meet specs
3 years of supplying water purification products to central/state govt or PSU
OEM authorization in place for distributors submitting bids
Minimum average turnover over last 3 years as per bid document; audited statements
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Eastern Railway
HOWRAH, WEST BENGAL
Uttar Pradesh Police
LUCKNOW, UTTAR PRADESH
Modern Coach Factory Raebareli
N/a
SABARKANTHA, GUJARAT
Eastern Railway
HOWRAH, WEST BENGAL
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Features and Performance | Type of Water Purification Technology | Generally Conformity to IS 14724 for Ultraviolet (UV) |
| Features and Performance | Rate of Flow (In LPH) of purified water | upto 50 LPH |
| Features and Performance | Method of Mounting | Countertop/Wall Mount |
| Features and Performance | Guaranteed output water quality | As per IS 10500 or better |
| Water Storage | Storage Tank (inclusive in the scope of supply) | Yes |
| Water Storage | Type of Water Tank / Location | In-Built Storage Tank |
| Water Storage | Storage Tank Material | ABS/PP Food Grade |
| Water Storage | Storage Tank Capacity (in Ltr) | upto 20 Liters |
| Water Storage | Self Contained Water Cooler | NA |
| Certification / Test Report | Availability of Test Report From Central Govt/Nabl/Ilac Accredited Lab to Prove Conformity to Specification | No |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate for turnover (last 3 years)
Experience certificates and contract copies for similar govt supply
Manufacturer Authorization/OEM authorization documentation
Technical compliance certificates and test reports (central govt/NABL/ILAC)
Bid security/EMD documentation (as applicable by tender rules)
Supporting documents for installation/site readiness and warranty terms
Bidders should ensure 3 years govt supply experience, provide OEM authorization, submit audited turnover statements for the last 3 years, and attach a NABL/Central Govt test report for UV/UF water purification conformity. Include GST, PAN, EMD docs, and installation capability details. Follow the option clause for quantity variation.
Required documents include GST certificate, PAN, turnover proof, experience contracts, OEM authorization, technical compliance certificates, NABL/test reports, EMD security, and bid submission forms. Ensure contracts show quantity for each year and site installation capability.
Specifications include UV/UF purification technology, rated LPH flow, integrated storage tank with specified capacity, mounting type, guaranteed water quality, and a validation test from a Central Govt/NABL/ILAC-accredited lab. Ensure storage tank material aligns with site conditions.
Delivery period starts from the last date of the original delivery order; additional quantity time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The purchaser may extend delivery within the contract scope.
Distributors must submit an OEM authorization certificate detailing name, designation, address, email, and phone number. This ensures technical compliance and after-sales support for the water purifier system in government procurement.
Bidders must show minimum average annual turnover over the last 3 years as specified in the bid document, supported by audited statements or CA certificate. OEMs must also meet turnover criteria for the offered product across the same period.
A test report from a Central Government lab or NABL/ILAC-accredited lab is required to prove conformity to the water purification specification. The report should cover UV/UF performance, output quality, and storage tank compliance with indicated capacities.
The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during currency. Time extensions are calculated per the formula with a minimum 30 days, enabling supply flexibility for demand fluctuations.
Odisha Police
📍 CUTTACK, ODISHA
Health Services
📍 AIZAWL, MIZORAM
West Central Railway
📍 KOTA, RAJASTHAN
South Western Railway
Reserve Bank Of India (rbi)
📍 THIRUVANANTHAPURAM, KERALA
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS