TenderDekho Logo
GEM

Cochin Shipyard Ltd Digital Plotting Table with Autoplotter Tender Kerala 2026

Bid Publish Date

30-Jun-2026, 8:54 am

Bid End Date

20-Jul-2026, 3:00 pm

Progress

Issue30-Jun-2026, 8:54 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

36

Category

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

Bid Type

Two Packet Bid

Key Highlights

  • Co chin Shipyard registration requirement for bid participation
  • Quantity variation up to 25% during contract and currency delivery extension rules
  • Integrity Pact submission mandatory with bid
  • GST guidance and reimbursement framework linked to actuals
  • Onboard spares, installation, commissioning, and training included
  • 24-item BOQ with unspecified quantities but multi-model autoplotter integration
  • QC receipt inspection by Buyer or external agency

Categories 1

Tender Overview

The procurement is issued by Cochin Shipyard Ltd for digital plotting table systems with autoplotters (By 531, 532, 533-534, 535-536), including onboard spares, installation, commissioning, documentation, and training. Location: Ernakulam, Kerala 682001. The BOQ lists 24 items with unspecified quantities, indicating a multi-model plotter setup and related services, with emphasis on delivery and integrated support. The bid allows quantity variation up to 25% of bid quantity and includes post-order adjustments within contracted rates. A mandatory vendor registration with Cochin Shipyard is required, plus GST and tax compliance. An Integrity Pact is mandated, and the schedule may be postponed up to six months without cost implications. The tender emphasizes non-toxic materials and QC receipt inspection by the buyer or nominated external agency.

Technical Specifications & Requirements

  • Product category: Digital plotting tables with autoplotters (By 531, 532, 533-534, 535-536) with onboard spares and installation/commissioning.
  • Services: Documentation, training by 531-536 series, and related onboard spares.
  • Standards/Certifications: Not specified; emphasis on integration with Cochin Shipyard infrastructure and QC receipt verification.
  • Delivery/Acceptance: Option clause for quantity variation up to 25%, delivery schedule linked to last delivery order date; post-delivery adjustment window and minimum 30 days incremental time.
  • Documentation: GST registration guidance, potential GST reimbursement rules, and Integrity Pact submission.

Terms, Conditions & Eligibility

  • EMD: Not specified in data; vendor must meet registration with Cochin Shipyard.
  • Payment: GST considerations clarified; GST on actuals; online GST invoice submission required.
  • Eligibility: Registration/enlistment with Cochin Shipyard for required goods/services on bid opening date; signed Integrity Pact.
  • Delivery: Option clause and delivery extension mechanics; six-month postponement permitted by buyer without cost.
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate copy required for vendor code creation, GST invoice upload on GeM post-invoice, and inspection by QC.
  • Warranty/Penalties: Not detailed; inspection and acceptance by buyer QC or nominated agency.

Key Specifications

    • Product/service names: Digital plotting table with autoplotter (By 531/532/533-534/535-536) with onboard spares
    • Quantity/Scope: 24 items listed in BOQ; exact quantities not disclosed
    • Estimated value: Not specified
    • Standards/Certifications: Not specified; emphasis on integration and QC inspection
    • Delivery/Installation: Includes installation and commissioning and training by model group
    • Eligibility: Must be registered/enlisted with Cochin Shipyard on bid opening date

Terms & Conditions

  • Option to increase/decrease quantity up to 25% at contract, with extended delivery time formula

  • GST treatment on actuals; bidder bears GST calculations; GST invoice submission on GeM

  • Mandatory Integrity Pact and Cochin Shipyard vendor registration

Important Clauses

Payment Terms

GST reimbursement will be as per actuals, or applicable rates, with maximum quoted GST%; payment subject to GST invoice submission on GeM

Delivery Schedule

Option quantities and delivery period extendable; additional time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not explicitly specified; delivery postponement up to 6 months allowed without cost implication

Bidder Eligibility

  • Registered/enlisted with Cochin Shipyard for required goods/services on bid opening date

  • Signed Integrity Pact uploaded with bid

  • GST registration and PAN details provided with bid

  • Evidence of EFT mandate and bank verification

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531 , ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 531 , INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531 , DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531 , DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532 , ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 532 , INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532 , DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532 , DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534 , ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 533_BY 534 , INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534 , DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534 , DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536 , ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 535_BY 536 , INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536 , DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536 , INSTALLATION_COMMISSIONING_BY 531 , TRAINING_BY 531 , INSTALLATION_COMMISSIONING_BY 532 , TRAINING_BY 532 , INSTALLATION_COMMISSIONING_BY 533_BY 534 , TRAINING_BY 533_BY 534 , INSTALLATION_COMMISSIONING_BY 535_BY 536 , TRAINING_BY 535_BY 536

