TenderDekho Logo
Active GEM

Bids are Invited For Cat 6 AWG UTP Cable,Cat 6 Information Outlet,Facepalte Quad,Faceplate Dual,Faceplate Single,Backbox

Bid Publish Date

17-Jul-2026, 1:18 pm

Bid End Date

07-Aug-2026, 4:00 pm

EMD

₹4,60,000

Value

₹2,30,00,000

Progress

Issue17-Jul-2026, 1:18 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

195320

Category

Single Mode OS2 24 Core Armoured OFC Cable

Bid Type

Two Packet Bid

Categories 37

Public procurement opportunity for Border Security Force (bsf) Cat 6 AWG UTP Cable, Cat 6 Information Outlet, Facepalte Quad, Faceplate Dual, Faceplate Single, Backbox, 24 Port Loaded Jack panel, Cat 6 UTP Patch Cord 1 M, Cat 6 UTP Patch Cord 2 M, Single Mode OS2 24 Core Armoured OFC Cable, Single Mode OS2 12 Core Armoured OFC Cable, Single Mode OS2 06 Core Armoured OFC Cable, Single Mode 2 Core OFC Drop Cable, 48 Port LIU loaded with pigtails and duplex SC coupler, 24 Port LIU with pigtails and duplex SC coupler, 12 Port LIU loaded with pigtails and duplex SC coupler, 12 Port OFC Wall Mount DB loaded with pigtails and duplex SC coupler, 2 Port OFC Wall Mount Termination Box, OFC Patch Cord Simplex SC 1M, 1 64 OFC Splitter Tube Type with SC Connector, 1 32 OFC Splitter Tube Type with SC Connector, 1 16 OFC Splitter Tube Type with SC Connector, 1 8 OFC Splitter Tube Type with SC Connector, 1 4 OFC Splitter Tube Type with SC Connector, 1 2 OFC Splitter, Optical Ratio Coupler 90 10, Optical Ratio Coupler 80 20, Optical Ratio Coupler 70 30, Optical Ratio Coupler 60 40, 42U 800X1000 Network Rack with Standard Accessories, 12U 600X600 Wall Mount Rack with Standard Accessories, 9U 600X550 Wall Mount Rack with Standard Accessories, 6U wall Mount Rack with Standard Accessories, 4U Outdoor Wall Floor Mount Rack Cabinet, Indoor Cabinet 300x250x180, 2. 5 sqmm 2 Core Armoured Copper Cable, 1. 5 sqmm Copper Cable, Power Board with 3X5 15 Socket, 32mm HDPE for OFC Laying, 32mm HDPE Coupler, 25mm HDPE for Power Cable Laying, 25mm HDPE Coupler, 32mm PVC Casing, 25mm PVC Casing, 25mm PVC Flexible, Velcro Tape, OFC Cable Route Marker, Power Cable Route Marker, 6 Mtrs GI Pole for CCTV Camera, Steel Raised Access Florring FOR 120 sqft, Consumable Hardware, Laying of UTP Cat 6 Cable through PVC Casing, IO Termination with fixing of backbox and faceplate, Jackpanel Termination, Laying of OFC Cable through HDPE, Fixing of LIU, OFC Splicing, Fixing of Wall Mount OFC DB Termination Box, Installation of 42U Rack, Installation of 12U comm 9U comma 6U Rack, Fixing of 4U Outdoor Rack with RCC Foundation, Fixing of Indoor Cabinet, Laying of Armoured Copper Cable through HDPE, Laying Copper Cable 2. 5 and 1. 