Bharat Heavy Electricals Limited (BHEL) Generator End Winding Vibration Monitoring System Tender India 2026

Bid Publish Date

09-Oct-2026, 11:00 am

Bid End Date

19-Oct-2026, 3:00 pm

Progress

Issue09-Oct-2026, 11:00 am
AwardPending

Key Highlights

  • • Brand/OEM requirements: fibre optic sensors with conditioners and integrated cables (6 m, 10 m) for generator EW vibration monitoring
  • • Technical certifications: explicit standards not listed; bidders should confirm IS/IEC compatibility during bid submission
  • • Delivery/option clause: +/- 25% quantity adjustment at contract and during currency with rates preserved
  • • Commissioning scope: commissioning of fibre optic generator end winding vibration monitoring system

Tender Overview

Bharat Heavy Electricals Limited (BHEL) invites bids for a range of fibre optic generator end winding vibration monitoring solutions, including panels and accessories, junction boxes, and commissioning services. The scope covers fibre optic sensors with conditioners and integrated cables of 6 m and 10 m lengths, plus a 16-channel monitoring system. The procurement encompasses components for generator end winding vibration monitoring and related laptop/servicing support, with multiple item codes indicating modular sub-systems. The buyer emphasizes flexibility in quantities under option terms and a delivery framework linked to contract performance, signaling a comprehensive instrumentation and monitoring package for power generation equipment.

Technical Specifications & Requirements

  • Product family: Fibre optic generator end winding vibration monitoring system, panels and accessories, junction boxes
  • Sensor sets: Fibre optic sensor with conditioner, 6 m integrated cable; fibre optic sensor with conditioner, 10 m integrated cable
  • Channels: 16-channel monitoring system within the generator end winding monitoring portfolio
  • Delivery/installation: Commissioning of fibre optic generator end winding monitoring system; delivery terms include option to adjust quantity up to 25% during contract
  • Supporting hardware: Laptop/servicing assets included in the scope; multiple BOQ items suggest modular installation
  • Standards/quality: Not specified in the data; bidders should confirm IS/IEC compatibility during submission
  • Geography: India-wide procurement with a focus on generation equipment monitoring

Terms, Conditions & Eligibility

  • Option clause: Purchaser may increase/decrease quantity by up to 25% at contract placement and during currency at contracted rates
  • Delivery timeframe: Increases in delivery time calculated as (Additional quantity / Original quantity) × Original delivery period, with a minimum of 30 days
  • Delivery extension: May extend calculated delivery up to the original delivery period subject to option exercise
  • Bid compliance: Bidders must comply with these terms and ensure readiness for potential quantity adjustments

Key Specifications

  • Fibre optic generator end winding vibration monitoring system

  • 6 m integrated cable for fibre optic sensor with conditioner

  • 10 m integrated cable for fibre optic sensor with conditioner

  • 16-channel monitoring capability

  • Panel & accessories, junction box for FEW vibration monitoring

  • Commissioning of fibre optic FEW vibration monitoring system

Terms & Conditions

  • 25% quantity variation permitted during contract and currency

  • Delivery time calculation with minimum 30 days extension

  • Commissioning and laptop/serving support included

  • ATC document referenced for buyer-added terms

  • EMD, GST, PAN, and certifications required with bid

Important Clauses

Payment Terms

Not specified in the provided data; bidders should review ATC document for advance and milestone payments

Delivery Schedule

Delivery period adjusts by (additional quantity/original quantity) × original delivery period with a minimum of 30 days

Penalties/Liquidated Damages

Not specified in the current data; verify in ATC for LD provisions and performance guarantees

Bidder Eligibility

  • Experience in supplying fibre optic vibration monitoring systems for generator sets or similar power equipment

  • Financial stability demonstrated by recent statements

  • OEM authorization for fibre optic sensors and conditioners used in EW vibration monitoring