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYSPUBLIC ENTERPRISES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9532474.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

1 set Delivery: 520 days
#2

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 531

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 531

1 set Delivery: 520 days
#3

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

1 set Delivery: 520 days
#4

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 531

1 set Delivery: 520 days
#5

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532

1 set Delivery: 750 days
#6

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 532

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 532

1 set Delivery: 750 days
#7

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532

1 set Delivery: 750 days
#8

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 532

1 set Delivery: 750 days
#9

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534

2 set Delivery: 900 days
#10

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 533_BY 534

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 533_BY 534

2 set Delivery: 900 days
#11

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534

2 set Delivery: 900 days
#12

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 533_BY 534

2 set Delivery: 900 days
#13

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536

DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536

2 set Delivery: 1,060 days
#14

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 535_BY 536

ONBOARD SPARES FOR DIGITAL PLOTTINGTABLE WITH AUTOPLOTTER_BY 535_BY 536

2 set Delivery: 1,060 days
#15

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536

INSTALLATION AND COMMISIONING SPARES FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536

2 set Delivery: 1,060 days
#16

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536

DOCUMENTATION FOR DIGITAL PLOTTING TABLE WITH AUTOPLOTTER_BY 535_BY 536

2 set Delivery: 1,060 days
#17

INSTALLATION_COMMISSIONING_BY 531

INSTALLATION_COMMISSIONING_BY 531

1 au Delivery: 580 days
#18

TRAINING_BY 531

TRAINING_BY 531

1 au Delivery: 580 days
#19

INSTALLATION_COMMISSIONING_BY 532

INSTALLATION_COMMISSIONING_BY 532

1 au Delivery: 820 days
#20

TRAINING_BY 532

TRAINING_BY 532

1 au Delivery: 820 days
#21

INSTALLATION_COMMISSIONING_BY 533_BY 534

INSTALLATION_COMMISSIONING_BY 533_BY 534

2 au Delivery: 980 days
#22

TRAINING_BY 533_BY 534

TRAINING_BY 533_BY 534

2 au Delivery: 980 days
#23

INSTALLATION_COMMISSIONING_BY 535_BY 536

INSTALLATION_COMMISSIONING_BY 535_BY 536

2 au Delivery: 1,120 days
#24

TRAINING_BY 535_BY 536

TRAINING_BY 535_BY 536

2 au Delivery: 1,120 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate copy certified by Bank

5

Integrity Pact signed copy

6

GST invoice and GST portal payment confirmation (during invoicing)

7

Evidence of Cochin Shipyard registration/enlistment for required goods/services

8

Any OEM authorizations or technical compliance certificates if applicable

Frequently Asked Questions

Key insights about KERALA tender market

How to bid on digital plotting table tender in Kerala 2026

Bidders must be registered with Cochin Shipyard for the required goods/services, sign the Integrity Pact, and submit PAN, GSTIN, cancelled cheque, EFT mandate, and GST-compliant invoices. The bid allows quantity variation up to 25% and includes installation, commissioning, training, and documentation.

What documents are required for plotting table tender in Ernakulam

Submit PAN Card, GSTIN, Cancelled Cheque, EFT Mandate letter, Integrity Pact, OEM authorizations if applicable, and evidence of Cochin Shipyard registration. Ensure GST invoices are uploaded in GeM with payment confirmations for GST portal verification.

What are the delivery terms for Cochin Shipyard autoplotter tender

Delivery may be extended via the option clause up to 25% quantity changes; additional time calculation is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with potential extension up to original delivery period.

Which standards or certifications are required for plotting table bids

No explicit standards listed; emphasis on integration with shipyard processes, non-toxic materials where applicable, and QC receipt inspections by buyer QC or nominated agency.

What is the eligibility for training and support in this tender

The contract includes installation, commissioning, and training for plotting table with autoplotter series 531-536; bidder must provide adequate training coverage across all six model groups and ensure onboard spares availability.

When is GST payment and invoicing required for this bid

Bidders must upload scanned GST invoice and GST portal payment confirmation at invoice generation on GeM; GST reimbursement is based on actuals or applicable rates, whichever is lower.

What is the scope of onboard spares and documentation

Scope includes onboard spares for multiple autoplotter configurations (531-536), along with comprehensive documentation for each plotting table, installation notes, and training materials; the 24-item BOQ indicates a multi-model configuration.

How to ensure compliance with Cochin Shipyard vendor registration

Prospective bidders must complete registration/enlistment with Cochin Shipyard before bid opening; ensure PAN, GST, and bank details are verified, and submit Integrity Pact with bid to satisfy eligibility criteria.