5, Soil Digging and Refilling, Fixing of Cable Route Marker, Foundation work for GI Pole, Installation of Steel Access Flooring System, Project Execution Managemt and Documentation. Quantity: 195320 issued by. Submission Deadline: 07-08-2026 16: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Cat 6 AWG UTP Cable , Cat 6 Information Outlet , Facepalte Quad , Faceplate Dual , Faceplate Single , Backbox , 24 Port Loaded Jack panel , Cat 6 UTP Patch Cord 1 M , Cat 6 UTP Patch Cord 2 M , Single Mode OS2 24 Core Armoured OFC Cable , Single Mode OS2 12 Core Armoured OFC Cable , Single Mode OS2 06 Core Armoured OFC Cable , Single Mode 2 Core OFC Drop Cable , 48 Port LIU loaded with pigtails and duplex SC coupler , 24 Port LIU with pigtails and duplex SC coupler , 12 Port LIU loaded with pigtails and duplex SC coupler , 12 Port OFC Wall Mount DB loaded with pigtails and duplex SC coupler , 2 Port OFC Wall Mount Termination Box , OFC Patch Cord Simplex SC 1M , 1 64 OFC Splitter Tube Type with SC Connector , 1 32 OFC Splitter Tube Type with SC Connector , 1 16 OFC Splitter Tube Type with SC Connector , 1 8 OFC Splitter Tube Type with SC Connector , 1 4 OFC Splitter Tube Type with SC Connector , 1 2 OFC Splitter , Optical Ratio Coupler 90 10 , Optical Ratio Coupler 80 20 , Optical Ratio Coupler 70 30 , Optical Ratio Coupler 60 40 , 42U 800X1000 Network Rack with Standard Accessories , 12U 600X600 Wall Mount Rack with Standard Accessories , 9U 600X550 Wall Mount Rack with Standard Accessories , 6U wall Mount Rack with Standard Accessories , 4U Outdoor Wall Floor Mount Rack Cabinet , Indoor Cabinet 300x250x180 , 2.5 sqmm 2 Core Armoured Copper Cable , 1.5 sqmm Copper Cable , Power Board with 3X5 15 Socket , 32mm HDPE for OFC Laying , 32mm HDPE Coupler , 25mm HDPE for Power Cable Laying , 25mm HDPE Coupler , 32mm PVC Casing , 25mm PVC Casing , 25mm PVC Flexible , Velcro Tape , OFC Cable Route Marker , Power Cable Route Marker , 6 Mtrs GI Pole for CCTV Camera , Steel Raised Access Florring FOR 120 sqft , Consumable Hardware , Laying of UTP Cat 6 Cable through PVC Casing , IO Termination with fixing of backbox and faceplate , Jackpanel Termination , Laying of OFC Cable through HDPE , Fixing of LIU , OFC Splicing , Fixing of Wall Mount OFC DB Termination Box , Installation of 42U Rack , Installation of 12U comm 9U comma 6U Rack , Fixing of 4U Outdoor Rack with RCC Foundation , Fixing of Indoor Cabinet , Laying of Armoured Copper Cable through HDPE , Laying Copper Cable 2.5 and 1.5 , Soil Digging and Refilling , Fixing of Cable Route Marker , Foundation work for GI Pole , Installation of Steel Access Flooring System , Project Execution Managemt and Documentation