Advertisement

Tender Data

Bid Details

Quantity

12

Category

W90418109192 FIBRE OPTIC SENSOR WITH CONDITIONER& 6 MTR INTEGRATED CABLE FOR GENERATOR EW VIBRATION

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

W90418109168 PANEL & ACCESSORIES FOR GEN. END WINDING VIBRATION MONIT. SYSTEM INCLUDING LAPTOP/ SERV , W90418109176 JUNCTION BOX AND ACCESSORIES FOR FO END WNDG VIBRATION MON. SYSTEM , W90418109133 COMMISSIONING OF FIBRE OPTIC GENERATOR END WINDING VIB. MONITORING SYSTEM , W90418109192 FIBRE OPTIC SENSOR WITH CONDITIONER& 6 MTR INTEGRATED CABLE FOR GENERATOR EW VIBRATION , W90418109206 FIBRE OPTIC SENSOR WITH CONDITIONER& 10MTR INTEGRATED CABLE FOR GENERATOR EW VIBRATION , W90418109141 FIBRE OPTIC GENERATOR END WINDING VIBRATION MONITORING SYSTEM FOR 16 CHANNELS ALONGWI H

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

1

Delivery Locations

1

Delivery Cities

Fatehabad

Delivery Pincodes

125047

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sumit Sharma125047,Bharat Heavy Electricals Limited Site Office Gorakhpur Haryana Anu Vidyut Pariyojana ( GHAVP) Village & Post : Gorakhpur Tehsil : Bhuna District : Fatehabad, Haryana- 125047FatehabadHaryana125047-1-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9996007.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Categories 27

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar fibre optic vibration monitoring projects

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documentation

6

Technical bid documents and compliance statements

7

OEM authorization/documentation for fibre optic sensors and conditioners

8

Any standard conformity certificates (provisional/isolation if applicable)

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for BHEL fibre optic vibration monitor tender in India 2026?

Bidders should submit GST, PAN, financials, experience certificates, EMD documentation, OEM authorizations, and technical compliance. The ATC includes option-based quantity adjustments up to 25% and a delivery extension rule with a 30-day minimum. Ensure the fibre optic EW monitoring system meets 16-channel capacity and includes 6 m or 10 m integrated cables.

What documents are required for BHEL EW vibration monitoring tender 2026?

Required documents include GST registration, PAN, last 3 years financial statements, experience certificates for related projects, EMD, OEM authorizations for fibre optic sensors, technical bid and compliance certificates, and delivery/commercial terms as per ATC guidelines.

What are the technical specifications for 16-channel FEW monitoring system tender?

The tender specifies a fibre optic generator end winding vibration monitoring system with 16-channel capacity, panels and accessories, junction boxes, and 6 m or 10 m integrated cables with conditioners. Commissioning is included; exact IS/IEC standard alignment should be confirmed during bid submission.

When is the delivery extension policy for quantity variations in this tender?

Delivery extensions follow the rule: (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. The purchaser may extend up to the original delivery period after option exercise, ensuring schedule flexibility for bidders.

What is the scope of commissioning for the fibre optic EW monitoring system?

Commissioning covers installation and startup of the fibre optic generator end winding vibration monitoring system, including laptop/servicing support and integration with the monitoring channels. Bidders must plan for field testing and system validation per project requirements.

What are the required OEM authorizations for this BHEL procurement?

Bidders must supply OEM authorizations for fibre optic sensors and conditioners used in the generator end winding vibration monitoring system, demonstrating valid distribution rights and technical support capabilities for the equipment.

What are the key eligibility criteria for submitting in this tender in India?

Eligibility includes prior experience in supplying EW vibration monitoring or similar fibre optic systems, demonstrated financial stability with recent statements, GST and PAN verification, and compliance with ATC terms on quantity adjustments and delivery timetables.

What happens if quantities change by the 25% option clause in this tender?

If quantities change by up to 25%, the contract value remains at contracted rates. Delivery schedules adjust per the extension formula with a minimum 30-day increment, and the supplier must maintain performance at the original rates.