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Budgam

Delivery Pincodes

190007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajneesh Kumar Jha190007,FTR HQ BSF KASHMIR NEAR NEW AIRPORT HUMHAMA SRINAGAR PIN 190007BudgamJammu And Kashmir1900073560-

Authority Records

MINISTRY OF HOME AFFAIRS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9502643.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 69 Items Sign in for GEM prices

#1

Cat 6 AWG UTP Cable

Cat 6 AWG UTP Cable

35 box Delivery: 60 days
#2

Cat 6 Information Outlet

Cat 6 Information Outlet

2,350 nos Delivery: 60 days
#3

Facepalte Quad

Facepalte Quad

200 nos Delivery: 60 days
#4

Faceplate Dual

Faceplate Dual

100 nos Delivery: 60 days
#5

Faceplate Single

Faceplate Single

1,330 nos Delivery: 60 days
#6

Backbox

Backbox

1,700 nos Delivery: 60 days
#7

24 Port Loaded Jack panel

24 Port Loaded Jack panel

4 nos Delivery: 60 days
#8

Cat 6 UTP Patch Cord 1 M

Cat 6 UTP Patch Cord 1 M

1,200 nos Delivery: 60 days
#9

Cat 6 UTP Patch Cord 2 M

Cat 6 UTP Patch Cord 2 M

1,200 nos Delivery: 60 days
#10

Single Mode OS2 24 Core Armoured OFC Cable

Single Mode OS2 24 Core Armoured OFC Cable

4,000 mtrs Delivery: 60 days
#11

Single Mode OS2 12 Core Armoured OFC Cable

Single Mode OS2 12 Core Armoured OFC Cable

5,000 mtrs Delivery: 60 days
#12

Single Mode OS2 06 Core Armoured OFC Cable

Single Mode OS2 06 Core Armoured OFC Cable

26,000 mtrs Delivery: 60 days
#13

Single Mode 2 Core OFC Drop Cable

Single Mode 2 Core OFC Drop Cable

15,000 mtrs Delivery: 60 days
#14

48 Port LIU loaded with pigtails and duplex SC coupler

48 Port LIU loaded with pigtails and duplex SC coupler

25 nos Delivery: 60 days
#15

24 Port LIU with pigtails and duplex SC coupler

24 Port LIU with pigtails and duplex SC coupler

35 nos Delivery: 60 days
#16

12 Port LIU loaded with pigtails and duplex SC coupler

12 Port LIU loaded with pigtails and duplex SC coupler

70 nos Delivery: 60 days
#17

12 Port OFC Wall Mount DB loaded with pigtails and duplex SC coupler

12 Port OFC Wall Mount DB loaded with pigtails and duplex SC coupler

100 nos Delivery: 60 days
#18

2 Port OFC Wall Mount Termination Box

2 Port OFC Wall Mount Termination Box

400 nos Delivery: 60 days
#19

OFC Patch Cord Simplex SC 1M

OFC Patch Cord Simplex SC 1M

1,000 nos Delivery: 60 days
#20

1 64 OFC Splitter Tube Type with SC Connector

1 64 OFC Splitter Tube Type with SC Connector

4 nos Delivery: 60 days
#21

1 32 OFC Splitter Tube Type with SC Connector

1 32 OFC Splitter Tube Type with SC Connector

10 nos Delivery: 60 days
#22

1 16 OFC Splitter Tube Type with SC Connector

1 16 OFC Splitter Tube Type with SC Connector

10 nos Delivery: 60 days
#23

1 8 OFC Splitter Tube Type with SC Connector

1 8 OFC Splitter Tube Type with SC Connector

20 nos Delivery: 60 days
#24

1 4 OFC Splitter Tube Type with SC Connector

1 4 OFC Splitter Tube Type with SC Connector

20 nos Delivery: 60 days
#25

1 2 OFC Splitter

1 2 OFC Splitter

500 nos Delivery: 60 days
#26

Optical Ratio Coupler 90 10

Optical Ratio Coupler 90 10

16 nos Delivery: 60 days
#27

Optical Ratio Coupler 80 20

Optical Ratio Coupler 80 20

5 nos Delivery: 60 days
#28

Optical Ratio Coupler 70 30

Optical Ratio Coupler 70 30

5 nos Delivery: 60 days
#29

Optical Ratio Coupler 60 40

Optical Ratio Coupler 60 40

5 nos Delivery: 60 days
#30

42U 800X1000 Network Rack with Standard Accessories

42U 800X1000 Network Rack with Standard Accessories

1 no Delivery: 60 days
#31

12U 600X600 Wall Mount Rack with Standard Accessories

12U 600X600 Wall Mount Rack with Standard Accessories

3 nos Delivery: 60 days
#32

9U 600X550 Wall Mount Rack with Standard Accessories

9U 600X550 Wall Mount Rack with Standard Accessories

10 nos Delivery: 60 days
#33

6U wall Mount Rack with Standard Accessories

6U wall Mount Rack with Standard Accessories

30 nos Delivery: 60 days
#34

4U Outdoor Wall Floor Mount Rack Cabinet

4U Outdoor Wall Floor Mount Rack Cabinet

50 nos Delivery: 60 days
#35

Indoor Cabinet 300x250x180

Indoor Cabinet 300x250x180

400 nos Delivery: 60 days
#36

2.5 sqmm 2 Core Armoured Copper Cable

2.5 sqmm 2 Core Armoured Copper Cable

10,000 mtrs Delivery: 60 days
#37

1.5 sqmm Copper Cable

1.5 sqmm Copper Cable

2,000 mtrs Delivery: 60 days
#38

Power Board with 3X5 15 Socket

Power Board with 3X5 15 Socket

200 nos Delivery: 60 days
#39

32mm HDPE for OFC Laying

32mm HDPE for OFC Laying

22,000 mtrs Delivery: 60 days
#40

32mm HDPE Coupler

32mm HDPE Coupler

500 nos Delivery: 60 days
#41

25mm HDPE for Power Cable Laying

25mm HDPE for Power Cable Laying

9,000 mtrs Delivery: 60 days
#42

25mm HDPE Coupler

25mm HDPE Coupler

100 nos Delivery: 60 days
#43

32mm PVC Casing

32mm PVC Casing

4,000 mtrs Delivery: 60 days
#44

25mm PVC Casing

25mm PVC Casing

6,000 mtrs Delivery: 60 days
#45

25mm PVC Flexible

25mm PVC Flexible

10 pkt Delivery: 60 days
#46

Velcro Tape

Velcro Tape

5 pkt Delivery: 60 days
#47

OFC Cable Route Marker

OFC Cable Route Marker

250 nos Delivery: 60 days
#48

Power Cable Route Marker

Power Cable Route Marker

50 nos Delivery: 60 days
#49

6 Mtrs GI Pole for CCTV Camera

6 Mtrs GI Pole for CCTV Camera

30 nos Delivery: 60 days
#50

Steel Raised Access Florring FOR 120 sqft

Steel Raised Access Florring FOR 120 sqft

1 lot Delivery: 60 days
#51

Consumable Hardware

Consumable Hardware

1 lot Delivery: 60 days
#52

Laying of UTP Cat 6 Cable through PVC Casing

Laying of UTP Cat 6 Cable through PVC Casing

10,675 mtrs Delivery: 60 days
#53

IO Termination with fixing of backbox and faceplate

I O Termination with fixing of backbox and faceplate

1,700 nos Delivery: 60 days
#54

Jackpanel Termination

Jackpanel Termination

4 nos Delivery: 60 days
#55

Laying of OFC Cable through HDPE

Laying of OFC Cable through HDPE

35,000 mtrs Delivery: 60 days
#56

Fixing of LIU

Fixing of LIU

130 nos Delivery: 60 days
#57

OFC Splicing

OFC Splicing

5,500 nos Delivery: 60 days
#58

Fixing of Wall Mount OFC DB Termination Box

Fixing of Wall Mount OFC DB Termination Box

500 nos Delivery: 60 days
#59

Installation of 42U Rack

Installation of 42U Rack

1 no Delivery: 60 days
#60

Installation of 12U comm 9U comma 6U Rack

Installation of 12U comma 9U comma 6U Rack

43 nos Delivery: 60 days
#61

Fixing of 4U Outdoor Rack with RCC Foundation

Fixing of 4U Outdoor Rack with RCC Foundation

50 nos Delivery: 60 days
#62

Fixing of Indoor Cabinet

Fixing of Indoor Cabinet

400 nos Delivery: 60 days
#63

Laying of Armoured Copper Cable through HDPE

Laying of Armoured Copper Cable through HDPE

10,000 mtrs Delivery: 60 days
#64

Laying Copper Cable 2.5 and 1.5

Laying Copper Cable 2.5 and 1.5

2,000 mtrs Delivery: 60 days
#65

Soil Digging and Refilling

Soil Digging and Refilling

14,000 mtrs Delivery: 60 days
#66

Fixing of Cable Route Marker

Fixing of Cable Route Marker

300 nos Delivery: 60 days
#67

Foundation work for GI Pole

Foundation work for GI Pole

30 nos Delivery: 60 days
#68

Installation of Steel Access Flooring System

Installation of Steel Access Flooring System

1 lot Delivery: 60 days
#69

Project Execution Managemt and Documentation

Project Execution Managemt and Documentation

1 lot Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer